Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:05 AM 04/16/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
11:25 AM 04/16/2024 |
Active |
At the request of QTHT |
|
12:05 AM 05/05/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
11:04 AM 05/06/2024 |
Active |
At the request of QTHT |
|
12:05 AM 06/09/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
10:39 AM 06/18/2024 |
Active |
At the request of QTHT |
|
1:02 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
Data analysis results of DauThau.info software for contractors HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 71 bidding packages, of which 36 were won, 34 were lost, 1 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 66.94% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.28% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (44), Undefined (27)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (44), Undefined (27)
- Has relationships with 19 Bid Solicitors
- Has competed against 30 contractors in 53 bidding packages, won 19 packages, lost 34 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 9 contractors in 8 bidding packages, won 8 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 12 bidding packages with 3 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 2 | 5.6% |
| Lower by 10% to 20% | 8 | 22.2% |
| Lower by 5% to 10% | 15 | 41.7% |
| Lower by 1% to 5% | 9 | 25% |
| Lower by 0% to 1% | 2 | 5.6% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 36 | 100% |
HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY lost the bidding for the Package No. DTXD-2024-TK-134: Consulting on preparing technical and economic reports for construction works "Creating low voltage interconnection circuits for adjacent low-load substations" package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC TÂY HỒ through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
05/06/2024 17:20
HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY join for the Package No. DTXD-2024-TK-134: Consulting on preparing technical and economic reports for construction works "Creating low voltage interconnection circuits for adjacent low-load substations" package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC TÂY HỒ through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
25/05/2024 15:31
HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY lost the bidding for the Consulting on preparation of Economic - Technical Report of construction Installation of Recloser with ground fault protection function on medium voltage power grid of routes 371E1.7, 372E1.7, 375E1.7, 376E1.7, 378E1.7 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC SƠN TÂY through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
21/05/2024 14:40
HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY lost the bidding for the Bidding package No. 17/24/PCNTL-TV: Consulting on preparing the BSD for construction of the project "Creating busbar interconnection circuits and renovating feeder cables at transformer stations to ensure power supply in 2024 - Phase 2" package, which was invited for bidding by the TULIEM POWER COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
24/04/2024 14:28
HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Bidding package No. 12/24/PCNTL-TV: Consulting on preparation of technical feasibility report for construction of project "New construction of substations in Nam Tu Liem district in 2024 - Phase 2" package, which was invited for bidding by the TULIEM POWER COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
22/04/2024 15:34
HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY Won the bidding for the Bid package No. 15/24/PCNTL-TV: Consulting on preparing the BSD for construction of the project "Installation of RMU cabinets with SCADA remote control and monitoring function for the underground medium voltage power grid in Nam Tu Liem district in the period of 2024" package, which was invited for bidding by the TULIEM POWER COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
22/04/2024 14:46
HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY join for the Consulting on preparation of Economic - Technical Report of construction Installation of Recloser with ground fault protection function on medium voltage power grid of routes 371E1.7, 372E1.7, 375E1.7, 376E1.7, 378E1.7 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC SƠN TÂY through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
20/04/2024 09:30
HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY join for the Bidding package No. 12/24/PCNTL-TV: Consulting on preparation of technical feasibility report for construction of project "New construction of substations in Nam Tu Liem district in 2024 - Phase 2" package, which was invited for bidding by the TULIEM POWER COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
01/04/2024 11:39
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY participated in 71 package, of which 36 package was won, failed 34 packages, 1 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY is related to 19 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY competed with 30 contractors in 53 package, won 19 package, lost 34 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY once entered into a partnership with 9 contractors in 8 package, won bid 8 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HA NOI ELECTRICITY CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor