Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:05 AM 09/04/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
11:03 AM 09/04/2024 |
Active |
At the request of QTHT |
|
12:05 AM 10/06/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
11:09 AM 10/07/2024 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 512 bidding packages, of which 512 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 53.83% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.79% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hải Phòng (434), Quảng Ninh (4), Nghệ An (4), Cà Mau (1), Undefined (69)
- Provinces before the merger where the contractor has participated in bidding : Hải Phòng (407), Hải Dương (7), Quảng Ninh (4), Nghệ An (4), Cà Mau (1), Undefined (89)
- Has relationships with 220 Bid Solicitors
- Has competed against 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 1020 bidding packages with 38 roles.
- Published contractor selection plan of 44 project with a total of 169 of bidding packages.
- Invitation to bid 85 package (with 88 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 95 packages announced, canceled bids 0 packages (among the packages above).
- There are 18 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY are as follows:
- As the investor of 0 investment and development projects.
- As the investor of 29 Contractor Selection Plan, including 29 self-published Contractor Selection Plan, 0 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 27 bidding package in which the package is self-inviting 27, with 0 the package is owned by the unit. other bidding.
- Building organization name: CÔNG TY TNHH ĐẦU TƯ VÀ TƯ VẤN XÂY DỰNG ĐỨC THÁI
- Construction capacity certificate code: 00032579
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hải Phòng
- Field:
⚬ Lập quy hoạch xây dựng:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế kết cấu công trình dân dụng - công nghiệp (nhẹ)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế cơ - điện công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế cấp - thoát nước công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình đường bộ, đường thủy nội địa, hàng hải, hạ tầng kỹ thuật (trừ công trình xử lý chất thải rắn)
⚬ Quản lý dự án đầu tư xây dựng: Quản lý dự án đầu tư xây dựng công trình: dân dụng; công nghiệp; giao thông; thủy lợi; hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Giám sát thi công xây dựng công trình: dân dụng; công nghiệp (nhẹ); đường bộ; hạ tầng kỹ thuật (trừ công trình xử lý chất thải rắn)
⚬ Thi công xây dựng công trình: Thi công xây dựng công trình: dân dụng; công nghiệp (nhẹ); đường bộ; hạ tầng kỹ thuật (trừ công trình xử lý chất thải rắn)
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 5 | 1% |
| Lower by 10% to 20% | 7 | 1.4% |
| Lower by 5% to 10% | 4 | 0.8% |
| Lower by 1% to 5% | 18 | 3.5% |
| Lower by 0% to 1% | 21 | 4.1% |
| 0% | 445 | 86.9% |
| Higher by 0% to 1% | 7 | 1.4% |
| Higher by 1% to 5% | 3 | 0.6% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 2 | 0.4% |
| Unknown | 0 | 0% |
| Total | 512 | 100% |
DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY Won the bidding for the Package No. 03: Consulting on verifying technical and economic reports package, which was invited for bidding by the Trung tâm đào tạo và sát hạch lái xe cơ giới đường bộ through an assign shorthand as an independent entity.
- Result: Won
14/01/2026 08:55
DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY Won the bidding for the Bidding package No. 02: Appraisal of bidding documents and results of selection of construction contractor package, which was invited for bidding by the Văn phòng Hội đồng nhân dân và Ủy ban nhân dân phường Phù Liễn through an assign shorthand as an independent entity.
- Result: Won
07/01/2026 09:29
DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY Won the bidding for the Consultancy and verification of construction drawing design and cost estimate package, which was invited for bidding by the Trung tâm chính trị phường An Dương through an assign shorthand as an independent entity.
- Result: Won
06/01/2026 14:21
DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY Won the bidding for the Package 04: Construction supervision consultancy and equipment installation package, which was invited for bidding by the Trường Đại Học Hải Phòng through an assign shorthand as an independent entity.
- Result: Won
23/12/2025 09:22
DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY Won the bidding for the Package 04: Construction supervision consultancy and equipment installation package, which was invited for bidding by the Trường Đại Học Hải Phòng through an assign shorthand as an independent entity.
- Result: Won
19/12/2025 11:38
DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY Won the bidding for the Package No. 02: Verification of the technical and economic report of the project to renovate and upgrade the road from National Highway 18A (Ha Dong 2 Bridge) to the residential area of Ha Dong Bac village, Hai Lang commune package, which was invited for bidding by the Trung tâm Cung ứng dịch vụ xã Hải Lạng through an assign shorthand as an independent entity.
- Result: Won
19/12/2025 11:29
DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY Won the bidding for the Evaluation of bidding documents and contractor selection results package, which was invited for bidding by the Văn phòng HĐND và UBND phường Nam Đồ Sơn through an assign shorthand as an independent entity.
- Result: Won
19/12/2025 10:09
DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY Won the bidding for the Consulting on Preparation of Finance and Technical Report package, which was invited for bidding by the Trường Đại học Hàng hải Việt Nam through an assign shorthand as an independent entity.
- Result: Won
17/12/2025 15:05
DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY Won the bidding for the Supervision consulting: Repair of exterior walls, men's restroom of house A4; Outside house drainage system A2, A3, A4 package, which was invited for bidding by the Trường Đại học Hàng hải Việt Nam through an assign shorthand as an independent entity.
- Result: Won
16/12/2025 10:38
DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY Won the bidding for the Consulting on Preparation of Finance and Technical Report package, which was invited for bidding by the HaiPhong university through an assign shorthand as an independent entity.
- Result: Won
10/12/2025 22:40
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY participated in 512 package, of which 512 package was won, failed 0 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY is related to 220 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY competed with 1 contractors in 1 package, won 1 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY participated in bidding in 4 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY participated in bidding in 5 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor