Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 23 bidding packages, of which 13 were won, 4 were lost, 6 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 92.42% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.98% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Quảng Ninh (10), Hải Phòng (9), Hải Dương (1), Undefined (3)
- Has relationships with 12 Bid Solicitors
- Has competed against 14 contractors in 8 bidding packages, won 4 packages, lost 3 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 3 contractors in 3 bidding packages, won 3 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ TƯ VẤN THIẾT KẾ ĐÔNG BẮC
- Construction capacity certificate code: 00047255
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hải Phòng
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình: dân dụng; công nghiệp; hạ tầng kỹ thuật (trừ công trình xử lý chất thải rắn).
⚬ Thi công xây dựng công trình: Thi công xây dựng công trình: dân dụng; công nghiệp; đường bộ; cầu; hạ tầng kỹ thuật (trừ công trình xử lý chất thải rắn).
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 0 | 0% |
Lower by 1% to 5% | 1 | 7.7% |
Lower by 0% to 1% | 11 | 84.6% |
0% | 0 | 0% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 1 | 7.7% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 13 | 100% |
DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY join for the Package XL-01 package, which was invited for bidding by the Sư đoàn 395, Quân khu 3 through an Competitive Offer as an independent entity.
10/10/2024 15:37
DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package XL-01: Construction work package, which was invited for bidding by the Sư đoàn 395, Quân khu 3 through an Open bidding as an independent entity.
- Result: Won
13/09/2024 10:36
DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY lost the bidding for the Package No. XL-01: Construction work package, which was invited for bidding by the Trung đoàn 151, Vùng 1 Hải quân through an Restricted Match as an independent entity. Two other contractors also participated.
- Result: Lost
06/09/2024 10:38
DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package XL-01: Construction package, which was invited for bidding by the DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY through an Open bidding as an independent entity.
- Result: Won
21/07/2024 14:59
DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package MS-01 package, which was invited for bidding by the Sư đoàn 395, Quân khu 3 through an assign bid as an independent entity.
- Result: Won
10/07/2024 15:41
DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package XL-01 package, which was invited for bidding by the Sư đoàn 395, Quân khu 3 through an assign bid as an independent entity.
- Result: Won
10/07/2024 14:26
DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY lost the bidding for the Package XL-01: Construction of main works and technical infrastructure package, which was invited for bidding by the Ban quản lý dự án Cải tạo, nâng cấp doanh trại Khu B Đoàn an điều dưỡng 22 Hạ Long/Quân chủng Hải Quân through an Open bidding as master consortium of CÔNG TY CỔ PHẦN XÂY DỰNG VÀ TƯ VẤN THIẾT KẾ ĐÔNG BẮC. Four other contractors also participated.
- Result: Lost
06/06/2024 00:00
DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package No. 24 package, which was invited for bidding by the Ban Quản lý dự án Quân khu 3 through an Open bidding as master consortium of CÔNG TY CỔ PHẦN XÂY DỰNG VÀ TƯ VẤN THIẾT KẾ ĐÔNG BẮC. One other contractors also participated.
- Result: Won
16/05/2024 16:25
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY participated in 23 package, of which 13 package was won, failed 4 packages, 6 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY is related to 12 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY competed with 14 contractors in 8 package, won 4 package, lost 3 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY once entered into a partnership with 3 contractors in 3 package, won bid 3 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor DONG BAC DESIGN CONSULTANCY JOINT STOCK COMPANY participated in bidding in 3 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,681 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code