Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
1:44 AM 01/31/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
3:07 PM 01/31/2023 |
Active |
At the request of QTHT |
|
11:31 PM 04/02/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
2:51 PM 04/05/2024 |
Active |
At the request of QTHT |
|
12:06 AM 08/27/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:32 AM 08/28/2024 |
Active |
At the request of QTHT |
|
12:05 AM 01/07/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
1:47 PM 01/09/2025 |
Active |
At the request of QTHT |
|
12:05 AM 01/30/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
10:18 AM 02/04/2025 |
Active |
At the request of QTHT |
|
12:05 AM 05/10/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:14 AM 05/13/2025 |
Active |
At the request of QTHT |
|
12:05 AM 10/22/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:25 AM 10/23/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 122 bidding packages, of which 39 were won, 78 were lost, 4 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 57.16% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.64% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (46), Hải Phòng (10), Quảng Ninh (5), Lâm Đồng (5), Đồng Nai (4), Bắc Ninh (4), Thanh Hoá (3), Đắk Lắk (3), Thái Nguyên (2), Vĩnh Long (2), Ninh Bình (2), Đà Nẵng (2), Gia Lai (2), Lai Châu (1), Cần Thơ (1), TP.Hồ Chí Minh (1), Undefined (29)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (46), Hải Phòng (5), Hải Dương (5), Quảng Ninh (5), Thanh Hoá (3), Bình Phước (3), Lâm Đồng (3), Thái Nguyên (2), Trà Vinh (2), Ninh Bình (2), Bình Thuận (2), Đà Nẵng (2), Phú Yên (2), Bắc Giang (2), Gia Lai (2), Lai Châu (1), Bắc Ninh (1), Đắk Lắk (1), Cần Thơ (1), Bà Rịa - Vũng Tàu (1), Bình Định (1), Đồng Nai (1), Undefined (33)
- Has relationships with 63 Bid Solicitors
- Has competed against 53 contractors in 102 bidding packages, won 20 packages, lost 78 packages, 3 are pending results, and 1 were canceled.
- Has collaborated with 9 contractors in 11 bidding packages, won 3 packages, lost 8 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 6 bidding packages with 3 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 2.6% |
| Lower by 10% to 20% | 1 | 2.6% |
| Lower by 5% to 10% | 9 | 23.1% |
| Lower by 1% to 5% | 18 | 46.2% |
| Lower by 0% to 1% | 9 | 23.1% |
| 0% | 1 | 2.6% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 39 | 100% |
ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY join for the Upgrading, applying, integrating scientific research results on short -term load forecast on NSMO information portal system package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
15/12/2025 10:07
ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY Won the bidding for the Construction investment management system package, which was invited for bidding by the NATIONAL POWER SYSTEM AND MARKET OPERATOR COMPANY LIMITED through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
11/11/2025 14:54
ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY join for the Construction investment management system package, which was invited for bidding by the NATIONAL POWER SYSTEM AND MARKET OPERATOR COMPANY LIMITED through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
07/10/2025 10:04
ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY lost the bidding for the Additional modules check periodically lowering voltage grids in the software "Application of operation technical management, testing and experiments at the scene on mobile devices" package, which was invited for bidding by the CÔNG TY CÔNG NGHỆ THÔNG TIN ĐIỆN LỰC HÀ NỘI through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
30/09/2025 08:34
ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY lost the bidding for the Package No. 03: Building a software library software in Bac Giang College package, which was invited for bidding by the TRƯỜNG CAO ĐẲNG BẮC GIANG through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
29/09/2025 09:54
ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY join for the Additional modules check periodically lowering voltage grids in the software "Application of operation technical management, testing and experiments at the scene on mobile devices" package, which was invited for bidding by the CÔNG TY CÔNG NGHỆ THÔNG TIN ĐIỆN LỰC HÀ NỘI through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
22/09/2025 10:01
ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY join for the Package No. 03: Building a software library software in Bac Giang College package, which was invited for bidding by the TRƯỜNG CAO ĐẲNG BẮC GIANG through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
06/09/2025 10:05
ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY Won the bidding for the 01TV-CBDA-SCADA.NDDH-2024: Consulting survey, establishment of BCKTKT, E-HSMT Project upgrading and renovating SCADA system to meet IEC60870-5-104 Transmission Protocol for Duyen Hai 1 & 3 package, which was invited for bidding by the DUYEN HAI THERMAL POWER COMPANY through an Open bidding as an independent entity.
- Result: Won
16/07/2025 16:41
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY participated in 122 package, of which 39 package was won, failed 78 packages, 4 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY is related to 63 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY competed with 53 contractors in 102 package, won 20 package, lost 78 package, 3 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY once entered into a partnership with 9 contractors in 11 package, won bid 3 package, lost 8 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY participated in bidding in 16 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ENTERPRISE MANAGEMENT SERVICES JOINT STOCK COMPANY participated in bidding in 22 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor