Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors IDIC JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 43 bidding packages, of which 38 were won, 3 were lost, 2 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 79.17% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 91.53% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (7), Ninh Bình (7), Cà Mau (4), TP.Hồ Chí Minh (3), Lạng Sơn (2), An Giang (2), Đồng Nai (1), Bắc Ninh (1), Đà Nẵng (1), Khánh Hòa (1), Hải Phòng (1), Undefined (13)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (7), Ninh Bình (5), Cà Mau (4), Lạng Sơn (2), TP.Hồ Chí Minh (2), Kiên Giang (2), Bình Dương (1), Đồng Nai (1), Bắc Ninh (1), Quảng Nam (1), Khánh Hòa (1), Hải Phòng (1), Nam Định (1), Undefined (14)
- Has relationships with 29 Bid Solicitors
- Has competed against 21 contractors in 12 bidding packages, won 9 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 7 contractors in 9 bidding packages, won 8 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 10 bidding packages with 7 roles.
- Building organization name: Công ty Cổ phần Kiến trúc IDIC
- Construction capacity certificate code: 00003926
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hà Nội
- Field:
⚬ Khảo sát xây dựng: Khảo sát địa hình, địa chất công trình xây dựng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế công trình Hạ tầng kỹ thuật
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình Giao thông, Thủy lợi
⚬ Lập quy hoạch xây dựng: Lập quy hoạch xây dựng (Vườn quốc gia, Khu bảo tồn)
⚬ Giám sát thi công xây dựng công trình: Giám sát thi công xây dựng công trình Dân dụng, Công nghiệp, Hạ tầng kỹ thuật, Thủy lợi
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 2.6% |
| Lower by 10% to 20% | 9 | 23.7% |
| Lower by 5% to 10% | 4 | 10.5% |
| Lower by 1% to 5% | 9 | 23.7% |
| Lower by 0% to 1% | 13 | 34.2% |
| 0% | 2 | 5.3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 38 | 100% |
IDIC JOINT STOCK COMPANY Won the bidding for the Surveying consultancy, preparing adjustable research reports package, which was invited for bidding by the Văn phòng Bộ Nông nghiệp và Môi trường through an assign shorthand as an independent entity.
- Result: Won
10/01/2026 10:43
IDIC JOINT STOCK COMPANY join for the Tender package No 07: Survey consulting, construction design and implementation after basic design package, which was invited for bidding by the through an Open bidding as an independent entity.
06/01/2026 08:10
IDIC JOINT STOCK COMPANY Won the bidding for the Consulting package for creating technical skills: renovating the unit 3,4 housing and student houses My Dinh II, Tu Liem Ward, Hanoi City package, which was invited for bidding by the Hanoi Housing Management Center through an assign shorthand as an independent entity.
- Result: Won
08/09/2025 14:09
IDIC JOINT STOCK COMPANY Won the bidding for the Package 02: Consulting survey, making feasibility study report package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng công trình Nông nghiệp và Phát triển nông thôn tỉnh Ninh Bình through an Open bidding as an independent entity.
- Result: Won
02/07/2025 17:22
IDIC JOINT STOCK COMPANY lost the bidding for the Consultancy of construction supervision and equipment installation package, which was invited for bidding by the Ban Quản lý dự án khu vực VIII - Ban QLDA ĐTXD tỉnh Lạng Sơn through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN IDIC. Eight other contractors also participated.
- Result: Lost
29/06/2025 16:52
IDIC JOINT STOCK COMPANY join for the Package 02: Consulting survey, making feasibility study report package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng công trình Nông nghiệp và Phát triển nông thôn tỉnh Ninh Bình through an Open bidding as an independent entity.
- Result: Tender opening completed
23/06/2025 08:18
IDIC JOINT STOCK COMPANY Won the bidding for the Package No. 09: Construction supervision and equipment installation package, which was invited for bidding by the TRUONG GIANG CONSTRUCTION TECHNOLOGY SERVICES JOINT STOCK COMPANY through an Open bidding as sub-joint of Liên danh Công ty Cổ phần Tư vấn Đầu tư Xây dựng và Phát triển Thương mại Việt Nam và Công ty cổ phần IDIC (Viết tắt CID-IDIC). One other contractors also participated.
- Result: Won
10/06/2025 18:23
IDIC JOINT STOCK COMPANY Won the bidding for the Package No. 11: Supervision of construction and equipment installation package, which was invited for bidding by the DSC INVESTMENT CONSULTANT AND CONSTRUCTION MANAGEMENT JOINT STOCK COMPANY through an Open bidding as sub-joint of Liên danh Công ty Cổ phần Tư vấn Đầu tư Xây dựng và Phát triển Thương mại Việt Nam và Công ty cổ phần IDIC (Viết tắt CID-IDIC). One other contractors also participated.
- Result: Won
06/06/2025 12:15
IDIC JOINT STOCK COMPANY join for the Package No. 09: Construction supervision and equipment installation package, which was invited for bidding by the TRUONG GIANG CONSTRUCTION TECHNOLOGY SERVICES JOINT STOCK COMPANY through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN IDIC. One other contractors also participated.
- Result: Tender opening completed
02/06/2025 17:10
IDIC JOINT STOCK COMPANY join for the Package No. 11: Supervision of construction and equipment installation package, which was invited for bidding by the DSC INVESTMENT CONSULTANT AND CONSTRUCTION MANAGEMENT JOINT STOCK COMPANY through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN IDIC. One other contractors also participated.
- Result: Tender opening completed
31/05/2025 15:19
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder IDIC JOINT STOCK COMPANY participated in 43 package, of which 38 package was won, failed 3 packages, 2 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor IDIC JOINT STOCK COMPANY is related to 29 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor IDIC JOINT STOCK COMPANY competed with 21 contractors in 12 package, won 9 package, lost 3 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor IDIC JOINT STOCK COMPANY once entered into a partnership with 7 contractors in 9 package, won bid 8 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor IDIC JOINT STOCK COMPANY participated in bidding in 11 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor IDIC JOINT STOCK COMPANY participated in bidding in 13 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor