Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:05 AM 06/05/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:34 AM 06/05/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors KINH BO COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 115 bidding packages, of which 72 were won, 28 were lost, 9 are pending results, and 6 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 60.95% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 93.34% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (37), Đồng Nai (15), Cần Thơ (10), Đồng Tháp (8), Vĩnh Long (6), Đà Nẵng (6), Khánh Hòa (5), An Giang (3), Cà Mau (2), Tây Ninh (2), Lâm Đồng (2), Quảng Trị (1), Lai Châu (1), Undefined (17)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (29), Bình Phước (11), Sóc Trăng (6), Đà Nẵng (6), Ninh Thuận (5), Tiền Giang (4), Bà Rịa - Vũng Tàu (4), Đồng Tháp (4), Đồng Nai (4), An Giang (2), Hậu Giang (2), Vĩnh Long (2), Trà Vinh (2), Bình Dương (2), Cần Thơ (2), Tây Ninh (2), Bình Thuận (2), Bến Tre (2), Kiên Giang (1), Cà Mau (1), Bạc Liêu (1), Quảng Trị (1), Lai Châu (1), Undefined (19)
- Has relationships with 50 Bid Solicitors
- Has competed against 50 contractors in 74 bidding packages, won 34 packages, lost 27 packages, 9 are pending results, and 4 were canceled.
- Has collaborated with 8 contractors in 4 bidding packages, won 3 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: CÔNG TY TNHH KINH BỐ
- Construction capacity certificate code: 00012864
- Issuing Authority: Sở KH&ĐT thành phố Hồ Chí Minh
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật Cấp thoát nước
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 3 | 4.2% |
| Lower by 10% to 20% | 8 | 11.1% |
| Lower by 5% to 10% | 8 | 11.1% |
| Lower by 1% to 5% | 12 | 16.7% |
| Lower by 0% to 1% | 35 | 48.6% |
| 0% | 3 | 4.2% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 1 | 1.4% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 2 | 2.8% |
| Unknown | 0 | 0% |
| Total | 72 | 100% |
KINH BO COMPANY LIMITED join for the Tender package No 44-2025: Equipping 2.2 ton trucks, 3 ton cranes and buckets for Power Companies - phase 1 package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
19/12/2025 14:01
KINH BO COMPANY LIMITED join for the Tender package No 45-2025: Equipping 2.2 ton trucks, 3 ton cranes and buckets for Power Companies - phase 2 package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
19/12/2025 14:01
KINH BO COMPANY LIMITED lost the bidding for the Package No. 12: Purchase 02 forklifts to work on high package, which was invited for bidding by the Công ty Điện lực Tiền Giang through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
19/07/2025 09:43
KINH BO COMPANY LIMITED join for the Package No. 12: Purchase 02 forklifts to work on high package, which was invited for bidding by the Công ty Điện lực Tiền Giang through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
23/06/2025 10:01
KINH BO COMPANY LIMITED Won the bidding for the Bidding package: large repair of Nissan Navara pickup trucks number plate 60C-428.29 package, which was invited for bidding by the CHI NHÁNH ĐIỆN LỰC BIÊN HÒA 2 - CÔNG TY TNHH MỘT THÀNH VIÊN ĐIỆN LỰC ĐỒNG NAI through an Open bidding as an independent entity.
- Result: Won
30/05/2025 10:41
KINH BO COMPANY LIMITED join for the Bidding package: large repair of Nissan Navara pickup trucks number plate 60C-428.29 package, which was invited for bidding by the CHI NHÁNH ĐIỆN LỰC BIÊN HÒA 2 - CÔNG TY TNHH MỘT THÀNH VIÊN ĐIỆN LỰC ĐỒNG NAI through an Open bidding as an independent entity.
- Result: Tender opening completed
21/05/2025 16:20
KINH BO COMPANY LIMITED lost the bidding for the Package 4: Procurement equipment for operation management, inspection and CBM work for electricity companies: Long An, Ben Tre, Soc Trang, Bac Lieu and Ca Mau package, which was invited for bidding by the southern power corporation through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
11/05/2025 15:08
KINH BO COMPANY LIMITED join for the Package 4: Procurement equipment for operation management, inspection and CBM work for electricity companies: Long An, Ben Tre, Soc Trang, Bac Lieu and Ca Mau package, which was invited for bidding by the southern power corporation through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Tender opening completed
23/04/2025 09:02
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder KINH BO COMPANY LIMITED participated in 115 package, of which 72 package was won, failed 28 packages, 9 packages with no results, 6 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KINH BO COMPANY LIMITED is related to 50 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KINH BO COMPANY LIMITED competed with 50 contractors in 74 package, won 34 package, lost 27 package, 9 bidding package has no results, 4 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor KINH BO COMPANY LIMITED once entered into a partnership with 8 contractors in 4 package, won bid 3 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor KINH BO COMPANY LIMITED participated in bidding in 13 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KINH BO COMPANY LIMITED participated in bidding in 23 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor