History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
6:08 PM 12/05/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
12:24 PM 12/08/2022 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) are as follows:
You need to Login or Sign up to view all informations.
- Participated in 190 bidding packages, of which 186 were won, 3 were lost, 1 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 68.81% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.37% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Sơn La (144), Lai Châu (3), Ninh Bình (1), Hà Nội (1), Undefined (41)
- Provinces before the merger where the contractor has participated in bidding : Sơn La (144), Lai Châu (3), Nam Định (1), Hà Nội (1), Undefined (41)
- Has relationships with 46 Bid Solicitors
- Has competed against 19 contractors in 20 bidding packages, won 17 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 18 contractors in 28 bidding packages, won 28 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 186 bidding packages with 26 roles.
- Building organization name: CÔNG TY CP TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG MAI LÂM
- Construction capacity certificate code: 00002323
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Sơn La
- Field:
⚬ Lập quy hoạch xây dựng: Lập thiết kế quy hoạch xây dựng
⚬ Khảo sát xây dựng: Khảo sát địa hình
⚬ Khảo sát xây dựng: Khảo sát địa chất công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình giao thông: Đường bộ; Cầu - Hầm
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình hạ tầng kỹ thuật: Cấp nước, thoát nước
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình phục vụ nông nghiệp và phát triển nông thôn (thủy lợi)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình nhà công nghiệp
⚬ Quản lý dự án đầu tư xây dựng: Tư vấn quản lý dự án đầu tư xây dựng công trình dân dụng và hạ tầng kỹ thuật
⚬ Quản lý dự án đầu tư xây dựng: Tư vấn quản lý dự án đầu tư xây dựng công trình giao thông
⚬ Quản lý dự án đầu tư xây dựng: Tư vấn quản lý dự án đầu tư xây dựng công trình phục vụ nông nghiệp và phát triển nông thôn
⚬ Giám sát công tác xây dựng công trình: Tư vấn giám sát công tác xây dựng công trình dân dụng
⚬ Giám sát công tác xây dựng công trình: Tư vấn giám sát công tác xây dựng công trình giao thông
⚬ Giám sát công tác xây dựng công trình: Tư vấn giám sát công tác xây dựng công trình hạ tầng kỹ thuật
⚬ Giám sát công tác xây dựng công trình: Tư vấn giám sát công tác xây dựng công trình phục vụ nông nghiệp và phát triển nông thôn
⚬ Giám sát công tác xây dựng công trình: Tư vấn giám sát công tác xây dựng công trình công nghiệp
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 0.5% |
| Lower by 10% to 20% | 7 | 3.8% |
| Lower by 5% to 10% | 10 | 5.4% |
| Lower by 1% to 5% | 11 | 5.9% |
| Lower by 0% to 1% | 66 | 35.5% |
| 0% | 88 | 47.3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 1 | 0.5% |
| Higher by 5% to 10% | 1 | 0.5% |
| Higher by 10% or more | 1 | 0.5% |
| Unknown | 0 | 0% |
| Total | 186 | 100% |
MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) Won the bidding for the Package No. 10: Consulting on construction supervision and equipment package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng công nghiệp và phát triển đô thị tỉnh Sơn La through an assign shorthand as an independent entity.
- Result: Won
31/12/2025 16:15
MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) Won the bidding for the Bidding package 09: Construction supervision consultancy and equipment package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng công nghiệp và phát triển đô thị tỉnh Sơn La through an assign shorthand as an independent entity.
- Result: Won
12/12/2025 16:39
MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) Won the bidding for the Package No. 03: Consulting on construction supervision and equipment installation package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng các công trình nông nghiệp và phát triển nông thôn tỉnh Sơn La through an assign shorthand as an independent entity.
- Result: Won
07/12/2025 20:57
MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) Won the bidding for the Package No. 03: Consulting on construction supervision and equipment installation package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng các công trình nông nghiệp và phát triển nông thôn tỉnh Sơn La through an assign shorthand as an independent entity.
- Result: Won
06/12/2025 21:25
MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) Won the bidding for the Survey, prepare economic and technical reports package, which was invited for bidding by the Phòng Kinh tế xã Chiềng Sung through an assign shorthand as an independent entity.
- Result: Won
05/12/2025 23:02
MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) Won the bidding for the Consulting, surveying, making economic - technical reports package, which was invited for bidding by the Phòng Kinh tế xã Mường Chiên through an assign shorthand as an independent entity.
- Result: Won
21/11/2025 11:49
MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) Won the bidding for the Consulting, surveying, making economic - technical reports package, which was invited for bidding by the Phòng kinh tế xã Mường Giôn through an assign shorthand as an independent entity.
- Result: Won
21/11/2025 10:14
MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) Won the bidding for the Consulting, surveying, making economic - technical reports package, which was invited for bidding by the Phòng kinh tế xã Mường Giôn through an assign shorthand as an independent entity.
- Result: Won
29/10/2025 10:13
MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) Won the bidding for the Consulting, surveying, making economic - technical reports package, which was invited for bidding by the Phòng kinh tế xã Mường Giôn through an assign shorthand as an independent entity.
- Result: Won
29/10/2025 10:10
MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) Won the bidding for the Consulting, surveying, making economic - technical reports package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng các công trình nông nghiệp và phát triển nông thôn tỉnh Sơn La through an assign shorthand as an independent entity.
- Result: Won
06/10/2025 09:34
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) participated in 190 package, of which 186 package was won, failed 3 packages, 1 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) is related to 46 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) competed with 19 contractors in 20 package, won 17 package, lost 3 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) once entered into a partnership with 18 contractors in 28 package, won bid 28 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) participated in bidding in 4 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MAI LAM CONSTRUCTION AND INVESTMEMT CONSULTING JONSTOCK COMPANY (MAI LAM . JSC) participated in bidding in 4 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor