Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 76 bidding packages, of which 75 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 32.4% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 83.78% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hải Phòng (12), Đà Nẵng (7), Cao Bằng (7), Hà Nội (7), Bắc Ninh (6), Đồng Nai (3), Lâm Đồng (2), Hưng Yên (2), Phú Thọ (2), Lào Cai (1), Tuyên Quang (1), Hà Tĩnh (1), Cà Mau (1), Thái Nguyên (1), Cần Thơ (1), Ninh Bình (1), Undefined (23)
- Provinces before the merger where the contractor has participated in bidding : Hải Phòng (8), Đà Nẵng (7), Cao Bằng (7), Hà Nội (7), Hải Dương (3), Đồng Nai (3), Bắc Giang (3), Bắc Ninh (3), Lâm Đồng (2), Yên Bái (1), Hưng Yên (1), Hà Giang (1), Hà Tĩnh (1), Cà Mau (1), Bắc Kạn (1), Hòa Bình (1), Sóc Trăng (1), Phú Thọ (1), Undefined (26)
- Has relationships with 44 Bid Solicitors
- Has competed against 1 contractors in 2 bidding packages, won 1 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 166 bidding packages with 16 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 4 | 5.3% |
| Lower by 10% to 20% | 9 | 12% |
| Lower by 5% to 10% | 9 | 12% |
| Lower by 1% to 5% | 8 | 10.7% |
| Lower by 0% to 1% | 2 | 2.7% |
| 0% | 43 | 57.3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 75 | 100% |
ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY Won the bidding for the Package 02: Valuation consultancy package, which was invited for bidding by the Văn phòng Bộ Nội vụ through an assign shorthand as an independent entity.
- Result: Won
12/01/2026 14:53
ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY Won the bidding for the Bidding package No. 1: Equipment valuation package, which was invited for bidding by the TRUNG TÂM PHỤC VỤ HÀNH CHÍNH CÔNG XÃ LIÊM HÀ through an assign shorthand as an independent entity.
- Result: Won
24/12/2025 15:21
ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY Won the bidding for the Bidding package: Consulting on asset valuation of criminal cases that need to be done urgently at the request of the Police Investigation Agency - Hung Yen Provincial Police. package, which was invited for bidding by the Sở Tài chính tỉnh Hưng Yên through an as an independent entity.
- Result: Won
21/12/2025 15:14
ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY Won the bidding for the Valuation of "Leasing the transmission and broadcasting service of Tuyen Quang TV channel (TTV) with HD standard nationwide, on digital terrestrial television infrastructure DVB-T2, rental period of 12 months (from January 1, 2026 to December 31, 2026) package, which was invited for bidding by the BÁO VÀ PHÁT THANH TRUYỀN HÌNH TỈNH TUYÊN QUANG through an assign shorthand as an independent entity.
- Result: Won
19/12/2025 13:14
ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY Won the bidding for the TV03: Appraisal of equipment prices package, which was invited for bidding by the Bệnh viện Tai Mũi Họng TW through an assign shorthand as an independent entity.
- Result: Won
15/12/2025 15:04
ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY Won the bidding for the Hire the service of appraising the asset value of some medical equipment at Hai Duong General Hospital package, which was invited for bidding by the Bệnh viện Đa khoa Hải Dương through an assign shorthand as an independent entity.
- Result: Won
27/11/2025 10:11
ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY Won the bidding for the Bidding Package No. 03 - Appraisal Consulting
Project price: Procurement and installation of outdoor sports equipment at
villages in the commune package, which was invited for bidding by the Phòng Văn hóa - xã hội xã Đường An through an assign shorthand as an independent entity.
- Result: Won
11/11/2025 17:35
ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY Won the bidding for the Bidding package No. 03 – Price appraisal consulting package, which was invited for bidding by the Phòng Văn hóa - xã hội xã Đường An through an assign shorthand as an independent entity.
- Result: Won
05/11/2025 08:23
ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY Won the bidding for the Package No. 04: Valuation consultancy package, which was invited for bidding by the Trung tâm cung ứng dịch vụ sự nghiệp công xã Đông Phú through an assign shorthand as an independent entity.
- Result: Won
03/11/2025 14:08
ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY Won the bidding for the Bidding package 01: Quality assessment of recovered materials package, which was invited for bidding by the SỞ XÂY DỰNG THÀNH PHỐ HẢI PHÒNG through an assign shorthand as an independent entity.
- Result: Won
18/10/2025 16:15
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY participated in 76 package, of which 75 package was won, failed 1 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY is related to 44 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY competed with 1 contractors in 2 package, won 1 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY participated in bidding in 16 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ORIENTAL VALUATION AND INSPECTION JOINT STOCK COMPANY participated in bidding in 18 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor