Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 80 bidding packages, of which 66 were won, 12 were lost, 2 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 9.12% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.71% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (61), Quảng Trị (2), Quảng Ngãi (1), Huế (1), Đắk Lắk (1), Undefined (14)
- Provinces before the merger where the contractor has participated in bidding : Đà Nẵng (38), Quảng Nam (12), Quảng Trị (2), Quảng Ngãi (1), Huế (1), Phú Yên (1), Undefined (25)
- Has relationships with 30 Bid Solicitors
- Has competed against 28 contractors in 17 bidding packages, won 4 packages, lost 12 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 7 contractors in 10 bidding packages, won 6 packages, lost 3 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 40 bidding packages with 18 roles.
- Building organization name: Công ty cổ phần tư vấn và xây dựng Đà Rồng
- Construction capacity certificate code: 00001467
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Đà Nẵng
- Field:
⚬ Khảo sát xây dựng: Địa chất
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật Cấp nước
⚬ Tư vấn giám sát công tác xây dựng công trình: Giao thông Đường bộ
⚬ Tư vấn giám sát công tác xây dựng công trình: Hạ tầng kỹ thuật Cấp nước
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông Đường bộ
⚬ Khảo sát xây dựng: Địa hình
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 4 | 6.1% |
| Lower by 10% to 20% | 5 | 7.6% |
| Lower by 5% to 10% | 21 | 31.8% |
| Lower by 1% to 5% | 16 | 24.2% |
| Lower by 0% to 1% | 2 | 3% |
| 0% | 17 | 25.8% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 1 | 1.5% |
| Unknown | 0 | 0% |
| Total | 66 | 100% |
DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Consulting on task setting and detailed planning TL 1/500 package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình giao thông và nông nghiệp Đà Nẵng through an assign shorthand as an independent entity.
- Result: Won
06/01/2026 10:30
DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Verification of BVTC design records - estimates package, which was invited for bidding by the Ban Quản lý các dự án đầu tư cơ sở hạ tầng ưu tiên thành phố Đà Nẵng through an assign shorthand as master consortium of Liên danh Công ty Cổ phần Tư vấn và Xây dựng Đà Rồng và Công ty Cổ Phần Tư vấn, Đầu tư và Xây dựng Việt Vương.
- Result: Won
30/12/2025 15:59
DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY join for the Survey, prepare design documents for financial protection - estimates, construction information models package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG ĐÀ RỒNG.
25/12/2025 08:51
DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Consulting for planning project package, which was invited for bidding by the UBND PHƯỜNG AN KHÊ through an assign bid as an independent entity.
- Result: Won
23/12/2025 16:10
DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Tu still sets the survey tasks, design tasks and cost estimates for the design of BVTC design - estimates package, which was invited for bidding by the Da nang priority infrastructure investment projects management unit through an assign shorthand as an independent entity.
- Result: Won
16/12/2025 14:55
DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the 01 -CPH TVLNV: Consulting survey tasks, design tasks, task model tasks (BIM) and estimates for designing BVTC design dossiers - estimates package, which was invited for bidding by the Ban Quản lý các dự án đầu tư cơ sở hạ tầng ưu tiên thành phố Đà Nẵng through an assign shorthand as an independent entity.
- Result: Won
08/12/2025 08:43
DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Establish tasks and estimates for component projects: Compensation, support, resettlement, site clearance connecting the expanded Tho Quang residential area to the residential area along the Tho Quang - East Sea sewer line (combined with the main sewer line to handle flooding for the area) package, which was invited for bidding by the Trung tâm Phát triển quỹ đất thành phố Đà Nẵng through an assign shorthand as an independent entity.
- Result: Won
04/12/2025 10:56
DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Verify estimates and tasks package, which was invited for bidding by the UBND PHƯỜNG AN KHÊ through an assign shorthand as an independent entity.
- Result: Won
21/11/2025 14:52
DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Consulting, surveying, making economic - technical reports on construction investment package, which was invited for bidding by the Danang Contruction Department through an assign shorthand as an independent entity.
- Result: Won
14/11/2025 09:39
DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Consulting survey tasks, design tasks, BIM tasks to prepare a feasibility study report package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình giao thông và nông nghiệp Đà Nẵng through an assign shorthand as an independent entity.
- Result: Won
13/10/2025 14:02
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY participated in 80 package, of which 66 package was won, failed 12 packages, 2 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY is related to 30 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY competed with 28 contractors in 17 package, won 4 package, lost 12 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY once entered into a partnership with 7 contractors in 10 package, won bid 6 package, lost 3 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 5 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DA RONG CONSULTANTS & CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 6 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor