Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors GTDGROUP JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 39 bidding packages, of which 31 were won, 8 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 55% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 93.47% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (14), Ninh Bình (4), Phú Thọ (3), Hải Phòng (2), Đắk Lắk (2), Quảng Trị (1), Lai Châu (1), Tây Ninh (1), Đồng Tháp (1), Undefined (10)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (14), Hòa Bình (3), Hải Dương (2), Phú Yên (2), Ninh Bình (2), Hà Nam (1), Quảng Bình (1), Lai Châu (1), Long An (1), Đồng Tháp (1), Undefined (11)
- Has relationships with 23 Bid Solicitors
- Has competed against 30 contractors in 12 bidding packages, won 4 packages, lost 8 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 6 contractors in 15 bidding packages, won 7 packages, lost 8 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 3 bidding packages with 3 roles.
- Building organization name: CÔNG TY CỔ PHẦN GTDGROUP
- Construction capacity certificate code: 00007493
- Issuing Authority: Sở Kế hoạch và Đầu tư TP Hà Nội
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Khảo sát xây dựng: Khảo sát/Địa hình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Lập quy hoạch xây dựng: Lập quy hoạch xây dựng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 3.2% |
| Lower by 10% to 20% | 2 | 6.5% |
| Lower by 5% to 10% | 11 | 35.5% |
| Lower by 1% to 5% | 2 | 6.5% |
| Lower by 0% to 1% | 6 | 19.4% |
| 0% | 9 | 29% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 31 | 100% |
GTDGROUP JOINT STOCK COMPANY Won the bidding for the Package No. 4: Prepare detailed planning project package, which was invited for bidding by the UBND PHƯỜNG NGHĨA ĐÔ through an assign bid as master consortium of Liên danh Công ty Cổ phần GTDGROUP và Trung tâm Nghiên cứu Kiến trúc và Quy hoạch đô thị, nông thôn - Viện Quy hoạch xây dựng Hà Nội.
- Result: Won
12/12/2025 17:13
GTDGROUP JOINT STOCK COMPANY lost the bidding for the Terrain survey, planning scheme package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN GTDGROUP . Three other contractors also participated.
- Result: Lost
25/11/2025 16:56
GTDGROUP JOINT STOCK COMPANY Won the bidding for the Bidding package No. 02: Establishing planning tasks package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ - HẠ TẦNG PHƯỜNG TÙNG THIỆN through an assign bid as an independent entity.
- Result: Won
01/11/2025 11:21
GTDGROUP JOINT STOCK COMPANY Won the bidding for the Package No. 03: Making planning tasks package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ - HẠ TẦNG PHƯỜNG TÙNG THIỆN through an assign bid as an independent entity.
- Result: Won
01/11/2025 11:17
GTDGROUP JOINT STOCK COMPANY join for the Terrain survey, planning scheme package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN GTDGROUP . Three other contractors also participated.
- Result: Tender opening completed
14/10/2025 09:21
GTDGROUP JOINT STOCK COMPANY Won the bidding for the Consultancy and verification of construction investment feasibility study report package, which was invited for bidding by the PETROLIMEX TANKER CORPORATION through an assign shorthand as an independent entity.
- Result: Won
21/05/2025 15:39
GTDGROUP JOINT STOCK COMPANY lost the bidding for the Package No. 01: Topographic survey consulting, site clearance landmark placement and detailed construction planning at 1/500 scale package, which was invited for bidding by the Ban Quản lý dự án và Phát triển quỹ đất huyện Hồng Ngự, tỉnh Đồng Tháp through an Open bidding as master consortium of CÔNG TY CỔ PHẦN GTDGROUP . Three other contractors also participated.
- Result: Lost
13/05/2025 11:56
GTDGROUP JOINT STOCK COMPANY lost the bidding for the Topographic survey consultancy, landmark plugs and planning projects on construction zoning in the scale of 1/2000 Thinh Minh Industrial Park package, which was invited for bidding by the Ban Quản lý các khu công nghiệp tỉnh Hòa Bình through an Open bidding as master consortium of CÔNG TY CỔ PHẦN GTDGROUP . Three other contractors also participated.
- Result: Lost
25/04/2025 22:42
GTDGROUP JOINT STOCK COMPANY Won the bidding for the Package No. 02TV: Topographic survey and survey consultation and planning task planning 1/2000 scale package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng khu vực Tuy Hòa through an Open bidding as sub-joint of LIÊN DANH CÔNG TY CỔ PHẦN GTDGROUP VÀ CÔNG TY TNHH HỢP NHẤT BÁCH VIỆT . Three other contractors also participated.
- Result: Won
11/04/2025 11:37
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder GTDGROUP JOINT STOCK COMPANY participated in 39 package, of which 31 package was won, failed 8 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor GTDGROUP JOINT STOCK COMPANY is related to 23 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor GTDGROUP JOINT STOCK COMPANY competed with 30 contractors in 12 package, won 4 package, lost 8 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor GTDGROUP JOINT STOCK COMPANY once entered into a partnership with 6 contractors in 15 package, won bid 7 package, lost 8 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor GTDGROUP JOINT STOCK COMPANY participated in bidding in 9 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor GTDGROUP JOINT STOCK COMPANY participated in bidding in 10 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor