Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:33 PM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
8:53 AM 04/03/2023 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 18 bidding packages, of which 12 were won, 5 were lost, 1 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 43.75% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 78.7% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Vĩnh Long (7), TP.Hồ Chí Minh (4), Thanh Hoá (1), Quảng Trị (1), Phú Thọ (1), Đồng Tháp (1), Khánh Hòa (1), Nationwide (1), Cà Mau (1)
- Provinces before the merger where the contractor has participated in bidding : Trà Vinh (5), Bà Rịa - Vũng Tàu (4), Thanh Hoá (1), Quảng Bình (1), Phú Thọ (1), TP.Hồ Chí Minh (1), Đồng Tháp (1), Khánh Hòa (1), Vĩnh Long (1), Cà Mau (1), Undefined (2)
- Has relationships with 12 Bid Solicitors
- Has competed against 29 contractors in 15 bidding packages, won 9 packages, lost 5 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 10 contractors in 7 bidding packages, won 6 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 10 bidding packages with 5 roles.
- Building organization name: CÔNG TY TNHH MỘT THÀNH VIÊN PHÚ MỸ
- Construction capacity certificate code: 00055703
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Kiên Giang
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông (đường thủy nội địa, hàng hải)
⚬ Thi công xây dựng công trình: Giao thông (đường thủy nội địa, hàng hải)
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 6 | 50% |
| Lower by 10% to 20% | 0 | 0% |
| Lower by 5% to 10% | 2 | 16.7% |
| Lower by 1% to 5% | 2 | 16.7% |
| Lower by 0% to 1% | 1 | 8.3% |
| 0% | 1 | 8.3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 12 | 100% |
PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY join for the 02TV-SCL.NV-2026: Survey consulting to determine the volume before and after carrying out dredging and maintenance of Coastal Power Center Seaport in 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
06/01/2026 14:05
PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY Won the bidding for the Package 3 "Design, procurement and construction (EPC)" package, which was invited for bidding by the BRANCH OF PETROVIETNAM CAMAU FERTILIZER JOINT STOCK COMPANY - PROJECT MANAGEMENT BOARD through an Open bidding as sub-joint of Liên danh Ivy Build - Gói thầu số 3.
- Result: Won
26/12/2025 15:09
PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY Won the bidding for the KSTBL-MN02: Periodic survey of the Southern National Mop Development Stream in 2025 package, which was invited for bidding by the VIETNAM MARITIME AND WATERWAY ADMINISTRATION through an Open bidding as sub-joint of LIÊN DANH KHẢO SÁT MIỀN NAM 02. Five other contractors also participated.
- Result: Won
05/11/2025 13:53
PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY Won the bidding for the 03TV-SXKD-2026: Consulting on technical plan and estimation of dredging of Duyen Hai Power Center in 2026 package, which was invited for bidding by the DUYEN HAI THERMAL POWER COMPANY through an assign shorthand as an independent entity.
- Result: Won
03/11/2025 14:46
PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY join for the KSTBL-MN02: Periodic survey of the Southern National Mop Development Stream in 2025 package, which was invited for bidding by the VIETNAM MARITIME AND WATERWAY ADMINISTRATION through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG CÔNG TRÌNH PHÚ MỸ. Five other contractors also participated.
- Result: Tender opening completed
11/10/2025 10:02
PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY Won the bidding for the Package No. 5: Survey consultancy for BGMB package, which was invited for bidding by the Vietnam Maritime and Waterway Administration through an assign shorthand as an independent entity.
- Result: Won
30/09/2025 16:03
PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY lost the bidding for the Package No. 03TV-SCL-2025: Survey consulting to determine the volume before and after carrying out the dredging and maintenance work of the Seaport and Cooling Water Receiving Channel of Duyen Hai Power Center phase 1 of 2025 package, which was invited for bidding by the THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 through an Open bidding as an independent entity. Eight other contractors also participated.
- Result: Lost
21/03/2025 15:37
PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY Won the bidding for the MK-F/S: Consulting on surveys, preparing pre-feasibility study reports package, which was invited for bidding by the Project Management Unit of Waterways through an Open bidding as sub-joint of Liên danh Công ty Cổ phần Tư vấn Thiết kế Giao thông Vận tải phía Nam và Công ty Cổ phần tư vấn xây dựng công trình Phú Mỹ (Viết tắt là: Liên danh TEDI SOUTH – PHU MY);. One other contractors also participated.
- Result: Won
07/03/2025 14:45
PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY Won the bidding for the “Hire a consultant to design construction drawings and prepare a total estimate for the major repair project of wharfs No. 5 and No. 6 of Vietsovpetro port to receive 10,000DWT ships” - DV-3285/24-PXD1-DA-NTK ( Phone: (0254) 3 839 871 – 22.93, Contact person: Nguyen Trung Kien) package, which was invited for bidding by the Vietsovpetro Joint Venture through an Open bidding as master consortium of Liên danh PhumyJSC-Wacose. Two other contractors also participated.
- Result: Won
25/02/2025 16:18
PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY join for the MK-F/S: Consulting on surveys, preparing pre-feasibility study reports package, which was invited for bidding by the Project Management Unit of Waterways through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG CÔNG TRÌNH PHÚ MỸ. One other contractors also participated.
- Result: Tender opening completed
21/02/2025 11:31
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY participated in 18 package, of which 12 package was won, failed 5 packages, 1 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY is related to 12 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY competed with 29 contractors in 15 package, won 9 package, lost 5 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY once entered into a partnership with 10 contractors in 7 package, won bid 6 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY participated in bidding in 8 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor PHU MY CONSULTANT CONSTRUCTION WORK JOINT STOCK COMPANY participated in bidding in 10 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor