Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
8:30 AM 10/15/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
11:00 AM 10/31/2022 |
Active |
At the request of QTHT |
|
12:00 AM 02/18/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
2:33 PM 02/20/2023 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC are as follows:
You need to Login or Sign up to view all informations.
- Participated in 144 bidding packages, of which 72 were won, 64 were lost, 5 are pending results, and 3 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 44.5% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 91.76% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Trị (120), Đà Nẵng (3), Quảng Ngãi (1), Hà Nội (1), Undefined (19)
- Provinces before the merger where the contractor has participated in bidding : Quảng Bình (102), Quảng Trị (7), Quảng Nam (2), Quảng Ngãi (1), Đà Nẵng (1), Hà Nội (1), Undefined (30)
- Has relationships with 35 Bid Solicitors
- Has competed against 151 contractors in 115 bidding packages, won 40 packages, lost 58 packages, 14 are pending results, and 3 were canceled.
- Has collaborated with 13 contractors in 15 bidding packages, won 6 packages, lost 6 packages, 2 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 5 | 6.9% |
| Lower by 10% to 20% | 17 | 23.6% |
| Lower by 5% to 10% | 13 | 18.1% |
| Lower by 1% to 5% | 17 | 23.6% |
| Lower by 0% to 1% | 15 | 20.8% |
| 0% | 2 | 2.8% |
| Higher by 0% to 1% | 1 | 1.4% |
| Higher by 1% to 5% | 1 | 1.4% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 1 | 1.4% |
| Unknown | 0 | 0% |
| Total | 72 | 100% |
CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC lost the bidding for the Package 01/XL: Construction and installation project to improve regional electricity supply reliability Gio Linh - Vinh Linh electricity management team in 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
10/01/2026 11:12
CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC lost the bidding for the Package 01/XL: Construction and installation project to improve regional electricity supply reliability Minh Hoa - Tuyen Hoa electricity management team in 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
10/01/2026 09:00
CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC lost the bidding for the 01/XL: Construction and installation project to improve regional electricity supply reliability Bo Trach - Dong Hoi - Quang Ninh - Le Thuy electricity management team in 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
06/01/2026 16:31
CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC lost the bidding for the Package 01/XL: Construction and installation project Completing and preventing overload of the THA power grid in the area of Thanh Co - Hai Lang Management Team in 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
06/01/2026 10:20
CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC Won the bidding for the Package 01/XL: Construction and installation project Completing and preventing overload of THA power grid in the central area of Dong Hoi Power Management Team in 2026 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC QUẢNG TRỊ through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
05/01/2026 15:49
CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC lost the bidding for the Package 01/XL: Construction and installation project Completing and preventing overload of THA power grid in the central area Bo Trach Power Management Team in 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
05/01/2026 15:40
CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC lost the bidding for the Package 01/XL: Construction and installation project Completing and preventing overload of THA power grid in the Northwest region Bo Trach power management team in 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
05/01/2026 08:50
CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC Won the bidding for the Package 01/XL: Construction and installation project Completing and preventing overload of THA power grid in the North and West areas Quang Trach electricity management team in 2026 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC QUẢNG TRỊ through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Won
05/01/2026 08:26
CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC Won the bidding for the Package 01/XL: Construction and installation project Completing the regional THA power grid Minh Hoa Electricity Management Team in 2026 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC QUẢNG TRỊ through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
02/01/2026 16:07
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC participated in 144 package, of which 72 package was won, failed 64 packages, 5 packages with no results, 3 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC is related to 35 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC competed with 151 contractors in 115 package, won 40 package, lost 58 package, 14 bidding package has no results, 3 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC once entered into a partnership with 13 contractors in 15 package, won bid 6 package, lost 6 package, 2 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC participated in bidding in 4 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH XÂY DỰNG CÔNG NGHIỆP CIC participated in bidding in 6 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor