Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
5:42 AM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:18 AM 04/05/2023 |
Active |
At the request of QTHT |
|
12:04 AM 04/15/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
2:57 PM 04/21/2023 |
Active |
At the request of QTHT |
|
11:31 PM 02/03/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
7:50 AM 02/07/2024 |
Active |
At the request of QTHT |
|
12:41 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
4:41 PM 07/04/2024 |
Active |
At the request of QTHT |
|
12:05 AM 01/27/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:30 AM 02/20/2025 |
Active |
At the request of QTHT |
|
12:25 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
11:16 AM 04/17/2025 |
Active |
At the request of QTHT |
|
12:05 AM 05/08/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
2:38 PM 05/08/2025 |
Active |
At the request of QTHT |
|
12:05 AM 08/22/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
11:02 PM 08/30/2025 |
Active |
At the request of QTHT |
|
12:05 AM 09/20/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
1:53 PM 09/22/2025 |
Active |
At the request of QTHT |
|
12:05 AM 10/08/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
2:25 PM 10/29/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors HAWACO CENTRAL JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 37 bidding packages, of which 23 were won, 13 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 62.27% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 89.56% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (17), Gia Lai (6), TP.Hồ Chí Minh (6), Hà Nội (1), Khánh Hòa (1), An Giang (1), Đắk Lắk (1), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding : Đà Nẵng (15), Gia Lai (6), TP.Hồ Chí Minh (6), Hà Nội (1), Khánh Hòa (1), Kiên Giang (1), Undefined (7)
- Has relationships with 11 Bid Solicitors
- Has competed against 54 contractors in 23 bidding packages, won 10 packages, lost 12 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 7 contractors in 5 bidding packages, won 2 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: CÔNG TY CỔ PHẦN HAWACO MIỀN TRUNG
- Construction capacity certificate code: 00060644
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Đà Nẵng
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật cấp nước; thoát nước
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình dân dụng
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình giao thông đường bộ
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình phục vụ nông nghiệp và phát triển nông thôn thủy lợi, đê điều
⚬ Thi công lắp đặt thiết bị vào công trình: Dân dụng
⚬ Thi công lắp đặt thiết bị vào công trình: Hạ tầng kỹ thuật
⚬ Thi công lắp đặt thiết bị vào công trình: Giao thông đường bộ
⚬ Thi công lắp đặt thiết bị vào công trình: Phục vụ nông nghiệp và phát triển nông thôn thủy lợi; đê điều
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 4.3% |
| Lower by 10% to 20% | 6 | 26.1% |
| Lower by 5% to 10% | 2 | 8.7% |
| Lower by 1% to 5% | 7 | 30.4% |
| Lower by 0% to 1% | 1 | 4.3% |
| 0% | 6 | 26.1% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 23 | 100% |
HAWACO CENTRAL JOINT STOCK COMPANY Won the bidding for the Drill across the road package, which was invited for bidding by the CÔNG TY CỔ PHẦN CẤP NƯỚC ĐÀ NẴNG through an assign shorthand as an independent entity.
- Result: Won
30/12/2025 15:32
HAWACO CENTRAL JOINT STOCK COMPANY lost the bidding for the Replace 04 fading door valves in front of the garbage scratch machine at Hoa Phu Pump Station package, which was invited for bidding by the SAIGON WATER CORPORATION through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
29/12/2025 20:45
HAWACO CENTRAL JOINT STOCK COMPANY lost the bidding for the Shop for cast iron pipes and cast iron parts in the last 6 months of 2025 package, which was invited for bidding by the DA NANG WATER SUPPLY JOINT STOCK COMPANY through an Open bidding as master consortium of CÔNG TY CỔ PHẦN HAWACO MIỀN TRUNG. Eight other contractors also participated.
- Result: Lost
21/11/2025 16:27
HAWACO CENTRAL JOINT STOCK COMPANY Won the bidding for the Provide all kinds of materials to connect the instrument cluster package, which was invited for bidding by the Trung tâm Nước sạch và Vệ sinh môi trường nông thôn through an Competitive Offer as an independent entity.
- Result: Won
30/09/2025 17:29
HAWACO CENTRAL JOINT STOCK COMPANY Won the bidding for the Buy a control valve for filter tank at Rach Gia water factory package, which was invited for bidding by the KIEN GIANG WATER SUPPY AND SEWERAGE LIMITED COMPANY through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Won
23/09/2025 17:43
HAWACO CENTRAL JOINT STOCK COMPANY join for the Replace 04 fading door valves in front of the garbage scratch machine at Hoa Phu Pump Station package, which was invited for bidding by the SAIGON WATER CORPORATION through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Tender opening completed
23/09/2025 09:03
HAWACO CENTRAL JOINT STOCK COMPANY join for the Shop for cast iron pipes and cast iron parts in the last 6 months of 2025 package, which was invited for bidding by the DA NANG WATER SUPPLY JOINT STOCK COMPANY through an Open bidding as master consortium of CÔNG TY CỔ PHẦN HAWACO MIỀN TRUNG. Eight other contractors also participated.
- Result: Tender opening completed
10/09/2025 09:03
HAWACO CENTRAL JOINT STOCK COMPANY join for the Provide all kinds of materials to connect the instrument cluster package, which was invited for bidding by the Trung tâm Nước sạch và Vệ sinh môi trường nông thôn through an Competitive Offer as an independent entity.
- Result: Tender opening completed
05/09/2025 08:15
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder HAWACO CENTRAL JOINT STOCK COMPANY participated in 37 package, of which 23 package was won, failed 13 packages, 0 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HAWACO CENTRAL JOINT STOCK COMPANY is related to 11 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HAWACO CENTRAL JOINT STOCK COMPANY competed with 54 contractors in 23 package, won 10 package, lost 12 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor HAWACO CENTRAL JOINT STOCK COMPANY once entered into a partnership with 7 contractors in 5 package, won bid 2 package, lost 3 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor HAWACO CENTRAL JOINT STOCK COMPANY participated in bidding in 7 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HAWACO CENTRAL JOINT STOCK COMPANY participated in bidding in 6 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor