Data analysis results of DauThau.info software for contractors EVERLASTING CONSTRUCTION TRUONG SINH COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 4 bidding packages, of which 3 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 94.06% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.87% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Trị (4)
- Provinces before the merger where the contractor has participated in bidding : Quảng Bình (4)
- Has relationships with 5 Bid Solicitors
- Has competed against 1 contractors in 1 bidding packages, won 0 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: Công ty TNHH Tư vấn Xây dựng Trường Sinh
- Construction capacity certificate code: 00032782
- Issuing Authority: Sở Kế hoạch và Đầu tư Quảng Bình
- Field:
⚬ Khảo sát xây dựng: Địa hình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng và Công nghiệp
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông cầu, đường bộ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Dân dụng và Công nghiệp
⚬ Giám sát thi công xây dựng công trình: Giao thông cầu, đường bộ
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
- Lab name: Construction Materials Laboratory and Construction Quality Inspection
- Laboratory code: LAS-XD 852
- Certifications:
⚬ Certificate 667/GCN-BXD.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | 0% |
| Lower by 10% to 20% | 0 | 0% |
| Lower by 5% to 10% | 0 | 0% |
| Lower by 1% to 5% | 0 | 0% |
| Lower by 0% to 1% | 2 | 66.7% |
| 0% | 1 | 33.3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 3 | 100% |
EVERLASTING CONSTRUCTION TRUONG SINH COMPANY lost the bidding for the Tender package No 01: Construction and installation package, which was invited for bidding by the CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG DTC through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Lost
17/07/2024 14:39
EVERLASTING CONSTRUCTION TRUONG SINH COMPANY Won the bidding for the Construction supervision package, which was invited for bidding by the Sở Du lịch tỉnh Quảng Bình through an assign shorthand as master consortium of CÔNG TY TNHH TƯ VẤN XÂY DỰNG TRƯỜNG SINH.
- Result: Won
17/07/2024 14:34
EVERLASTING CONSTRUCTION TRUONG SINH COMPANY join for the Tender package No 01: Construction and installation package, which was invited for bidding by the CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG DTC through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Tender opening completed
10/07/2024 08:01
EVERLASTING CONSTRUCTION TRUONG SINH COMPANY Won the bidding for the Construction and installation works: Renovating and repairing the unit command office - Dong Son Gaim Camp package, which was invited for bidding by the CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG TIẾN NAM through an Competitive Offer as an independent entity.
- Result: Won
01/07/2024 16:39
EVERLASTING CONSTRUCTION TRUONG SINH COMPANY join for the Construction and installation works: Renovating and repairing the unit command office - Dong Son Gaim Camp package, which was invited for bidding by the CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG TIẾN NAM through an Competitive Offer as an independent entity.
- Result: Tender opening completed
18/06/2024 10:32
EVERLASTING CONSTRUCTION TRUONG SINH COMPANY Won the bidding for the Construction (Including construction cost + equipment + contingency cost) package, which was invited for bidding by the Ban Quản lý Dự án đầu tư xây dựng công trình dân dụng và công nghiệp tỉnh Quảng Bình through an Chào hàng cạnh tranh trong nước as an independent entity.
- Result: Won
10/10/2022 11:24
EVERLASTING CONSTRUCTION TRUONG SINH COMPANY join for the Construction (Including construction cost + equipment + contingency cost) package, which was invited for bidding by the Ban Quản lý Dự án đầu tư xây dựng công trình dân dụng và công nghiệp tỉnh Quảng Bình through an Chào hàng cạnh tranh trong nước as an independent entity.
- Result: Tender opening completed
22/09/2022 08:34
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder EVERLASTING CONSTRUCTION TRUONG SINH COMPANY participated in 4 package, of which 3 package was won, failed 1 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor EVERLASTING CONSTRUCTION TRUONG SINH COMPANY is related to 5 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor EVERLASTING CONSTRUCTION TRUONG SINH COMPANY competed with 1 contractors in 1 package, won 0 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor EVERLASTING CONSTRUCTION TRUONG SINH COMPANY once entered into a partnership with 1 contractors in 1 package, won bid 1 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor EVERLASTING CONSTRUCTION TRUONG SINH COMPANY participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor EVERLASTING CONSTRUCTION TRUONG SINH COMPANY participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor