Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 199 bidding packages, of which 173 were won, 18 were lost, 5 are pending results, and 3 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 65.82% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 89.07% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (67), TP.Hồ Chí Minh (16), Lai Châu (15), Hưng Yên (8), Hà Tĩnh (6), Phú Thọ (6), Ninh Bình (4), Lào Cai (3), Cần Thơ (3), Nghệ An (2), Quảng Trị (2), Quảng Ninh (2), Hải Phòng (2), Sơn La (2), Bắc Ninh (1), Tuyên Quang (1), Huế (1), Đà Nẵng (1), Quảng Ngãi (1), Đắk Lắk (1), Điện Biên (1), (1), Lạng Sơn (1), Undefined (61)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (67), Lai Châu (15), Hà Tĩnh (6), Bà Rịa - Vũng Tàu (6), TP.Hồ Chí Minh (5), Thái Bình (4), Nam Định (3), Lào Cai (3), Hưng Yên (3), Hòa Bình (2), Nghệ An (2), Quảng Ninh (2), Sơn La (2), Vĩnh Phúc (2), Quảng Bình (1), Bắc Ninh (1), Hà Nam (1), Tuyên Quang (1), Hải Phòng (1), Quảng Trị (1), Cần Thơ (1), Huế (1), Đà Nẵng (1), Hải Dương (1), Quảng Ngãi (1), Đắk Lắk (1), Điện Biên (1), Lạng Sơn (1), Undefined (79)
- Has relationships with 94 Bid Solicitors
- Has competed against 128 contractors in 63 bidding packages, won 40 packages, lost 17 packages, 4 are pending results, and 2 were canceled.
- Has collaborated with 32 contractors in 23 bidding packages, won 18 packages, lost 5 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: CÔNG TY CỔ PHẦN NỘI THẤT VÀ DỊCH VỤ PHÒNG THÍ NGHIỆM ĐÔNG DƯƠNG
- Construction capacity certificate code: 00033471
- Issuing Authority: Sở kế hoạch đầu tư Thành phố Hà Nội
- Field:
⚬ Thi công xây dựng công trình: Dân dụng Lắp đặt thiết bị
⚬ Thi công xây dựng công trình: Công nghiệp nhẹ
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 10 | 5.8% |
| Lower by 10% to 20% | 4 | 2.3% |
| Lower by 5% to 10% | 18 | 10.4% |
| Lower by 1% to 5% | 45 | 26% |
| Lower by 0% to 1% | 54 | 31.2% |
| 0% | 39 | 22.5% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 3 | 1.7% |
| Unknown | 0 | 0% |
| Total | 173 | 100% |
DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY lost the bidding for the Medical equipment purchased from the 2025 development fund package, which was invited for bidding by the through an Open bidding as an independent entity. Ten other contractors also participated.
- Result: Lost
09/01/2026 15:36
DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY Won the bidding for the Repairing machinery and equipment in laboratories serving the training of bachelor's degrees in Biotechnology of the Faculty of Biology package, which was invited for bidding by the Trường Đại học Sư phạm Hà Nội 2 through an assign shorthand as an independent entity.
- Result: Won
30/12/2025 13:35
DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY Won the bidding for the Repair, replace spare parts and components, maintain professional chemistry laboratory equipment P4/H08 package, which was invited for bidding by the CỤC CÔNG NGHIỆP AN NINH through an assign shorthand as an independent entity.
- Result: Won
30/12/2025 09:01
DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY Won the bidding for the Supply and install test tables for genetic cells at the National Hospital of Obstetrics and Gynecology package, which was invited for bidding by the National Hospital of Obstetrics and Gynecology (NHOG) through an CGTTRG as an independent entity.
- Result: Won
29/12/2025 16:03
DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY Won the bidding for the GT17- Procurement, supply and installation of laboratory equipment (supplement) package, which was invited for bidding by the Trung tâm Chất lượng, Chế biến và Phát triển thị trường vùng 6 through an assign shorthand as an independent entity.
- Result: Won
16/12/2025 13:34
DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY Won the bidding for the Repair and replace materials for exhaust gas treatment systems package, which was invited for bidding by the VIỆN KIỂM NGHIỆM AN TOÀN VỆ SINH THỰC PHẨM QUỐC GIA through an assign shorthand as an independent entity.
- Result: Won
16/12/2025 08:22
DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY Won the bidding for the Purchase specialized chemical storage cabinets and toxic gas fume hoods package, which was invited for bidding by the Trung tâm Kiểm nghiệm thuốc, mỹ phẩm, thực phẩm tỉnh Sơn La through an assign shorthand as an independent entity.
- Result: Won
10/12/2025 11:21
DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY join for the Medical equipment purchased from the 2025 development fund package, which was invited for bidding by the through an Open bidding as an independent entity. Ten other contractors also participated.
- Result: Tender opening completed
05/12/2025 17:02
DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY Won the bidding for the Purchase medical equipment for Sin Ho Medical Center in 2025 package, which was invited for bidding by the Trung tâm Y tế huyện Sìn Hồ through an assign shorthand as an independent entity.
- Result: Won
28/11/2025 18:06
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY participated in 199 package, of which 173 package was won, failed 18 packages, 5 packages with no results, 3 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY is related to 94 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY competed with 128 contractors in 63 package, won 40 package, lost 17 package, 4 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY once entered into a partnership with 32 contractors in 23 package, won bid 18 package, lost 5 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY participated in bidding in 23 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DONG DUONG LABORATORY SERVICE AND FURNITURE JOINT STOCK COMPANY participated in bidding in 28 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor