Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors NHAT TRIEU COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 146 bidding packages, of which 90 were won, 52 were lost, 3 are pending results, and 1 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 73.8% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.53% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Đà Nẵng (24), TP.Hồ Chí Minh (17), Bình Định (12), Quảng Nam (10), Hà Nội (10), Đắk Lắk (6), Gia Lai (5), Khánh Hòa (3), Phú Yên (2), Quảng Bình (1), Đắk Nông (1), Quảng Ngãi (1), Kon Tum (1), Undefined (53)
- Has relationships with 28 Bid Solicitors
- Has competed against 96 contractors in 81 bidding packages, won 25 packages, lost 51 packages, 4 are pending results, and 1 were canceled.
- Has collaborated with 10 contractors in 15 bidding packages, won 11 packages, lost 3 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: Công ty TNHH Nhất Triều
- Construction capacity certificate code: 00010000
- Issuing Authority: Sở kế hoạch đầu tư Thành phố Đà Nẵng
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: NN & PTNT
⚬ Thi công xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: NN&PTNT
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 1 | 1.1% |
Lower by 10% to 20% | 4 | 4.4% |
Lower by 5% to 10% | 4 | 4.4% |
Lower by 1% to 5% | 33 | 36.7% |
Lower by 0% to 1% | 42 | 46.7% |
0% | 6 | 6.7% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 90 | 100% |
NHAT TRIEU COMPANY LIMITED Won the bidding for the Construction of infrastructure and auxiliary equipment to serve the relocation of BTS station DLCG56 in Dak Lak province in 2024 package, which was invited for bidding by the TRUNG TÂM MẠNG LƯỚI MOBIFONE MIỀN TRUNG - CHI NHÁNH TỔNG CÔNG TY VIỄN THÔNG MOBIFONE through an assign shorthand as an independent entity.
- Result: Won
08/10/2024 16:31
NHAT TRIEU COMPANY LIMITED join for the package, which was invited for bidding by the TRUNG TÂM MẠNG LƯỚI MOBIFONE MIỀN NAM-CHI NHÁNH TỔNG CÔNG TY VIỄN THÔNG MOBIFONE through an Open bidding as an independent entity. Four other contractors also participated.
23/09/2024 09:02
NHAT TRIEU COMPANY LIMITED Won the bidding for the Repairing concrete fences at level 2 station DLEK01, Dak Lak province package, which was invited for bidding by the TRUNG TÂM MẠNG LƯỚI MOBIFONE MIỀN TRUNG - CHI NHÁNH TỔNG CÔNG TY VIỄN THÔNG MOBIFONE through an assign shorthand as an independent entity.
- Result: Won
18/09/2024 14:41
NHAT TRIEU COMPANY LIMITED lost the bidding for the Package 1: Construction and installation and supply of installation materials and accessories package, which was invited for bidding by the Viễn thông Bình Định through an Open bidding as an independent entity. Five other contractors also participated.
- Result: Lost
16/09/2024 16:18
NHAT TRIEU COMPANY LIMITED Won the bidding for the Transferring and adding auxiliary equipment to ensure network quality for stations KHVN37, KHVN63, and PYDH37 that do not have AC power package, which was invited for bidding by the TRUNG TÂM MẠNG LƯỚI MOBIFONE MIỀN TRUNG - CHI NHÁNH TỔNG CÔNG TY VIỄN THÔNG MOBIFONE through an assign shorthand as an independent entity.
- Result: Won
13/09/2024 11:27
NHAT TRIEU COMPANY LIMITED Won the bidding for the Package No. 3: Construction package, which was invited for bidding by the DANANG INTERNATIONAL AIRPORT through an assign shorthand as an independent entity.
- Result: Won
26/08/2024 10:13
NHAT TRIEU COMPANY LIMITED Won the bidding for the Repairing infrastructure of 02 BTS stations in Dak Lak province in 2024 package, which was invited for bidding by the TRUNG TÂM MẠNG LƯỚI MOBIFONE MIỀN TRUNG - CHI NHÁNH TỔNG CÔNG TY VIỄN THÔNG MOBIFONE through an assign shorthand as an independent entity.
- Result: Won
08/08/2024 17:04
NHAT TRIEU COMPANY LIMITED lost the bidding for the 05-DTRR-VNPT-GLI-XL-2024: New construction of BTS station infrastructure in 2024 in Gia Lai province package, which was invited for bidding by the VIỄN THÔNG GIA LAI TẬP ĐOÀN BƯU CHÍNH VIỄN THÔNG VIỆT NAM through an Open bidding as sub-joint of CÔNG TY TNHH NHẤT TRIỀU. Six other contractors also participated.
- Result: Lost
12/07/2024 10:54
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder NHAT TRIEU COMPANY LIMITED participated in 146 package, of which 90 package was won, failed 52 packages, 3 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NHAT TRIEU COMPANY LIMITED is related to 28 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NHAT TRIEU COMPANY LIMITED competed with 96 contractors in 81 package, won 25 package, lost 51 package, 4 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor NHAT TRIEU COMPANY LIMITED once entered into a partnership with 10 contractors in 15 package, won bid 11 package, lost 3 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor NHAT TRIEU COMPANY LIMITED participated in bidding in 13 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,681 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code