Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 142 bidding packages, of which 131 were won, 7 were lost, 4 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 26.26% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.62% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (52), Hải Phòng (8), Cần Thơ (6), Đồng Tháp (3), Khánh Hòa (3), Đồng Nai (2), Tây Ninh (2), Cà Mau (2), Lâm Đồng (1), Gia Lai (1), Undefined (64)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (27), Bà Rịa - Vũng Tàu (11), Hải Phòng (7), Hậu Giang (6), Bình Dương (4), Tiền Giang (2), Đồng Nai (2), Tây Ninh (2), Cà Mau (2), Bình Thuận (1), Khánh Hòa (1), Đồng Tháp (1), Hải Dương (1), Undefined (77)
- Has relationships with 29 Bid Solicitors
- Has competed against 23 contractors in 15 bidding packages, won 7 packages, lost 7 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 9 contractors in 12 bidding packages, won 8 packages, lost 3 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 66 bidding packages with 21 roles.
- Published contractor selection plan of 0 project with a total of 0 of bidding packages.
- Invitation to bid 3 package (with 3 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 3 packages announced, canceled bids 0 packages (among the packages above).
- There are 0 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY are as follows:
- As the investor of 0 investment and development projects.
- As the investor of 0 Contractor Selection Plan, including 0 self-published Contractor Selection Plan, 0 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 0 bidding package in which the package is self-inviting 0, with 0 the package is owned by the unit. other bidding.
- Building organization name: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ THIẾT KẾ SỐ MỘT
- Construction capacity certificate code: 00025333
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hồ Chí Minh
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế kết cấu Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế xây dựng công trình hạ tầng kỹ thuật cấp nước, thoát nước
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế xây dựng công trình giao thông đường bộ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế xây dựng công trình giao thông đường thủy
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế xây dựng công trình nong nghiệp và phát triển nông thôn thủy lợi
⚬ Khảo sát xây dựng: Địa hình, địa chất công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế xây dựng công trình Giao thông (đường bộ, cảng)
⚬ Lập quy hoạch xây dựng:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp Đường dây - Trạm biến áp
⚬ Giám sát thi công xây dựng công trình: Dân dụng và Công nghiệp
⚬ Giám sát thi công xây dựng công trình: Giao thông Đường bộ
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật Cấp, thoát nước
⚬ Giám sát thi công xây dựng công trình: Giao thông Cảng, đường thủy
⚬ Thi công xây dựng công trình: Giao thông Cảng, đường thủy
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 11 | 8.4% |
| Lower by 10% to 20% | 7 | 5.3% |
| Lower by 5% to 10% | 46 | 35.1% |
| Lower by 1% to 5% | 51 | 38.9% |
| Lower by 0% to 1% | 7 | 5.3% |
| 0% | 8 | 6.1% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 1 | 0.8% |
| Unknown | 0 | 0% |
| Total | 131 | 100% |
FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY join for the TV-11: Prepare construction drawing design documents and project estimates package, which was invited for bidding by the through an Open bidding as an independent entity.
02/01/2026 10:06
FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package TV-02: Consulting on construction drawing design package, which was invited for bidding by the CÔNG TY CỔ PHẦN CẢNG CÁT LÁI through an assign shorthand as an independent entity.
- Result: Won
30/12/2025 16:27
FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package TV-01: Topographic survey consulting for TKBVTC package, which was invited for bidding by the CÔNG TY CỔ PHẦN CẢNG CÁT LÁI through an assign shorthand as an independent entity.
- Result: Won
29/12/2025 10:14
FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package TV-01: Topographic and geological survey consulting, project: Infrastructure investment on 22.5ha land in Binh Duong package, which was invited for bidding by the CÔNG TY TNHH MỘT THÀNH VIÊN TỔNG CÔNG TY TÂN CẢNG SÀI GÒN through an assign bid as an independent entity.
- Result: Won
25/12/2025 07:47
FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the GT02: Examination of technical economic reports package, which was invited for bidding by the Maritime Administration of Hai Phong through an assign shorthand as an independent entity.
- Result: Won
24/12/2025 10:21
FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the TV-01: Survey the current situation, prepare a technical and economic report on construction investment package, which was invited for bidding by the CÔNG TY TNHH MỘT THÀNH VIÊN TỔNG CÔNG TY TÂN CẢNG SÀI GÒN through an assign shorthand as an independent entity.
- Result: Won
24/12/2025 08:02
FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Bidding package TV-01: prepare technical and economic report (BCKTKT) for construction investment package, which was invited for bidding by the CÔNG TY TNHH MỘT THÀNH VIÊN TỔNG CÔNG TY TÂN CẢNG SÀI GÒN through an assign shorthand as an independent entity.
- Result: Won
12/12/2025 08:28
FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package 1: Construction drawing design consultancy package, which was invited for bidding by the CÔNG TY CỔ PHẦN TÂN CẢNG - CÁI MÉP through an assign shorthand as an independent entity.
- Result: Won
04/12/2025 15:56
FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Package TV-03: Construction supervision consultant package, which was invited for bidding by the SAIGON NEWPORT ONE MEMBER LIMITED LIABILITY CORPORATION through an assign shorthand as an independent entity.
- Result: Won
24/11/2025 13:14
FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY Won the bidding for the TV-05: Construction supervision consultant package, which was invited for bidding by the SAIGON NEWPORT ONE MEMBER LIMITED LIABILITY CORPORATION through an assign shorthand as an independent entity.
- Result: Won
24/11/2025 13:07
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY participated in 142 package, of which 131 package was won, failed 7 packages, 4 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY is related to 29 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY competed with 23 contractors in 15 package, won 7 package, lost 7 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY once entered into a partnership with 9 contractors in 12 package, won bid 8 package, lost 3 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY participated in bidding in 10 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY participated in bidding in 13 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor