Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
8:21 AM 10/15/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
1:48 PM 10/17/2022 |
Active |
At the request of QTHT |
|
12:05 AM 06/04/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
1:47 PM 06/04/2024 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors TOYOTA GIAI PHONG COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 113 bidding packages, of which 95 were won, 16 were lost, 0 are pending results, and 2 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 70.2% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.08% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (39), Ninh Bình (19), Thái Nguyên (4), Đà Nẵng (3), Lâm Đồng (2), Lạng Sơn (2), Lào Cai (2), Lai Châu (2), Hải Phòng (1), Quảng Trị (1), Sơn La (1), Đồng Tháp (1), Quảng Ninh (1), Điện Biên (1), Hưng Yên (1), Thanh Hoá (1), Nghệ An (1), Phú Thọ (1), Cà Mau (1), Vĩnh Long (1), An Giang (1), Cần Thơ (1), TP.Hồ Chí Minh (1), Undefined (26)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (39), Nam Định (15), Bắc Kạn (4), Hà Nam (4), Lâm Đồng (2), Quảng Nam (2), Lạng Sơn (2), Yên Bái (2), Lai Châu (2), Hải Phòng (1), Quảng Bình (1), Sơn La (1), Đồng Tháp (1), Đà Nẵng (1), Quảng Ninh (1), Điện Biên (1), Hưng Yên (1), Thanh Hoá (1), Nghệ An (1), Hòa Bình (1), Cà Mau (1), Bến Tre (1), An Giang (1), Cần Thơ (1), Bình Dương (1), Undefined (26)
- Has relationships with 96 Bid Solicitors
- Has competed against 22 contractors in 29 bidding packages, won 14 packages, lost 15 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 11 contractors in 8 bidding packages, won 7 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 1 bidding packages with 1 roles.
- Year started in TOP 500: 2010 (VNR500)
- Industry: Manufacturing and Trading of Cars, Motorcycles, and Vehicle Accessories
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 1.1% |
| Lower by 10% to 20% | 4 | 4.2% |
| Lower by 5% to 10% | 1 | 1.1% |
| Lower by 1% to 5% | 19 | 20% |
| Lower by 0% to 1% | 19 | 20% |
| 0% | 50 | 52.6% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 1 | 1.1% |
| Unknown | 0 | 0% |
| Total | 95 | 100% |
TOYOTA GIAI PHONG COMPANY LIMITED Won the bidding for the Repair and replacement of car parts package, which was invited for bidding by the Cục An ninh nội địa through an assign shorthand as an independent entity.
- Result: Won
29/12/2025 08:59
TOYOTA GIAI PHONG COMPANY LIMITED Won the bidding for the Car repair BKS: 12A-002.66 of Department PC08 package, which was invited for bidding by the Công an tỉnh Lạng Sơn through an assign shorthand as an independent entity.
- Result: Won
02/12/2025 16:04
TOYOTA GIAI PHONG COMPANY LIMITED Won the bidding for the Shopping for production and business in 2025 package, which was invited for bidding by the HANOI POWER CORPORATION through an Open bidding as master consortium of Liên danh TOYOTA GIẢI PHÓNG - HẢI DƯƠNG FORD. Two other contractors also participated.
- Result: Won
17/07/2025 16:05
TOYOTA GIAI PHONG COMPANY LIMITED join for the Shopping for production and business in 2025 package, which was invited for bidding by the HANOI POWER CORPORATION through an Open bidding as master consortium of CÔNG TY TNHH TOYOTA GIẢI PHÓNG. Two other contractors also participated.
- Result: Tender opening completed
30/06/2025 11:12
TOYOTA GIAI PHONG COMPANY LIMITED Won the bidding for the Shopping for a 7-seater car package, which was invited for bidding by the Chi nhánh Ngân hàng Phát triển Khu vực Bình Dương - Bình Phước through an assign shorthand as an independent entity.
- Result: Won
26/06/2025 08:14
TOYOTA GIAI PHONG COMPANY LIMITED Won the bidding for the Equipped with cars
7 seats package, which was invited for bidding by the CHI NHÁNH NGÂN HÀNG PHÁT TRIỂN KHU VỰC CẦN THƠ through an assign shorthand as an independent entity.
- Result: Won
18/06/2025 15:21
TOYOTA GIAI PHONG COMPANY LIMITED Won the bidding for the Shopping for cars for Agribank Ha Nam Branch II package, which was invited for bidding by the NGÂN HÀNG NÔNG NGHIỆP VÀ PHÁT TRIỂN NÔNG THÔN VIỆT NAM - CHI NHÁNH HÀ NAM II through an assign shorthand as an independent entity.
- Result: Won
11/06/2025 07:43
TOYOTA GIAI PHONG COMPANY LIMITED Won the bidding for the Shopping for 7 -seat Toyota Fortuner Legene 4x4CE package, which was invited for bidding by the Chi nhánh Ngân hàng Phát triển Lâm Đồng through an assign shorthand as an independent entity.
- Result: Won
05/06/2025 09:12
TOYOTA GIAI PHONG COMPANY LIMITED Won the bidding for the Shopping for a 7-seater car package, which was invited for bidding by the Chi nhánh Ngân Hàng Phát Triển Khu vực Đồng Tháp - An Giang through an assign shorthand as an independent entity.
- Result: Won
04/06/2025 10:50
TOYOTA GIAI PHONG COMPANY LIMITED Won the bidding for the Car shopping package, which was invited for bidding by the Chi nhánh Ngân hàng Phát triển Khu vực Sông Tiền through an assign shorthand as an independent entity.
- Result: Won
03/06/2025 10:23
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder TOYOTA GIAI PHONG COMPANY LIMITED participated in 113 package, of which 95 package was won, failed 16 packages, 0 packages with no results, 2 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TOYOTA GIAI PHONG COMPANY LIMITED is related to 96 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TOYOTA GIAI PHONG COMPANY LIMITED competed with 22 contractors in 29 package, won 14 package, lost 15 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor TOYOTA GIAI PHONG COMPANY LIMITED once entered into a partnership with 11 contractors in 8 package, won bid 7 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor TOYOTA GIAI PHONG COMPANY LIMITED participated in bidding in 23 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TOYOTA GIAI PHONG COMPANY LIMITED participated in bidding in 25 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor