Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
5:37 PM 09/17/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
4:49 PM 10/03/2022 |
Active |
At the request of QTHT |
|
1:06 AM 11/25/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
9:30 AM 11/25/2022 |
Active |
At the request of QTHT |
|
10:24 PM 12/31/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
9:06 AM 01/03/2023 |
Active |
At the request of QTHT |
|
11:31 PM 03/30/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:43 AM 04/01/2024 |
Active |
At the request of QTHT |
|
12:05 AM 05/05/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
11:20 AM 05/06/2024 |
Active |
At the request of QTHT |
|
12:05 AM 07/06/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
10:58 AM 07/08/2024 |
Active |
At the request of QTHT |
|
12:05 AM 08/26/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:30 AM 08/26/2024 |
Active |
At the request of QTHT |
|
12:05 AM 03/04/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
3:22 PM 03/04/2025 |
Active |
At the request of QTHT |
|
12:05 AM 09/19/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
3:31 PM 09/19/2025 |
Active |
At the request of QTHT |
|
12:05 AM 11/09/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:26 AM 11/09/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 are as follows:
You need to Login or Sign up to view all informations.
- Participated in 271 bidding packages, of which 237 were won, 28 were lost, 5 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 8% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 102.27% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (44), Đồng Tháp (40), Hà Nội (27), Đồng Nai (19), Đà Nẵng (18), Lâm Đồng (9), Tây Ninh (9), Cần Thơ (8), Khánh Hòa (6), Gia Lai (6), Vĩnh Long (5), Đắk Lắk (4), Phú Thọ (4), Ninh Bình (4), Quảng Ngãi (4), Nghệ An (4), An Giang (3), Huế (3), Nationwide (3), Quảng Ninh (3), Lai Châu (3), Tuyên Quang (2), Quảng Trị (2), Thanh Hoá (2), Cà Mau (1), Sơn La (1), Lào Cai (1), Điện Biên (1), Undefined (57)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (34), Hà Nội (27), Tiền Giang (17), Đồng Nai (13), Đà Nẵng (12), Hậu Giang (6), Bà Rịa - Vũng Tàu (5), Khánh Hòa (5), Quảng Nam (5), Gia Lai (4), Đồng Tháp (4), Bình Thuận (4), Nghệ An (4), Bình Phước (3), Huế (3), Long An (3), Đắk Lắk (3), Nationwide (3), Quảng Ninh (3), Lai Châu (3), Bến Tre (3), Lâm Đồng (2), Ninh Thuận (2), An Giang (2), Cần Thơ (2), Đắk Nông (2), Hòa Bình (2), Tuyên Quang (2), Nam Định (2), Thanh Hoá (2), Kiên Giang (1), Cà Mau (1), Sơn La (1), Ninh Bình (1), Phú Thọ (1), Kon Tum (1), Bình Định (1), Yên Bái (1), Quảng Ngãi (1), Trà Vinh (1), Quảng Trị (1), Tây Ninh (1), Điện Biên (1), Undefined (97)
- Has relationships with 67 Bid Solicitors
- Has competed against 63 contractors in 62 bidding packages, won 30 packages, lost 27 packages, 5 are pending results, and 0 were canceled.
- Has collaborated with 14 contractors in 21 bidding packages, won 18 packages, lost 2 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 357 bidding packages with 51 roles.
- Building organization name: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 5
- Construction capacity certificate code: 00011671
- Issuing Authority: Sở Kế hoạch và Đầu tư TP. Hồ Chí Minh
- Field:
⚬ Khảo sát xây dựng: Địa hình, địa chất công trình
⚬ Giám sát thi công xây dựng công trình: Công nghiệp (Đường dây và trạm biến áp)
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 19 | 8% |
| Lower by 10% to 20% | 64 | 27% |
| Lower by 5% to 10% | 96 | 40.5% |
| Lower by 1% to 5% | 34 | 14.3% |
| Lower by 0% to 1% | 8 | 3.4% |
| 0% | 7 | 3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 2 | 0.8% |
| Higher by 10% or more | 7 | 3% |
| Unknown | 0 | 0% |
| Total | 237 | 100% |
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 Won the bidding for the Package NPCBA1.ĐVPL.220kV.G03: Survey supervision, verification of construction investment feasibility study report, verification of technical design, construction design and construction design package, which was invited for bidding by the Ban Quản lý dự án Lưới điện - Tổng công ty Điện lực miền Bắc through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
10/01/2026 09:03
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 Won the bidding for the Package 02-MHN: Survey supervision package, which was invited for bidding by the TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH through an assign shorthand as an independent entity.
- Result: Won
09/01/2026 08:27
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 Won the bidding for the Package 03-MHN: Verification of feasibility study report, construction drawing design - estimate package, which was invited for bidding by the TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH through an assign shorthand as an independent entity.
- Result: Won
09/01/2026 08:24
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 Won the bidding for the Package 03: Consultancy and verification of construction drawing design and cost estimate package, which was invited for bidding by the TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT through an assign shorthand as an independent entity.
- Result: Won
08/01/2026 09:01
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 Won the bidding for the Package 02-CDGC: Survey supervision package, which was invited for bidding by the TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH through an assign shorthand as an independent entity.
- Result: Won
06/01/2026 16:16
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 Won the bidding for the Package 03-CDGC: Consulting on verification of feasibility study report, construction drawing design - estimate package, which was invited for bidding by the TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH through an assign shorthand as an independent entity.
- Result: Won
06/01/2026 16:10
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 join for the Bidding package No. 3: Providing consulting services for preparing construction drawing designs and bidding documents package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 5. One other contractors also participated.
05/01/2026 14:18
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 Won the bidding for the Package 3/SCL2026/PTC3: CONSTRUCTION CONSULTING CONSULTING CONSTRUCTION, MAKE OF KTKT KT and Estimation of Repairing System of Cable Trit's Cable Station 220KV Krong Buk package, which was invited for bidding by the Công ty Truyền tải điện 3 through an Open bidding as an independent entity.
- Result: Won
31/12/2025 10:18
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 join for the Package 2: Consulting on supervision of construction survey and verification of feasibility study report on construction investment, technical design - estimates package, which was invited for bidding by the through an Open bidding as an independent entity.
29/12/2025 09:14
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 join for the Package NPCBA1.ĐVPL.220kV.G03: Survey supervision, verification of construction investment feasibility study report, verification of technical design, construction design and construction design package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
20/12/2025 09:04
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 participated in 271 package, of which 237 package was won, failed 28 packages, 5 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 is related to 67 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 competed with 63 contractors in 62 package, won 30 package, lost 27 package, 5 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 once entered into a partnership with 14 contractors in 21 package, won bid 18 package, lost 2 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 participated in bidding in 27 provinces/cities, 3 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5 participated in bidding in 42 provinces/cities, 3 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor