Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:06 AM 08/06/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
3:09 PM 08/06/2024 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors NEXDATA TECHNOLOGY CORPORATION are as follows:
You need to Login or Sign up to view all informations.
- Participated in 95 bidding packages, of which 62 were won, 28 were lost, 3 are pending results, and 2 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 39% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100.4% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (38), Hải Phòng (6), Phú Thọ (5), Lạng Sơn (2), Ninh Bình (2), Bắc Ninh (2), Hà Tĩnh (2), Quảng Trị (2), TP.Hồ Chí Minh (2), Đà Nẵng (1), Cần Thơ (1), Lai Châu (1), Điện Biên (1), Lào Cai (1), Undefined (29)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (38), Hải Phòng (3), Vĩnh Phúc (3), Lạng Sơn (2), Bắc Giang (2), Hà Tĩnh (2), Hải Dương (2), TP.Hồ Chí Minh (2), Đà Nẵng (1), Nam Định (1), Cần Thơ (1), Ninh Bình (1), Lai Châu (1), Quảng Trị (1), Điện Biên (1), Lào Cai (1), Phú Thọ (1), Hòa Bình (1), Quảng Bình (1), Undefined (31)
- Has relationships with 55 Bid Solicitors
- Has competed against 56 contractors in 48 bidding packages, won 18 packages, lost 25 packages, 4 are pending results, and 1 were canceled.
- Has collaborated with 8 contractors in 10 bidding packages, won 8 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 6 bidding packages with 6 roles.
- Published contractor selection plan of 0 project with a total of 0 of bidding packages.
- Invitation to bid 0 package (with 0 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 0 packages announced, canceled bids 0 packages (among the packages above).
- There are 0 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors NEXDATA TECHNOLOGY CORPORATION are as follows:
- As the investor of 0 investment and development projects.
- As the investor of 0 Contractor Selection Plan, including 0 self-published Contractor Selection Plan, 0 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 0 bidding package in which the package is self-inviting 0, with 0 the package is owned by the unit. other bidding.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 2 | 3.2% |
| Lower by 10% to 20% | 1 | 1.6% |
| Lower by 5% to 10% | 4 | 6.5% |
| Lower by 1% to 5% | 26 | 41.9% |
| Lower by 0% to 1% | 15 | 24.2% |
| 0% | 12 | 19.4% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 2 | 3.2% |
| Unknown | 0 | 0% |
| Total | 62 | 100% |
NEXDATA TECHNOLOGY CORPORATION lost the bidding for the Technical support license extension for source code vulnerability scanning software package, which was invited for bidding by the through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Lost
24/12/2025 09:54
NEXDATA TECHNOLOGY CORPORATION join for the Technical support license extension for source code vulnerability scanning software package, which was invited for bidding by the through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Tender opening completed
08/12/2025 10:10
NEXDATA TECHNOLOGY CORPORATION Won the bidding for the Maintenance of equipment of the information system at the State Bank of Region 6 Branch package, which was invited for bidding by the NGÂN HÀNG NHÀ NƯỚC CHI NHÁNH KHU VỰC 6 through an assign shorthand as an independent entity.
- Result: Won
23/07/2025 09:40
NEXDATA TECHNOLOGY CORPORATION Won the bidding for the Shopping and installation of surveillance cameras at the Department of Emergency and the Department of Bacterial Infection Control package, which was invited for bidding by the Duc Giang General Hospital through an assign shorthand as an independent entity.
- Result: Won
19/05/2025 16:36
NEXDATA TECHNOLOGY CORPORATION Won the bidding for the Consultancy on preparation and evaluation of tender documents package, which was invited for bidding by the Bệnh Viện Quân Y 105 through an assign shorthand as an independent entity.
- Result: Won
17/12/2024 15:57
NEXDATA TECHNOLOGY CORPORATION Won the bidding for the Server room relocation service of SBV Quang Binh province branch package, which was invited for bidding by the Ngân hàng Nhà nước Chi nhánh tỉnh Quảng Bình through an assign shorthand as an independent entity.
- Result: Won
20/11/2024 10:10
NEXDATA TECHNOLOGY CORPORATION lost the bidding for the Additional storage resources for Primary Data Center and Backup Data Center package, which was invited for bidding by the Informatics Technology Department of The Bank through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
23/10/2024 14:58
NEXDATA TECHNOLOGY CORPORATION lost the bidding for the Package No. 03: Building a digital communication platform between the Government, people and businesses package, which was invited for bidding by the Sở Thông tin và Truyền thông tỉnh Bắc Giang through an Competitive Offer as master consortium of CÔNG TY CỔ PHẦN CÔNG NGHỆ NEXDATA . Two other contractors also participated.
- Result: Lost
22/10/2024 09:17
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder NEXDATA TECHNOLOGY CORPORATION participated in 95 package, of which 62 package was won, failed 28 packages, 3 packages with no results, 2 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NEXDATA TECHNOLOGY CORPORATION is related to 55 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NEXDATA TECHNOLOGY CORPORATION competed with 56 contractors in 48 package, won 18 package, lost 25 package, 4 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor NEXDATA TECHNOLOGY CORPORATION once entered into a partnership with 8 contractors in 10 package, won bid 8 package, lost 2 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor NEXDATA TECHNOLOGY CORPORATION participated in bidding in 14 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NEXDATA TECHNOLOGY CORPORATION participated in bidding in 19 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor