Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
2:27 PM 11/07/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
10:29 AM 11/18/2022 |
Active |
At the request of QTHT |
|
12:03 AM 12/24/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
8:33 AM 12/29/2022 |
Active |
At the request of QTHT |
|
12:01 AM 02/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
8:46 AM 03/01/2023 |
Active |
At the request of QTHT |
|
5:56 AM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:52 AM 08/18/2023 |
Active |
At the request of QTHT |
|
8:48 AM 04/15/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:40 AM 04/22/2024 |
Active |
At the request of QTHT |
|
12:05 AM 05/17/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:54 AM 06/12/2024 |
Active |
At the request of QTHT |
|
1:28 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:08 AM 07/03/2024 |
Active |
At the request of QTHT |
|
12:05 AM 07/19/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
2:41 PM 07/19/2024 |
Active |
At the request of QTHT |
|
12:07 AM 10/29/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
10:41 AM 10/30/2024 |
Active |
At the request of QTHT |
|
12:05 AM 04/16/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
7:51 AM 04/16/2025 |
Active |
At the request of QTHT |
|
12:05 AM 05/02/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:06 AM 05/05/2025 |
Active |
At the request of QTHT |
|
12:05 AM 11/22/2025 |
Pause |
Temporarily suspended due to overdue fees |
Data analysis results of DauThau.info software for contractors CÔNG TY TNHH MTV NĂNG LƯỢNG NHH are as follows:
You need to Login or Sign up to view all informations.
- Participated in 26 bidding packages, of which 8 were won, 16 were lost, 0 are pending results, and 2 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 44.93% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 90.34% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (14), Quảng Trị (4), Đắk Lắk (3), Gia Lai (1), Quảng Ngãi (1), Huế (1), Lâm Đồng (1), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : Quảng Nam (6), Đà Nẵng (4), Quảng Bình (2), Đắk Lắk (2), Phú Yên (1), Gia Lai (1), Quảng Ngãi (1), Huế (1), Undefined (8)
- Has relationships with 15 Bid Solicitors
- Has competed against 54 contractors in 22 bidding packages, won 4 packages, lost 15 packages, 1 are pending results, and 2 were canceled.
- Has collaborated with 2 contractors in 9 bidding packages, won 3 packages, lost 6 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 12.5% |
| Lower by 10% to 20% | 2 | 25% |
| Lower by 5% to 10% | 2 | 25% |
| Lower by 1% to 5% | 2 | 25% |
| Lower by 0% to 1% | 1 | 12.5% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 8 | 100% |
CÔNG TY TNHH MTV NĂNG LƯỢNG NHH lost the bidding for the Package No. 29: Supply of 110kV insulation package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY TNHH MTV NĂNG LƯỢNG NHH. Seven other contractors also participated.
- Result: Lost
13/01/2026 14:07
CÔNG TY TNHH MTV NĂNG LƯỢNG NHH Won the bidding for the GT - 57/2025: Providing tools and instruments in 2026 package, which was invited for bidding by the A VUONG HYDROPOWER JOINT STOCK COMPANY through an CGTTRG as an independent entity.
- Result: Won
24/12/2025 16:16
CÔNG TY TNHH MTV NĂNG LƯỢNG NHH lost the bidding for the Package 10.VT.SCL2026: Providing VTTB (including services) Repairing hiT 7025 optical transmission equipment#1,#2 package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY TNHH MTV NĂNG LƯỢNG NHH. Three other contractors also participated.
- Result: Lost
22/12/2025 10:27
CÔNG TY TNHH MTV NĂNG LƯỢNG NHH Won the bidding for the Package 05.VT.SCL2026: Supply of VTTB (including services) Repair of differential protection relay for 220kV busbar 220kV Hoa Khanh substation package, which was invited for bidding by the Tổng Công ty Truyền tải điện Quốc gia Công ty Truyền tải điện 2 through an Open bidding as sub-joint of Liên danh G05.VT.SCL2026- TBA 220kV Hòa Khánh.
- Result: Won
20/12/2025 15:39
CÔNG TY TNHH MTV NĂNG LƯỢNG NHH Won the bidding for the Bidding package No. 30: Supply of LBS BHS Equipment package, which was invited for bidding by the QUANG TRI POWER COMPANY through an CGTTRG as an independent entity.
- Result: Won
20/12/2025 14:47
CÔNG TY TNHH MTV NĂNG LƯỢNG NHH lost the bidding for the Procurement of insulators and accessories to serve the replacement of all insulators on the 110kV line of Dak Sin 1 Hydropower Plant package, which was invited for bidding by the VRG - DAK NONG JOINT STOCK COMPANY through an Competitive Offer as an independent entity. Five other contractors also participated.
- Result: Lost
12/12/2025 03:53
CÔNG TY TNHH MTV NĂNG LƯỢNG NHH join for the Package No. 29: Supply of 110kV insulation package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY TNHH MTV NĂNG LƯỢNG NHH. Seven other contractors also participated.
- Result: Tender opening completed
10/12/2025 16:01
CÔNG TY TNHH MTV NĂNG LƯỢNG NHH join for the Package 10.VT.SCL2026: Providing VTTB (including services) Repairing hiT 7025 optical transmission equipment#1,#2 package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY TNHH MTV NĂNG LƯỢNG NHH. Three other contractors also participated.
- Result: Tender opening completed
14/11/2025 09:10
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY TNHH MTV NĂNG LƯỢNG NHH participated in 26 package, of which 8 package was won, failed 16 packages, 0 packages with no results, 2 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH MTV NĂNG LƯỢNG NHH is related to 15 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH MTV NĂNG LƯỢNG NHH competed with 54 contractors in 22 package, won 4 package, lost 15 package, 1 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CÔNG TY TNHH MTV NĂNG LƯỢNG NHH once entered into a partnership with 2 contractors in 9 package, won bid 3 package, lost 6 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CÔNG TY TNHH MTV NĂNG LƯỢNG NHH participated in bidding in 7 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH MTV NĂNG LƯỢNG NHH participated in bidding in 8 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor