Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:05 AM 08/21/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
5:45 PM 08/25/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors NGOC PHAP CONSTRUCTION COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 88 bidding packages, of which 75 were won, 13 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 25.59% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.78% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đồng Nai (46), Tây Ninh (1), TP.Hồ Chí Minh (1), Undefined (40)
- Provinces before the merger where the contractor has participated in bidding : Đồng Nai (44), Long An (1), Undefined (43)
- Has relationships with 38 Bid Solicitors
- Has competed against 67 contractors in 31 bidding packages, won 17 packages, lost 12 packages, 2 are pending results, and 0 were canceled.
- Has collaborated with 13 contractors in 17 bidding packages, won 15 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: Công ty TNHH Xây dựng Ngọc Pháp
- Construction capacity certificate code: 00006449
- Issuing Authority: Sở Kế hoạch và Đầu tư Đồng Nai
- Field:
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Công nghiệp
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: Giao thông Đường bộ
⚬ Thi công xây dựng công trình: Giao thông Cầu
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật Cấp - thoát nước; Hệ thống chiếu sáng
⚬ Thi công xây dựng công trình: Nông nghiệp và Phát triển nông thôn Thủy lợi
⚬ Khảo sát xây dựng: Địa hình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Phục vụ NN&PTNT
⚬ Giám sát công tác xây dựng công trình: Phục vụ NN&PTNT
⚬ Giám sát lắp đặt thiết bị công trình: Tư vấn giám sát lắp đặt thiết bị vào công trình
⚬ Quản lý dự án đầu tư xây dựng: Phục vụ NN&PTNT
⚬ Thi công xây dựng công trình: Công nghiệp (Nhà Công nghiệp; Đường dây &TBA)
⚬ Thi công xây dựng công trình: Phục vụ NN&PTNT
⚬ Thi công lắp đặt thiết bị vào công trình: Thi công lắp đặt thiết bị vào công trình
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 1.3% |
| Lower by 10% to 20% | 3 | 4% |
| Lower by 5% to 10% | 2 | 2.7% |
| Lower by 1% to 5% | 24 | 32% |
| Lower by 0% to 1% | 39 | 52% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 2 | 2.7% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 4 | 5.3% |
| Unknown | 0 | 0% |
| Total | 75 | 100% |
NGOC PHAP CONSTRUCTION COMPANY LIMITED Won the bidding for the Package No. 01 (Construction and installation): Construction of works package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN KHU VỰC 03 through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
24/12/2025 15:35
NGOC PHAP CONSTRUCTION COMPANY LIMITED join for the Package No. 01 (Construction and installation): Construction of works package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
11/12/2025 10:04
NGOC PHAP CONSTRUCTION COMPANY LIMITED lost the bidding for the Package No. 08 (construction): Content of construction costs (excluding items: fire protection system, wastewater treatment system and industrial works) package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
08/12/2025 16:41
NGOC PHAP CONSTRUCTION COMPANY LIMITED join for the Package No. 08 (construction): Content of construction costs (excluding items: fire protection system, wastewater treatment system and industrial works) package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
01/12/2025 08:28
NGOC PHAP CONSTRUCTION COMPANY LIMITED lost the bidding for the Construction and installation of construction equipment package, which was invited for bidding by the University of Social Sciences and Humanities HCM City through an Open bidding as master consortium of CÔNG TY TNHH XÂY DỰNG NGỌC PHÁP. Three other contractors also participated.
- Result: Lost
21/08/2025 09:41
NGOC PHAP CONSTRUCTION COMPANY LIMITED join for the Construction and installation of construction equipment package, which was invited for bidding by the University of Social Sciences and Humanities HCM City through an Open bidding as master consortium of CÔNG TY TNHH XÂY DỰNG NGỌC PHÁP. Three other contractors also participated.
- Result: Tender opening completed
06/08/2025 14:08
NGOC PHAP CONSTRUCTION COMPANY LIMITED Won the bidding for the Package 08 (construction and supply of goods): Construction, supply and installation of Bui Thi Xuan Street, Long Thanh District package, which was invited for bidding by the HUNG THINH CONSTRUCTION MANAGEMENT COMPANY LIMITED through an Open bidding as master consortium of Liên danh đường Bùi Thị Xuân. Five other contractors also participated.
- Result: Won
18/07/2025 16:37
NGOC PHAP CONSTRUCTION COMPANY LIMITED join for the Package 08 (construction and supply of goods): Construction, supply and installation of Bui Thi Xuan Street, Long Thanh District package, which was invited for bidding by the HUNG THINH CONSTRUCTION MANAGEMENT COMPANY LIMITED through an Open bidding as master consortium of CÔNG TY TNHH XÂY DỰNG NGỌC PHÁP. Five other contractors also participated.
- Result: Tender opening completed
26/06/2025 19:30
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder NGOC PHAP CONSTRUCTION COMPANY LIMITED participated in 88 package, of which 75 package was won, failed 13 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NGOC PHAP CONSTRUCTION COMPANY LIMITED is related to 38 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NGOC PHAP CONSTRUCTION COMPANY LIMITED competed with 67 contractors in 31 package, won 17 package, lost 12 package, 2 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor NGOC PHAP CONSTRUCTION COMPANY LIMITED once entered into a partnership with 13 contractors in 17 package, won bid 15 package, lost 2 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor NGOC PHAP CONSTRUCTION COMPANY LIMITED participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NGOC PHAP CONSTRUCTION COMPANY LIMITED participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor