- Participated in 151 bidding packages, of which 79 were won, 60 were lost, 8 are pending results, and 4 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 33.04% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 89.61% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Quảng Ninh (78), Đắk Nông (22), Lâm Đồng (7), Bình Thuận (6), Trà Vinh (4), Hải Phòng (4), Hải Dương (1), Hà Tĩnh (1), Undefined (28)
- Has relationships with 24 Bid Solicitors
- Has competed against 151 contractors in 106 bidding packages, won 34 packages, lost 57 packages, 11 are pending results, and 4 were canceled.
- Has collaborated with 24 contractors in 34 bidding packages, won 26 packages, lost 3 packages, 3 are pending results, and 2 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG
- Construction capacity certificate code: 00042208
- Issuing Authority: Sở kế hoạch đầu tư tỉnh Nam Định
- Field:
⚬ Thi công xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Thi công xây dựng công trình: NN&PTNT
⚬ Giám sát thi công xây dựng công trình: Công nghiệp nhẹ
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Công nghiệp nhẹ
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 15 | 19% |
Lower by 10% to 20% | 7 | 8.9% |
Lower by 5% to 10% | 13 | 16.5% |
Lower by 1% to 5% | 22 | 27.8% |
Lower by 0% to 1% | 19 | 24.1% |
0% | 1 | 1.3% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 2 | 2.5% |
Unknown | 0 | 0% |
Total | 79 | 100% |
TOAN THANG CASTING MECHANICAL COMPANY LIMITED Won the bidding for the Providing non-standard mechanical processing materials for regular repair and maintenance in 2024 package, which was invited for bidding by the DONG TRIEU THERMAL POWER COMPANY - BRANCH OF VINACOMIN - POWER HOLDING CORPORATION through an Open bidding as an independent entity. Thirteen other contractors also participated.
- Result: Won
09/10/2024 10:28
TOAN THANG CASTING MECHANICAL COMPANY LIMITED lost the bidding for the Supply of materials for coal crushing system of unit No. 4 + unit No. 2 and overhaul of coal crushing system of unit No. 2 (outsourced) + overhaul of coal crushing system of unit No. 4 package, which was invited for bidding by the HAI PHONG THERMAL POWER JOINT STOCK COMPANY through an Open bidding as master consortium of CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG. Nine other contractors also participated.
- Result: Lost
19/09/2024 15:56
TOAN THANG CASTING MECHANICAL COMPANY LIMITED lost the bidding for the 29MSHH-SCL-2024: Supply of grinding ball materials for crusher 1B, 1D, 1F unit S1 of Duyen Hai 1 Thermal Power Plant package, which was invited for bidding by the DUYEN HAI THERMAL POWER COMPANY through an Competitive Offer as an independent entity. Three other contractors also participated.
- Result: Lost
16/09/2024 17:02
TOAN THANG CASTING MECHANICAL COMPANY LIMITED Won the bidding for the Provide slag removal bar package, which was invited for bidding by the DONG TRIEU THERMAL POWER COMPANY - BRANCH OF VINACOMIN - POWER HOLDING CORPORATION through an assign shorthand as an independent entity.
- Result: Won
09/08/2024 16:38
TOAN THANG CASTING MECHANICAL COMPANY LIMITED lost the bidding for the Supply of materials for mechanical processing package, which was invited for bidding by the QUANG NINH THERMAL POWER JOINT STOCK COMPANY through an Open bidding as master consortium of CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG. Six other contractors also participated.
- Result: Lost
15/07/2024 10:05
TOAN THANG CASTING MECHANICAL COMPANY LIMITED Won the bidding for the Supplying materials for processing pads, crusher sieves and conveyor chains package, which was invited for bidding by the QUANG NINH THERMAL POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Won
09/07/2024 16:41
TOAN THANG CASTING MECHANICAL COMPANY LIMITED join for the Provide grinding balls package, which was invited for bidding by the QUANG NINH THERMAL POWER JOINT STOCK COMPANY through an Open bidding as master consortium of CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG. Five other contractors also participated.
05/07/2024 10:18
TOAN THANG CASTING MECHANICAL COMPANY LIMITED lost the bidding for the Supplying limestone crushing balls package, which was invited for bidding by the QUANG NINH THERMAL POWER JOINT STOCK COMPANY through an Open bidding as master consortium of CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG. Three other contractors also participated.
- Result: Lost
03/07/2024 18:27
TOAN THANG CASTING MECHANICAL COMPANY LIMITED lost the bidding for the 10HH-2024-Business: Providing mechanical materials package, which was invited for bidding by the UONG BI THERMAL POWER COMPANY through an Open bidding as master consortium of CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG. Eight other contractors also participated.
- Result: Lost
28/06/2024 16:06
TOAN THANG CASTING MECHANICAL COMPANY LIMITED lost the bidding for the Buy coal grinding balls to serve the production of Vung Ang 1 Power Plant in 2024 package, which was invited for bidding by the PETROVIETNAM POWER CORPORATION through an Open bidding as master consortium of CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG. Seven other contractors also participated.
- Result: Lost
27/06/2024 14:53
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder TOAN THANG CASTING MECHANICAL COMPANY LIMITED participated in 151 package, of which 79 package was won, failed 60 packages, 8 packages with no results, 4 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TOAN THANG CASTING MECHANICAL COMPANY LIMITED is related to 24 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TOAN THANG CASTING MECHANICAL COMPANY LIMITED competed with 151 contractors in 106 package, won 34 package, lost 57 package, 11 bidding package has no results, 4 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor TOAN THANG CASTING MECHANICAL COMPANY LIMITED once entered into a partnership with 24 contractors in 34 package, won bid 26 package, lost 3 package, 3 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor TOAN THANG CASTING MECHANICAL COMPANY LIMITED participated in bidding in 8 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,681 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code