Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors HOP LONG TECHNOLOGY JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 14 bidding packages, of which 10 were won, 3 were lost, 0 are pending results, and 1 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 84.03% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.57% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Bắc Ninh (3), Quảng Trị (1), Thừa Thiên - Huế (1), Yên Bái (1), Bà Rịa - Vũng Tàu (1), Hà Nội (1), Thanh Hoá (1), Undefined (5)
- Has relationships with 10 Bid Solicitors
- Has competed against 18 contractors in 4 bidding packages, won 1 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 2 | 20% |
Lower by 1% to 5% | 2 | 20% |
Lower by 0% to 1% | 4 | 40% |
0% | 2 | 20% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 10 | 100% |
HOP LONG TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Professional training for lecturers in the Industrial Electrical profession package, which was invited for bidding by the Trường Cao đẳng Cơ điện và Xây dựng Bắc Ninh through an assign shorthand as an independent entity.
- Result: Won
11/10/2024 16:15
HOP LONG TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Professional training for industrial electronics instructors package, which was invited for bidding by the Trường Cao đẳng Cơ điện và Xây dựng Bắc Ninh through an assign shorthand as an independent entity.
- Result: Won
26/08/2024 16:25
HOP LONG TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Professional training for lecturers in control and automation technology package, which was invited for bidding by the Trường Cao đẳng Cơ điện và Xây dựng Bắc Ninh through an assign shorthand as an independent entity.
- Result: Won
05/08/2024 14:15
HOP LONG TECHNOLOGY JOINT STOCK COMPANY lost the bidding for the Procurement of inverters for 04 water supply plants package, which was invited for bidding by the Trung tâm nước sinh hoạt và vệ sinh môi trường nông thôn Thanh Hóa through an Shortened competitive offer as an independent entity. Seven other contractors also participated.
- Result: Lost
27/12/2023 08:24
HOP LONG TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Raw materials for manufacturing 3D field scanning equipment using Lidar technology package, which was invited for bidding by the Centre for Optoelectronic through an Competitive Offer as an independent entity.
- Result: Won
13/11/2023 10:28
HOP LONG TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Supply and installation of automatic bagging system (for Line B) package, which was invited for bidding by the PETROVIETNAM FERTILIZER AND CHEMICALS CORPORATION through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN THƯƠNG MẠI DỊCH VỤ KỸ THUẬT CHẤN HƯNG.
- Result: Won
06/03/2023 09:00
HOP LONG TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the No. 02: "Purchase of materials for electrical and control systems" package, which was invited for bidding by the Military Technical Academy through an assign shorthand as an independent entity.
- Result: Won
22/02/2023 14:49
HOP LONG TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Supply 01 set of NW16H1 4P 50KA 1600A cutter body for Phu Cat Airport. package, which was invited for bidding by the PhucatAirport through an Competitive Offer as an independent entity.
- Result: Won
15/12/2022 10:29
HOP LONG TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Supply 01 set of cutter body NW32H1 4P 65KA 3200A for Phu Cat Airport package, which was invited for bidding by the PhucatAirport through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Won
14/12/2022 08:56
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder HOP LONG TECHNOLOGY JOINT STOCK COMPANY participated in 14 package, of which 10 package was won, failed 3 packages, 0 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HOP LONG TECHNOLOGY JOINT STOCK COMPANY is related to 10 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HOP LONG TECHNOLOGY JOINT STOCK COMPANY competed with 18 contractors in 4 package, won 1 package, lost 3 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor HOP LONG TECHNOLOGY JOINT STOCK COMPANY once entered into a partnership with 1 contractors in 1 package, won bid 1 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor HOP LONG TECHNOLOGY JOINT STOCK COMPANY participated in bidding in 7 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,772 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code