Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:00 AM 03/14/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:06 AM 03/14/2023 |
Active |
At the request of QTHT |
|
11:33 PM 11/28/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
8:28 AM 11/29/2023 |
Active |
At the request of QTHT |
|
11:31 PM 12/15/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:40 AM 12/16/2023 |
Active |
At the request of QTHT |
|
11:31 PM 01/23/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:28 AM 01/24/2024 |
Active |
At the request of QTHT |
|
12:05 AM 04/16/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:33 AM 04/16/2024 |
Active |
At the request of QTHT |
|
12:16 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
2:16 PM 07/01/2024 |
Active |
At the request of QTHT |
|
12:05 AM 07/14/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
2:12 PM 07/14/2024 |
Active |
At the request of QTHT |
|
12:05 AM 07/30/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
10:04 AM 07/30/2024 |
Active |
At the request of QTHT |
|
12:06 AM 08/15/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:18 AM 08/15/2024 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 are as follows:
You need to Login or Sign up to view all informations.
- Participated in 735 bidding packages, of which 248 were won, 443 were lost, 26 are pending results, and 18 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 14.27% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 69.41% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đồng Nai (137), Đà Nẵng (84), Lâm Đồng (68), Gia Lai (43), Hà Nội (39), Quảng Ngãi (35), Quảng Trị (30), TP.Hồ Chí Minh (29), Đắk Lắk (29), Nghệ An (28), Khánh Hòa (24), Quảng Ninh (20), Thanh Hoá (17), Phú Thọ (17), Đồng Tháp (16), Tây Ninh (10), Hà Tĩnh (10), Hưng Yên (9), An Giang (8), Huế (7), Vĩnh Long (7), Ninh Bình (6), Cà Mau (6), Hải Phòng (6), Bắc Ninh (5), Lào Cai (5), Tuyên Quang (5), Sơn La (4), Cao Bằng (2), Lai Châu (2), Thái Nguyên (2), Cần Thơ (1), Undefined (24)
- Provinces before the merger where the contractor has participated in bidding : Đồng Nai (124), Quảng Nam (53), Hà Nội (39), Gia Lai (38), Lâm Đồng (36), Nghệ An (28), Đắk Nông (26), Đà Nẵng (26), Quảng Trị (23), Quảng Ninh (20), Khánh Hòa (20), Đắk Lắk (19), Quảng Ngãi (18), Thanh Hoá (17), Kon Tum (17), Tiền Giang (15), TP.Hồ Chí Minh (13), Phú Yên (10), Bình Dương (10), Hà Tĩnh (10), Huế (7), Long An (7), Vĩnh Phúc (7), Quảng Bình (7), Bình Định (6), Kiên Giang (6), Hưng Yên (5), Trà Vinh (5), Bình Thuận (5), Nam Định (5), Bà Rịa - Vũng Tàu (4), Bắc Giang (4), Thái Bình (4), Cà Mau (4), Sơn La (4), Lào Cai (4), Ninh Thuận (4), Bình Phước (4), Hải Phòng (4), Hà Giang (3), An Giang (2), Tây Ninh (2), Bạc Liêu (2), Cao Bằng (2), Bến Tre (2), Lai Châu (2), Phú Thọ (2), Hải Dương (2), Bắc Ninh (1), Yên Bái (1), Đồng Tháp (1), Tuyên Quang (1), Hậu Giang (1), Hòa Bình (1), Thái Nguyên (1), Ninh Bình (1), Undefined (60)
- Has relationships with 327 Bid Solicitors
- Has competed against 453 contractors in 691 bidding packages, won 204 packages, lost 438 packages, 36 are pending results, and 13 were canceled.
- Has collaborated with 11 contractors in 13 bidding packages, won 4 packages, lost 9 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 142 bidding packages with 12 roles.
- Building organization name: CÔNG TY TNHH TƯ VẤN XÂY VÀ XÂY DỰNG 23
- Construction capacity certificate code: 00002362
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Đà Nẵng
- Field:
⚬ Khảo sát xây dựng: Địa hình, địa chất công trình
- Lab name: Geotechnical and construction materials testing center
- Laboratory code: LAS-XD 641
- Certifications:
⚬ Certificate 397/GCN-BXD.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 207 | 83.5% |
| Lower by 10% to 20% | 13 | 5.2% |
| Lower by 5% to 10% | 9 | 3.6% |
| Lower by 1% to 5% | 14 | 5.6% |
| Lower by 0% to 1% | 1 | 0.4% |
| 0% | 4 | 1.6% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 248 | 100% |
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 join for the TV03-25 BT-D (1, 2, 3, 4, 5, 6, 7), LK-D (2, 3, 4, 5, 6, 7, 8) Geological survey package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
14/01/2026 09:19
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 Won the bidding for the Package 01: Topographic survey consulting package, which was invited for bidding by the Ban Quản lý các Khu công nghiệp, Khu kinh tế tỉnh Đồng Nai through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Won
13/01/2026 11:11
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 Won the bidding for the Bidding package No. 01: Topographic survey consulting package, which was invited for bidding by the Ban Quản lý các Khu công nghiệp, Khu kinh tế tỉnh Đồng Nai through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Won
13/01/2026 11:10
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 Won the bidding for the TVTK20.25: Consulting on surveys and preparing technical and economic reports package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC PHÚ THỌ - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC through an assign shorthand as an independent entity.
- Result: Won
12/01/2026 14:40
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 lost the bidding for the Package 01: Topographic survey consulting package, which was invited for bidding by the through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
12/01/2026 10:25
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 lost the bidding for the Package 01: Topographic survey consulting package, which was invited for bidding by the through an Open bidding as an independent entity. Five other contractors also participated.
- Result: Lost
12/01/2026 10:23
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 Won the bidding for the Package TK.2026.14: Consulting on surveying, preparing technical feasibility report for the project: New construction of 22kV line to enhance grid connection of line 475 Tam Lap Phu Giao 110kV station to Tan Hiep 110kV station package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - CÔNG TY ĐIỆN LỰC BẾN CÁT through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
06/01/2026 18:54
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 join for the Topographic survey at 1/2000 scale of Le Thanh Border Gate Urban Area (Division 1), Le Thanh International Border Gate Economic Zone, Gia Lai Province package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
06/01/2026 09:15
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 lost the bidding for the Bidding package TVSC04/2026: Construction survey consulting and preparation of construction plans for projects package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
05/01/2026 10:03
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 join for the Package 01: Topographic survey consulting package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
05/01/2026 09:08
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 participated in 735 package, of which 248 package was won, failed 443 packages, 26 packages with no results, 18 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 is related to 327 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 competed with 453 contractors in 691 package, won 204 package, lost 438 package, 36 bidding package has no results, 13 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 once entered into a partnership with 11 contractors in 13 package, won bid 4 package, lost 9 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 participated in bidding in 32 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 23 participated in bidding in 56 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor