Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors CONSTRUCT DIVIDEND COMPANY 16 are as follows:
You need to Login or Sign up to view all informations.
- Participated in 18 bidding packages, of which 18 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 82.25% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.32% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Nghệ An (7), Hà Tĩnh (2), Tây Ninh (1), Đồng Tháp (1), Undefined (7)
- Provinces before the merger where the contractor has participated in bidding : Nghệ An (7), Hà Tĩnh (2), Long An (1), Đồng Tháp (1), Undefined (7)
- Has relationships with 16 Bid Solicitors
- Has competed against 8 contractors in 4 bidding packages, won 4 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 17 contractors in 7 bidding packages, won 7 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Published contractor selection plan of 1 project with a total of 2 of bidding packages.
- Invitation to bid 0 package (with 0 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 0 packages announced, canceled bids 0 packages (among the packages above).
- There are 0 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors CONSTRUCT DIVIDEND COMPANY 16 are as follows:
- As the investor of 0 investment and development projects.
- As the investor of 1 Contractor Selection Plan, including 1 self-published Contractor Selection Plan, 0 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 0 bidding package in which the package is self-inviting 0, with 0 the package is owned by the unit. other bidding.
- Building organization name: Công ty Cổ phần Xây dựng 16
- Construction capacity certificate code: 00015040
- Issuing Authority: Sở Kế hoạch và Đầu tư Nghệ An
- Field:
⚬ Thi công xây dựng công trình: Đường bộ; Cấp, thoát nước
⚬ Thi công xây dựng công trình: Dân dụng; Cầu; Thủy lợi; Đường dây và trạm biến áp
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | 0% |
| Lower by 10% to 20% | 2 | 11.1% |
| Lower by 5% to 10% | 0 | 0% |
| Lower by 1% to 5% | 3 | 16.7% |
| Lower by 0% to 1% | 13 | 72.2% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 18 | 100% |
CONSTRUCT DIVIDEND COMPANY 16 Won the bidding for the Package No. 05: Construction and traffic safety assurance of the project: 18m planned road from Nguyen Thai Hoc street connecting Hoang Nghia Luong street package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng thành phố Vinh through an Open bidding as an independent entity.
- Result: Won
20/08/2024 08:29
CONSTRUCT DIVIDEND COMPANY 16 join for the Package No. 05: Construction and traffic safety assurance of the project: 18m planned road from Nguyen Thai Hoc street connecting Hoang Nghia Luong street package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng thành phố Vinh through an Open bidding as an independent entity.
- Result: Tender opening completed
22/07/2024 09:38
CONSTRUCT DIVIDEND COMPANY 16 Won the bidding for the Package 03: Construction cost package, which was invited for bidding by the CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG SỐ 9-NA through an Open bidding as an independent entity.
- Result: Won
01/04/2024 15:52
CONSTRUCT DIVIDEND COMPANY 16 join for the Package 03: Construction cost package, which was invited for bidding by the CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG SỐ 9-NA through an Open bidding as an independent entity.
- Result: Tender opening completed
25/03/2024 08:01
CONSTRUCT DIVIDEND COMPANY 16 Won the bidding for the Package No. 01.XL for construction of the main road connecting the merged communes of Kim Hoa commune, Huong Son district package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng huyện Hương Sơn through an Open bidding as sub-joint of CÔNG TY TNHH HOÀI NHẬT. Four other contractors also participated.
- Result: Won
31/07/2023 15:50
CONSTRUCT DIVIDEND COMPANY 16 join for the Package No. 01.XL for construction of the main road connecting the merged communes of Kim Hoa commune, Huong Son district package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng huyện Hương Sơn through an Open bidding as sub-joint of CÔNG TY CP XÂY DỰNG 16. Four other contractors also participated.
- Result: Tender opening completed
08/06/2023 09:00
CONSTRUCT DIVIDEND COMPANY 16 Won the bidding for the Package 01: The entire construction and installation and traffic safety assurance works: Upgrading and expanding the Trang - Minh road connecting National Highway 15A from Qua Son Temple to National Highway 7A at the location of Duc Hoang Temple, Do Luong district. package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Đô Lương through an Open bidding as master consortium of Liên danh Công ty CP xây dựng 16 - Công ty CP tổng công ty xây dựng Nghệ An - Công ty TNHH Xây dựng Việt Hà - Công ty CP xây lắp Tân Thắng – Công ty CP tư vấn thiết kế và xây dựng Anh Đức.
Tên viết tắt là : Liên danh Xây dựng 16 - Xây dựng Nghệ An – Việt Hà – Tân Thắng – Anh Đức.. Four other contractors also participated.
- Result: Won
20/03/2023 17:00
CONSTRUCT DIVIDEND COMPANY 16 Won the bidding for the Package No. 01.XL: Construction of the section Km6+142.55 - Km14+961.24 of the inter-commune road project An Hoa Thinh - Son Tien, Huong Son district package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng huyện Hương Sơn through an Open bidding as sub-joint of CÔNG TY TNHH THƯƠNG MẠI XÂY DỰNG VẬN TẢI TÙNG LÂM. Three other contractors also participated.
- Result: Won
28/12/2022 16:57
CONSTRUCT DIVIDEND COMPANY 16 join for the Package 01: The entire construction and installation and traffic safety assurance works: Upgrading and expanding the Trang - Minh road connecting National Highway 15A from Qua Son Temple to National Highway 7A at the location of Duc Hoang Temple, Do Luong district. package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Đô Lương through an Open bidding as master consortium of CÔNG TY CP XÂY DỰNG 16. Four other contractors also participated.
- Result: Tender opening completed
16/12/2022 08:07
CONSTRUCT DIVIDEND COMPANY 16 join for the Package No. 01.XL: Construction of the section Km6+142.55 - Km14+961.24 of the inter-commune road project An Hoa Thinh - Son Tien, Huong Son district package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng huyện Hương Sơn through an Open bidding as sub-joint of CÔNG TY CP XÂY DỰNG 16. Three other contractors also participated.
- Result: Tender opening completed
05/12/2022 14:31
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CONSTRUCT DIVIDEND COMPANY 16 participated in 18 package, of which 18 package was won, failed 0 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CONSTRUCT DIVIDEND COMPANY 16 is related to 16 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CONSTRUCT DIVIDEND COMPANY 16 competed with 8 contractors in 4 package, won 4 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CONSTRUCT DIVIDEND COMPANY 16 once entered into a partnership with 17 contractors in 7 package, won bid 7 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CONSTRUCT DIVIDEND COMPANY 16 participated in bidding in 4 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CONSTRUCT DIVIDEND COMPANY 16 participated in bidding in 4 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor