Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors au lac industry investment and development company limited are as follows:
You need to Login or Sign up to view all informations.
- Participated in 42 bidding packages, of which 22 were won, 15 were lost, 2 are pending results, and 3 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 64.18% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 91.96% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hải Dương (13), Trà Vinh (5), Bắc Giang (2), Hà Nội (2), Bắc Ninh (2), Quảng Ninh (1), Hải Phòng (1), Ninh Bình (1), Phú Thọ (1), Lạng Sơn (1), Hà Nam (1), Đắk Nông (1), Undefined (11)
- Has relationships with 16 Bid Solicitors
- Has competed against 40 contractors in 25 bidding packages, won 8 packages, lost 15 packages, 0 are pending results, and 2 were canceled.
- Has collaborated with 2 contractors in 4 bidding packages, won 1 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 4 | 18.2% |
Lower by 10% to 20% | 2 | 9.1% |
Lower by 5% to 10% | 2 | 9.1% |
Lower by 1% to 5% | 6 | 27.3% |
Lower by 0% to 1% | 7 | 31.8% |
0% | 1 | 4.5% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 22 | 100% |
au lac industry investment and development company limited join for the Check and repair problems in the control circuit of field transformers 2 and 4, 3A furnace dust filter package, which was invited for bidding by the PhaLai Thermal Power Joint Stock Company through an Open bidding as an independent entity.
10/10/2024 11:10
au lac industry investment and development company limited Won the bidding for the SCTX–2024–116 Troubleshooting MCSII control circuit board and furnace dust filter field interface screen 5 - Year 2024 package, which was invited for bidding by the PhaLai Thermal Power Joint Stock Company through an Open bidding as an independent entity.
- Result: Won
24/09/2024 17:06
au lac industry investment and development company limited join for the package, which was invited for bidding by the PhaLai Thermal Power Joint Stock Company through an Open bidding as an independent entity.
13/09/2024 13:18
au lac industry investment and development company limited Won the bidding for the Repairing the weighing conveyor belt at the check-in counter, phase 2 (Replacing the weighing display information processor) - Terminal T1 BHS system package, which was invited for bidding by the NOIBAI INTERNATIONAL AIRPORT - BRANCH OF AIRPORTS CORPORATION OF VIET NAM - JSC through an Competitive Offer as an independent entity. Three other contractors also participated.
- Result: Won
10/05/2024 15:35
au lac industry investment and development company limited lost the bidding for the Repair and maintenance of quantitative conveyor belt A-04YH1S013a/b/c package, which was invited for bidding by the VINACOMIN - DAK NONG ALUMINIUM COMPANY through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
10/05/2024 15:28
au lac industry investment and development company limited Won the bidding for the Package No. 5: Supply, installation, calibration and commissioning of 2A/2B . Conveyor Coal Scales package, which was invited for bidding by the SON DONG THERMAL POWER COMPANY-BRANCH OF VINACOMIN-POWER HOLDING CORPORATION through an Competitive Offer as an independent entity. Six other contractors also participated.
- Result: Won
19/01/2024 16:12
au lac industry investment and development company limited Won the bidding for the Maintenance and maintenance of 2-line bagging machine system package, which was invited for bidding by the VICEM BUT SON CEMENT JOINT STOCK COMPANY through an Competitive Offer as an independent entity.
- Result: Won
08/08/2023 13:58
au lac industry investment and development company limited lost the bidding for the Renovating the weighing system for large size packing machines 2-7kg (02 machines) package, which was invited for bidding by the LIX DETERGENT JOINT STOCK COMPANY through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Lost
29/07/2023 13:41
au lac industry investment and development company limited lost the bidding for the Renovating the weighing system of small size packing machine 100-1500g (02 machines) package, which was invited for bidding by the LIX DETERGENT JOINT STOCK COMPANY through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Lost
29/07/2023 13:37
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder au lac industry investment and development company limited participated in 42 package, of which 22 package was won, failed 15 packages, 2 packages with no results, 3 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor au lac industry investment and development company limited is related to 16 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor au lac industry investment and development company limited competed with 40 contractors in 25 package, won 8 package, lost 15 package, 0 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor au lac industry investment and development company limited once entered into a partnership with 2 contractors in 4 package, won bid 1 package, lost 3 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor au lac industry investment and development company limited participated in bidding in 12 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,712 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code