Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 56 bidding packages, of which 36 were won, 17 were lost, 2 are pending results, and 1 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 94.33% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.22% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (38), Bắc Ninh (2), Hà Tĩnh (1), Lào Cai (1), Nam Định (1), Hà Nam (1), Sơn La (1), Lai Châu (1), Thái Bình (1), Thái Nguyên (1), Undefined (14)
- Has relationships with 6 Bid Solicitors
- Has competed against 7 contractors in 39 bidding packages, won 20 packages, lost 17 packages, 1 are pending results, and 1 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 5 | 13.9% |
Lower by 1% to 5% | 24 | 66.7% |
Lower by 0% to 1% | 5 | 13.9% |
0% | 2 | 5.6% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 36 | 100% |
DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE
JOINT STOCK COMPANY join for the Procurement of supplies package, which was invited for bidding by the NORTHERN POWER SERVICE COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an Open bidding as an independent entity.
21/10/2024 09:19
DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE
JOINT STOCK COMPANY Won the bidding for the Package 02: Procurement of materials package, which was invited for bidding by the NORTHERN POWER SERVICE COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an Open bidding as an independent entity.
- Result: Won
30/09/2024 09:52
DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE
JOINT STOCK COMPANY Won the bidding for the Procurement of materials to repair MBA DM1-2024 package, which was invited for bidding by the NORTHERN POWER SERVICE COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an direct shopping as an independent entity.
- Result: Won
12/07/2024 15:38
DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE
JOINT STOCK COMPANY lost the bidding for the Package 11: Procurement of equipment and tools (except for TTLL equipment) package, which was invited for bidding by the laocai province boder guard command through an Open bidding as master consortium of CÔNG TY CỔ PHẦN CHẾ TẠO BIẾN ÁP THIẾT BỊ ĐIỆN ĐÔNG ANH HÀ NỘI. Two other contractors also participated.
- Result: Lost
11/06/2024 08:03
DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE
JOINT STOCK COMPANY Won the bidding for the Procurement of materials for the repair of transformers for the factories of Bac Ninh, Ha Giang, Ha Nam, Lai Chau, Son La, Thai Binh, and Thanh Hoa in 2023 (Q2) package, which was invited for bidding by the NORTHERN POWER SERVICE COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
17/07/2023 08:45
DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE
JOINT STOCK COMPANY Won the bidding for the Procurement of materials for repairing MBA of PCs Tuyen Quang, PC Phu Tho, PC Thai Nguyen, PC Dien Bien, PC Thai Binh package, which was invited for bidding by the NORTHERN POWER SERVICE COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an direct shopping as an independent entity.
- Result: Won
17/03/2023 09:08
DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE
JOINT STOCK COMPANY Won the bidding for the Procurement of materials for MBA repair work of Nghe An PCs, Ha Nam PCs, Ha Tinh PCs package, which was invited for bidding by the NORTHERN POWER SERVICE COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an direct shopping as an independent entity.
- Result: Won
12/01/2023 08:19
DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE
JOINT STOCK COMPANY Won the bidding for the Procurement of materials for MBA repair Phase 3 - Quarter 3, 2022 package, which was invited for bidding by the Công ty dịch vụ Điện lực miền Bắc through an Đấu thầu rộng rãi trong nước as an independent entity. One other contractors also participated.
- Result: Won
26/10/2022 14:41
DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE
JOINT STOCK COMPANY join for the Procurement of materials for MBA repair Phase 2 - Quarter 3, 2022 package, which was invited for bidding by the Công ty dịch vụ Điện lực miền Bắc through an Đấu thầu rộng rãi trong nước as an independent entity. One other contractors also participated.
30/08/2022 16:03
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE JOINT STOCK COMPANY participated in 56 package, of which 36 package was won, failed 17 packages, 2 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE JOINT STOCK COMPANY is related to 6 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE JOINT STOCK COMPANY competed with 7 contractors in 39 package, won 20 package, lost 17 package, 1 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DONG ANH ELECTRICAL EQUIPMENT TRANSFORMER MANUFACTURE JOINT STOCK COMPANY participated in bidding in 10 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,681 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code