History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
2:37 AM 10/16/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
3:37 PM 10/24/2022 |
Active |
At the request of QTHT |
|
12:04 AM 06/08/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
10:18 AM 06/08/2023 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 298 bidding packages, of which 126 were won, 155 were lost, 9 are pending results, and 8 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 25.97% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 89.26% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Gia Lai (63), Sơn La (31), Đà Nẵng (27), Tuyên Quang (21), Đắk Lắk (20), Hà Nội (20), Lai Châu (17), Lâm Đồng (14), Nghệ An (9), Vĩnh Long (6), Đồng Nai (6), Phú Thọ (6), Thanh Hoá (6), Quảng Ninh (5), TP.Hồ Chí Minh (4), Quảng Ngãi (4), Hải Phòng (3), Ninh Bình (1), Hưng Yên (1), Hà Tĩnh (1), Huế (1), Cần Thơ (1), Lào Cai (1), Thái Nguyên (1), Undefined (40)
- Provinces before the merger where the contractor has participated in bidding : Gia Lai (43), Sơn La (31), Quảng Nam (27), Tuyên Quang (21), Hà Nội (20), Bình Định (19), Lai Châu (17), Đắk Lắk (12), Nghệ An (9), Trà Vinh (6), Phú Yên (6), Bình Thuận (6), Thanh Hoá (6), Quảng Ninh (5), Hòa Bình (5), Lâm Đồng (4), Bình Phước (3), Bà Rịa - Vũng Tàu (3), Hải Dương (3), Đồng Nai (3), Kon Tum (2), TP.Hồ Chí Minh (1), Ninh Bình (1), Thái Bình (1), Hà Tĩnh (1), Huế (1), Cần Thơ (1), Yên Bái (1), Thái Nguyên (1), Đắk Nông (1), Undefined (52)
- Has relationships with 66 Bid Solicitors
- Has competed against 288 contractors in 268 bidding packages, won 97 packages, lost 152 packages, 11 are pending results, and 8 were canceled.
- Has collaborated with 27 contractors in 59 bidding packages, won 29 packages, lost 25 packages, 3 are pending results, and 2 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 26 | 20.6% |
| Lower by 10% to 20% | 19 | 15.1% |
| Lower by 5% to 10% | 35 | 27.8% |
| Lower by 1% to 5% | 38 | 30.2% |
| Lower by 0% to 1% | 4 | 3.2% |
| 0% | 1 | 0.8% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 3 | 2.4% |
| Unknown | 0 | 0% |
| Total | 126 | 100% |
KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY lost the bidding for the No. 04MSHHH-SCL-2025: Providing large equipment and technical repair equipment and services to regulate the system of H2-Song Tranh Hydroelectric Plant 2 package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN GIẢI PHÁP CÔNG NGHỆ VÀ NĂNG LƯỢNG KIÊN PHÁT. Eight other contractors also participated.
- Result: Lost
07/01/2026 13:45
KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY lost the bidding for the Package No. 03: Procurement, installation and replacement system to regulate the H1 machine package, which was invited for bidding by the SONG BA HA HYDRO POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
25/12/2025 15:17
KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY join for the Providing strategic backup materials and equipment for Hua Na Hydropower Joint Stock Company package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
15/12/2025 15:02
KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY lost the bidding for the Package No. 01.KHCB2026 - Provides the Size System from H1, H2 Buon Thao Srah Hydroelectric Plant package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN GIẢI PHÁP CÔNG NGHỆ VÀ NĂNG LƯỢNG KIÊN PHÁT. Nine other contractors also participated.
- Result: Lost
04/12/2025 15:40
KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY Won the bidding for the E-SCL01-2026: Supplying goods and technical services for major repair in 2026. Category: H5-NPT of Son La. Category: Speeding system and wing adjustment package, which was invited for bidding by the CÔNG TY THỦY ĐIỆN SƠN LA - CHI NHÁNH TẬP ĐOÀN ĐIỆN LỰC VIỆT NAM through an Open bidding as master consortium of Liên danh Kiên Phát - Phan Triệu. Two other contractors also participated.
- Result: Won
28/11/2025 09:36
KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY join for the No. 04MSHHH-SCL-2025: Providing large equipment and technical repair equipment and services to regulate the system of H2-Song Tranh Hydroelectric Plant 2 package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN GIẢI PHÁP CÔNG NGHỆ VÀ NĂNG LƯỢNG KIÊN PHÁT. Eight other contractors also participated.
- Result: Tender opening completed
10/11/2025 09:08
KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY lost the bidding for the Bidding package No. 44: Testing after the energy of the H2 unit according to Circular 05/2025/TT-BCT package, which was invited for bidding by the SONG BA HA HYDRO POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
06/11/2025 09:37
KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY join for the Package No. 03: Procurement, installation and replacement system to regulate the H1 machine package, which was invited for bidding by the SONG BA HA HYDRO POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
05/11/2025 11:27
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY participated in 298 package, of which 126 package was won, failed 155 packages, 9 packages with no results, 8 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY is related to 66 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY competed with 288 contractors in 268 package, won 97 package, lost 152 package, 11 bidding package has no results, 8 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY once entered into a partnership with 27 contractors in 59 package, won bid 29 package, lost 25 package, 3 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY participated in bidding in 24 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KIEN PHAT ENERGY AND TECHNOLOGY SOLUTION JOINT STOCK COMPANY participated in bidding in 30 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor