Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:01 AM 02/21/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:00 AM 02/21/2023 |
Active |
At the request of QTHT |
|
12:01 AM 05/11/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
10:25 AM 05/11/2023 |
Active |
At the request of QTHT |
|
12:58 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
10:16 AM 07/01/2024 |
Active |
At the request of QTHT |
|
12:06 AM 09/03/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
11:48 AM 09/04/2024 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors HIPT GROUP JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 846 bidding packages, of which 386 were won, 401 were lost, 37 are pending results, and 22 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 28.73% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.19% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (523), TP.Hồ Chí Minh (139), Đà Nẵng (38), Khánh Hòa (14), Cần Thơ (13), Đồng Nai (12), Vĩnh Long (11), Đồng Tháp (9), Gia Lai (8), Hải Phòng (8), Nationwide (8), Phú Thọ (7), Đắk Lắk (7), An Giang (7), Cà Mau (6), Quảng Trị (5), Tây Ninh (5), Bắc Ninh (5), Quảng Ngãi (5), Hưng Yên (5), Lâm Đồng (4), Hà Tĩnh (4), Ninh Bình (3), Thanh Hoá (3), Quảng Ninh (3), Lào Cai (3), Thái Nguyên (2), Cao Bằng (1), Undefined (55)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (523), TP.Hồ Chí Minh (110), Đà Nẵng (27), Bình Dương (15), Đồng Nai (11), Khánh Hòa (11), Quảng Nam (9), Nationwide (8), Đồng Tháp (7), Kiên Giang (6), Vĩnh Long (6), Cần Thơ (5), Bà Rịa - Vũng Tàu (5), Bình Định (5), Hải Phòng (5), Bắc Ninh (4), Bình Thuận (4), Hưng Yên (4), Hà Tĩnh (4), Gia Lai (3), Quảng Bình (3), Hậu Giang (3), Tây Ninh (3), Cà Mau (3), Trà Vinh (3), Sóc Trăng (3), Ninh Thuận (3), Bạc Liêu (3), Thanh Hoá (3), Quảng Ngãi (3), Vĩnh Phúc (3), Phú Yên (3), Quảng Ninh (3), Hòa Bình (2), Đắk Lắk (2), Bình Phước (2), Thái Nguyên (2), Ninh Bình (2), Quảng Trị (2), Bến Tre (2), Hải Dương (2), Nam Định (1), Bắc Giang (1), An Giang (1), Cao Bằng (1), Long An (1), Phú Thọ (1), Đắk Nông (1), Lâm Đồng (1), Kon Tum (1), Undefined (138)
- Has relationships with 341 Bid Solicitors
- Has competed against 530 contractors in 679 bidding packages, won 227 packages, lost 382 packages, 53 are pending results, and 17 were canceled.
- Has collaborated with 74 contractors in 108 bidding packages, won 65 packages, lost 33 packages, 6 are pending results, and 4 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Year started in TOP 500: 2008 (VNR500 private)
- Industry: Manufacturing and Trading of Electronics, Refrigeration, IT, and Telecommunications…
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 22 | 5.7% |
| Lower by 10% to 20% | 19 | 4.9% |
| Lower by 5% to 10% | 49 | 12.7% |
| Lower by 1% to 5% | 144 | 37.3% |
| Lower by 0% to 1% | 135 | 35% |
| 0% | 16 | 4.1% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 1 | 0.3% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 386 | 100% |
HIPT GROUP JOINT STOCK COMPANY Won the bidding for the Printer shopping; replacing components (consumed supplies) equipment for charge collection package, which was invited for bidding by the Trung tâm Thông tin và Dữ liệu khí tượng thủy văn through an Competitive Offer as an independent entity.
- Result: Won
12/01/2026 16:17
HIPT GROUP JOINT STOCK COMPANY join for the Purchasing licenses for cloud video conferencing services package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
12/01/2026 10:19
HIPT GROUP JOINT STOCK COMPANY Won the bidding for the Provide technical support services (expansion warranty) for IT equipment package, which was invited for bidding by the Cục Thuế through an Open bidding as sub-joint of Liên danh Công ty Cổ phần Công nghệ mạng và truyền thông - Công ty Cổ phần Tập đoàn HIPT.
- Result: Won
10/01/2026 14:00
HIPT GROUP JOINT STOCK COMPANY join for the 08-2025-CNTT: Supplying firewall equipment, load balancing expansion of Private Cloud infrastructure and related services package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
05/01/2026 15:46
HIPT GROUP JOINT STOCK COMPANY lost the bidding for the Administration and operations. Technical support and software maintenance Statistical data warehouse and business analysis package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
31/12/2025 17:52
HIPT GROUP JOINT STOCK COMPANY lost the bidding for the Maintenance service and technical support for VRB . network devices package, which was invited for bidding by the through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Lost
31/12/2025 11:03
HIPT GROUP JOINT STOCK COMPANY lost the bidding for the Software copyright renewal package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
30/12/2025 16:52
HIPT GROUP JOINT STOCK COMPANY Won the bidding for the Procurement of fixed fixed assets of 2025 of the IT Board package, which was invited for bidding by the BINH SON REFINING AND PETROCHEMICAL JOINT STOCK COMPANY through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Won
29/12/2025 11:53
HIPT GROUP JOINT STOCK COMPANY lost the bidding for the Equipped with San Switch device replacement package, which was invited for bidding by the BAOVIET HOLDINGS through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
29/12/2025 10:07
HIPT GROUP JOINT STOCK COMPANY join for the License renewal of centralized firewall policy management software package, which was invited for bidding by the through an Competitive Offer as an independent entity. One other contractors also participated.
29/12/2025 10:04
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder HIPT GROUP JOINT STOCK COMPANY participated in 846 package, of which 386 package was won, failed 401 packages, 37 packages with no results, 22 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HIPT GROUP JOINT STOCK COMPANY is related to 341 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HIPT GROUP JOINT STOCK COMPANY competed with 530 contractors in 679 package, won 227 package, lost 382 package, 53 bidding package has no results, 17 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor HIPT GROUP JOINT STOCK COMPANY once entered into a partnership with 74 contractors in 108 package, won bid 65 package, lost 33 package, 6 bidding package has no results, 4 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor HIPT GROUP JOINT STOCK COMPANY participated in bidding in 27 provinces/cities, 8 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HIPT GROUP JOINT STOCK COMPANY participated in bidding in 49 provinces/cities, 8 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor