Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
6:09 PM 09/17/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
8:28 AM 11/23/2022 |
Active |
At the request of QTHT |
|
12:32 AM 12/01/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
8:17 AM 12/09/2022 |
Active |
At the request of QTHT |
|
11:30 PM 12/04/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:34 PM 12/04/2023 |
Active |
At the request of QTHT |
|
1:52 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
6:51 AM 04/01/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors HA DONG T&T COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 15 bidding packages, of which 9 were won, 6 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 77.27% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 92.13% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Thái Nguyên (14), Lào Cai (1)
- Provinces before the merger where the contractor has participated in bidding : Bắc Kạn (12), Lào Cai (1), Thái Nguyên (1), Undefined (1)
- Has relationships with 4 Bid Solicitors
- Has competed against 18 contractors in 8 bidding packages, won 2 packages, lost 6 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 11.1% |
| Lower by 10% to 20% | 3 | 33.3% |
| Lower by 5% to 10% | 0 | 0% |
| Lower by 1% to 5% | 4 | 44.4% |
| Lower by 0% to 1% | 1 | 11.1% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 9 | 100% |
HA DONG T&T COMPANY LIMITED Won the bidding for the Connect OT transmission channels, Synchronize IT network from Bac Kan area to Thai Nguyen area package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC THÁI NGUYÊN – CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC through an CGTTRG as an independent entity.
- Result: Won
04/12/2025 16:08
HA DONG T&T COMPANY LIMITED Won the bidding for the Procurement of VTTB to handle VTDR infrastructure incidents due to storm No. 11 (MATMO) occurring in the area of the Management Team of Na Ri, Cho Moi, Vo Nhai, Dai Tu, managed by Thai Nguyen High Voltage Grid Enterprise package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC THÁI NGUYÊN – CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC through an assign shorthand as an independent entity.
- Result: Won
05/11/2025 18:57
HA DONG T&T COMPANY LIMITED Won the bidding for the Contract package: Manage, monitor, collect centralized logs for switches and firewalls of IT and OT systems via monitoring port package, which was invited for bidding by the BAC KAN POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an Open bidding as an independent entity.
- Result: Won
06/09/2024 08:59
HA DONG T&T COMPANY LIMITED join for the Contract package: Manage, monitor, collect centralized logs for switches and firewalls of IT and OT systems via monitoring port package, which was invited for bidding by the BAC KAN POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an Open bidding as an independent entity.
- Result: Tender opening completed
12/08/2024 11:31
HA DONG T&T COMPANY LIMITED lost the bidding for the Procurement of spare materials to serve the operation and troubleshooting of VTDR and IT systems package, which was invited for bidding by the BAC KAN POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an Shortened competitive offer as an independent entity. Two other contractors also participated.
- Result: Lost
10/01/2024 10:56
HA DONG T&T COMPANY LIMITED lost the bidding for the Purchasing additional CCDC to serve processing and production and business activities package, which was invited for bidding by the BAC KAN POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an Shortened competitive offer as an independent entity. Two other contractors also participated.
- Result: Lost
25/12/2023 11:36
HA DONG T&T COMPANY LIMITED join for the Procurement of spare materials to serve the operation and troubleshooting of VTDR and IT systems package, which was invited for bidding by the BAC KAN POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an Shortened competitive offer as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
11/12/2023 09:18
HA DONG T&T COMPANY LIMITED join for the Purchasing additional CCDC to serve processing and production and business activities package, which was invited for bidding by the BAC KAN POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an Shortened competitive offer as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
05/12/2023 15:04
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder HA DONG T&T COMPANY LIMITED participated in 15 package, of which 9 package was won, failed 6 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HA DONG T&T COMPANY LIMITED is related to 4 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HA DONG T&T COMPANY LIMITED competed with 18 contractors in 8 package, won 2 package, lost 6 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HA DONG T&T COMPANY LIMITED participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HA DONG T&T COMPANY LIMITED participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor