Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors PHU THANH LONG SERVICES-TRADING COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 20 bidding packages, of which 10 were won, 8 were lost, 0 are pending results, and 2 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 76.24% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.88% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (11), Lâm Đồng (4), Hà Nội (2), Đồng Nai (1), Hải Phòng (1), Điện Biên (1), Nghệ An (1), Quảng Trị (1), Thanh Hoá (1), Đà Nẵng (1), Huế (1), Gia Lai (1), Đắk Lắk (1), An Giang (1), Cà Mau (1), Cần Thơ (1), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (7), Bà Rịa - Vũng Tàu (3), Bình Thuận (3), Hà Nội (2), Đồng Nai (1), Hải Phòng (1), Điện Biên (1), Nghệ An (1), Quảng Bình (1), Thanh Hoá (1), Đà Nẵng (1), Huế (1), Quảng Nam (1), Bình Định (1), Gia Lai (1), Phú Yên (1), Đắk Lắk (1), Lâm Đồng (1), Kiên Giang (1), Cà Mau (1), Cần Thơ (1), Undefined (5)
- Has relationships with 17 Bid Solicitors
- Has competed against 65 contractors in 13 bidding packages, won 3 packages, lost 8 packages, 0 are pending results, and 2 were canceled.
- Has collaborated with 15 contractors in 9 bidding packages, won 4 packages, lost 4 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 10% |
| Lower by 10% to 20% | 1 | 10% |
| Lower by 5% to 10% | 1 | 10% |
| Lower by 1% to 5% | 2 | 20% |
| Lower by 0% to 1% | 5 | 50% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 10 | 100% |
PHU THANH LONG SERVICES-TRADING COMPANY LIMITED Won the bidding for the Providing materials and equipment and constructing works to renovate the fire protection system at AACC HCM package, which was invited for bidding by the CÔNG TY QUẢN LÝ BAY MIỀN NAM –CHI NHÁNH TỔNG CÔNG TY QUẢN LÝ BAY VIỆT NAM-CÔNG TY TNHH through an Open bidding as an independent entity.
- Result: Won
11/12/2025 16:06
PHU THANH LONG SERVICES-TRADING COMPANY LIMITED join for the Providing materials and equipment and constructing works to renovate the fire protection system at AACC HCM package, which was invited for bidding by the SOUTHERN REGION AIR TRAFFIC SERVICES COMPANY - VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION - COMPANY LIMITED through an Open bidding as an independent entity.
- Result: Tender opening completed
18/11/2025 09:09
PHU THANH LONG SERVICES-TRADING COMPANY LIMITED Won the bidding for the Supply, install materials, equipment and construction package, which was invited for bidding by the SOUTHERN REGION AIR TRAFFIC SERVICES COMPANY - VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION - COMPANY LIMITED through an Open bidding as an independent entity.
- Result: Won
14/11/2025 09:10
PHU THANH LONG SERVICES-TRADING COMPANY LIMITED Won the bidding for the Package 8:
Road system; Small stone bridge; Lake; Lotus lake planting; FPF system and lightning protection in the whole area; Sao Hill package, which was invited for bidding by the Historic Relics & Cu Chi Tunnel Complex through an Open bidding as sub-joint of Liên danh Hoàng Giang – Phú Thanh Long. One other contractors also participated.
- Result: Won
05/11/2025 15:44
PHU THANH LONG SERVICES-TRADING COMPANY LIMITED join for the Package 8:
Road system; Small stone bridge; Lake; Lotus lake planting; FPF system and lightning protection in the whole area; Sao Hill package, which was invited for bidding by the Historic Relics & Cu Chi Tunnel Complex through an Open bidding as sub-joint of CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ PHÚ THANH LONG. One other contractors also participated.
- Result: Tender opening completed
17/10/2025 09:44
PHU THANH LONG SERVICES-TRADING COMPANY LIMITED join for the Supply, install materials, equipment and construction package, which was invited for bidding by the SOUTHERN REGION AIR TRAFFIC SERVICES COMPANY - VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION - COMPANY LIMITED through an Open bidding as an independent entity.
- Result: Tender opening completed
10/10/2025 10:11
PHU THANH LONG SERVICES-TRADING COMPANY LIMITED lost the bidding for the Maintenance of fire protection system at AACC and Tan Son Nhat airport area of Southern Flight Management Company package, which was invited for bidding by the SOUTHERN REGION AIR TRAFFIC SERVICES COMPANY - VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION - COMPANY LIMITED through an Competitive Offer as an independent entity. Three other contractors also participated.
- Result: Lost
07/07/2025 16:05
PHU THANH LONG SERVICES-TRADING COMPANY LIMITED join for the Maintenance of fire protection system at AACC and Tan Son Nhat airport area of Southern Flight Management Company package, which was invited for bidding by the SOUTHERN REGION AIR TRAFFIC SERVICES COMPANY - VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION - COMPANY LIMITED through an Competitive Offer as an independent entity. Three other contractors also participated.
- Result: Tender opening completed
29/04/2025 10:34
PHU THANH LONG SERVICES-TRADING COMPANY LIMITED lost the bidding for the Buy clothes and essential household items for the target package, which was invited for bidding by the TRUNG TÂM ĐIỀU DƯỠNG NGƯỜI BỆNH TÂM THẦN through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
19/02/2025 17:47
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder PHU THANH LONG SERVICES-TRADING COMPANY LIMITED participated in 20 package, of which 10 package was won, failed 8 packages, 0 packages with no results, 2 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor PHU THANH LONG SERVICES-TRADING COMPANY LIMITED is related to 17 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor PHU THANH LONG SERVICES-TRADING COMPANY LIMITED competed with 65 contractors in 13 package, won 3 package, lost 8 package, 0 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor PHU THANH LONG SERVICES-TRADING COMPANY LIMITED once entered into a partnership with 15 contractors in 9 package, won bid 4 package, lost 4 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor PHU THANH LONG SERVICES-TRADING COMPANY LIMITED participated in bidding in 16 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor PHU THANH LONG SERVICES-TRADING COMPANY LIMITED participated in bidding in 21 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,725 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor