Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors DUONG PHUOC DONG COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 80 bidding packages, of which 48 were won, 29 were lost, 3 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 19.03% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 10.41% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (21), Cà Mau (14), Cần Thơ (10), Vĩnh Long (10), Khánh Hòa (8), Lâm Đồng (3), Tây Ninh (2), An Giang (2), Đắk Lắk (2), Quảng Ninh (1), Bắc Ninh (1), Gia Lai (1), Undefined (5)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (11), Bạc Liêu (10), Cần Thơ (8), Bà Rịa - Vũng Tàu (8), Vĩnh Long (5), Cà Mau (4), Ninh Thuận (4), Khánh Hòa (4), Bình Thuận (2), Kiên Giang (2), Quảng Ninh (1), Long An (1), Tây Ninh (1), Sóc Trăng (1), Phú Yên (1), Bắc Giang (1), Bến Tre (1), Trà Vinh (1), Undefined (14)
- Has relationships with 49 Bid Solicitors
- Has competed against 432 contractors in 61 bidding packages, won 28 packages, lost 29 packages, 4 are pending results, and 0 were canceled.
- Has collaborated with 6 contractors in 6 bidding packages, won 3 packages, lost 2 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 25 | 52.1% |
| Lower by 10% to 20% | 3 | 6.3% |
| Lower by 5% to 10% | 1 | 2.1% |
| Lower by 1% to 5% | 5 | 10.4% |
| Lower by 0% to 1% | 6 | 12.5% |
| 0% | 7 | 14.6% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 1 | 2.1% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 48 | 100% |
DUONG PHUOC DONG COMPANY LIMITED join for the Tender package No 3: Repair of autoclaving machines in the Infection Control Department package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
08/01/2026 08:22
DUONG PHUOC DONG COMPANY LIMITED Won the bidding for the Package No. 02: Supply and install equipment in Ba Tri area package, which was invited for bidding by the Ban Quản lý dự án dân dụng và công nghiệp tỉnh Vĩnh Long through an Open bidding as sub-joint of LIÊN DANH TTYT KV BA TRI.
- Result: Won
19/12/2025 16:48
DUONG PHUOC DONG COMPANY LIMITED join for the Shopping for medical equipment for the second phase of 2025 package, which was invited for bidding by the through an Open bidding as an independent entity. Five other contractors also participated.
17/12/2025 09:16
DUONG PHUOC DONG COMPANY LIMITED Won the bidding for the Bidding package No. 7: Other medical equipment package, which was invited for bidding by the Trung tâm y tế khu vực Đức Trọng through an Open bidding as sub-joint of Liên danh nhà thầu Công ty Bình Minh – Dương Phước Đông. One other contractors also participated.
- Result: Won
16/12/2025 10:28
DUONG PHUOC DONG COMPANY LIMITED Won the bidding for the Comprehensive repair service of VPRO-I Plus Machine of Infection Control to ensure medical examination and treatment activities of Nguyen Trai Hospital package, which was invited for bidding by the Bệnh viện Nguyễn Trãi through an CGTTRG as an independent entity.
- Result: Won
10/12/2025 09:54
DUONG PHUOC DONG COMPANY LIMITED join for the Bidding package No. 7: Other medical equipment package, which was invited for bidding by the DUC TRONG REGIONAL HEALTH CENTER through an Open bidding as sub-joint of CÔNG TY TNHH DƯƠNG PHƯỚC ĐÔNG. One other contractors also participated.
- Result: Tender opening completed
21/11/2025 14:24
DUONG PHUOC DONG COMPANY LIMITED lost the bidding for the Procurement of equipment for infection control package, which was invited for bidding by the BỆNH VIỆN TRƯỜNG ĐẠI HỌC Y DƯỢC CẦN THƠ through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
10/11/2025 08:26
DUONG PHUOC DONG COMPANY LIMITED join for the Bidding package No. 40/2025/TB: Procurement of multi-function electric resuscitation beds and patient transport stretchers package, which was invited for bidding by the Bệnh viện đa khoa Phú Yên through an Open bidding as an independent entity. Eight other contractors also participated.
07/11/2025 10:22
DUONG PHUOC DONG COMPANY LIMITED lost the bidding for the Shopping specialized equipment in the field of health in 2025 to serve the medical examination and treatment work of Bong Son Hospital package, which was invited for bidding by the Bong Son General Hospital through an Open bidding as an independent entity. Five other contractors also participated.
- Result: Lost
03/10/2025 15:18
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder DUONG PHUOC DONG COMPANY LIMITED participated in 80 package, of which 48 package was won, failed 29 packages, 3 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DUONG PHUOC DONG COMPANY LIMITED is related to 49 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DUONG PHUOC DONG COMPANY LIMITED competed with 432 contractors in 61 package, won 28 package, lost 29 package, 4 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor DUONG PHUOC DONG COMPANY LIMITED once entered into a partnership with 6 contractors in 6 package, won bid 3 package, lost 2 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor DUONG PHUOC DONG COMPANY LIMITED participated in bidding in 12 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DUONG PHUOC DONG COMPANY LIMITED participated in bidding in 18 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor