Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
1:10 AM 07/09/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:45 AM 08/11/2023 |
Active |
At the request of QTHT |
|
12:06 AM 08/27/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
2:22 PM 09/13/2023 |
Active |
At the request of QTHT |
|
12:13 AM 10/08/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
10:22 AM 12/04/2023 |
Active |
At the request of QTHT |
|
12:05 AM 11/22/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:30 AM 12/23/2024 |
Active |
At the request of QTHT |
|
1:00 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
Data analysis results of DauThau.info software for contractors HQ LIFE JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 34 bidding packages, of which 23 were won, 9 were lost, 2 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 77.12% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.25% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Huế (31), Đà Nẵng (1), TP.Hồ Chí Minh (1), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : Huế (31), Undefined (6)
- Has relationships with 8 Bid Solicitors
- Has competed against 24 contractors in 22 bidding packages, won 8 packages, lost 9 packages, 5 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 4.3% |
| Lower by 10% to 20% | 5 | 21.7% |
| Lower by 5% to 10% | 4 | 17.4% |
| Lower by 1% to 5% | 4 | 17.4% |
| Lower by 0% to 1% | 0 | 0% |
| 0% | 9 | 39.1% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 23 | 100% |
HQ LIFE JOINT STOCK COMPANY join for the Providing drinking water machines and supplies and accessories for drinking water machines, manual wash basins, and sterile water sources by 2025 package, which was invited for bidding by the through an Competitive Offer as an independent entity. Two other contractors also participated.
14/01/2026 08:35
HQ LIFE JOINT STOCK COMPANY join for the Tender package No 02: Procurement of RO pure water filtration system for Kindergarten No. 2 Hoa Phong package, which was invited for bidding by the through an Competitive Offer as an independent entity. Two other contractors also participated.
10/01/2026 08:27
HQ LIFE JOINT STOCK COMPANY Won the bidding for the Bidding package No. 02: Cost of purchasing equipment and goods package, which was invited for bidding by the Phòng Văn hóa – Xã hội xã Phú Vinh through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Won
30/12/2025 18:33
HQ LIFE JOINT STOCK COMPANY Won the bidding for the Package No. 03: Procurement and installation of smart broadcasting system in Phong Phu ward package, which was invited for bidding by the VĂN PHÒNG HĐND VÀ UBND PHƯỜNG PHONG PHÚ through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Won
29/12/2025 16:25
HQ LIFE JOINT STOCK COMPANY join for the Bidding package No. 02: Cost of purchasing equipment and goods package, which was invited for bidding by the through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
27/12/2025 09:26
HQ LIFE JOINT STOCK COMPANY join for the Package No. 03: Procurement and installation of smart broadcasting system in Phong Phu ward package, which was invited for bidding by the through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
25/12/2025 09:51
HQ LIFE JOINT STOCK COMPANY Won the bidding for the Package No. 2: Procurement and equipment for a smart radio system in Phu Ho commune package, which was invited for bidding by the PHÒNG KINH TẾ XÃ PHÚ HỒ through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Won
24/12/2025 14:05
HQ LIFE JOINT STOCK COMPANY Won the bidding for the Contract package: Led screen system of Huong Tra Ward Party Committee package, which was invited for bidding by the ĐẢNG ỦY PHƯỜNG HƯƠNG TRÀ through an assign shorthand as an independent entity.
- Result: Won
18/12/2025 15:55
HQ LIFE JOINT STOCK COMPANY join for the Package No. 2: Procurement and equipment for a smart radio system in Phu Ho commune package, which was invited for bidding by the through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
18/12/2025 10:11
HQ LIFE JOINT STOCK COMPANY Won the bidding for the A Luoi 5 commune smart broadcasting system package, which was invited for bidding by the Phòng Văn hóa – Xã hội xã A Lưới 5 through an assign shorthand as an independent entity.
- Result: Won
05/12/2025 15:00
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder HQ LIFE JOINT STOCK COMPANY participated in 34 package, of which 23 package was won, failed 9 packages, 2 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HQ LIFE JOINT STOCK COMPANY is related to 8 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HQ LIFE JOINT STOCK COMPANY competed with 24 contractors in 22 package, won 8 package, lost 9 package, 5 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor HQ LIFE JOINT STOCK COMPANY once entered into a partnership with 1 contractors in 1 package, won bid 1 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor HQ LIFE JOINT STOCK COMPANY participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HQ LIFE JOINT STOCK COMPANY participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor