| Updated time | Active status | Lý do |
|---|---|---|
|
12:09 AM 12/20/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
1:47 PM 12/20/2022 |
Active |
At the request of QTHT |
|
11:30 PM 02/22/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
10:25 AM 02/23/2024 |
Active |
At the request of QTHT |
|
12:05 AM 05/14/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
4:20 PM 05/15/2024 |
Active |
At the request of QTHT |
|
12:05 AM 08/26/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
2:53 PM 08/26/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 67 bidding packages, of which 56 were won, 9 were lost, 2 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 37.36% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 89.63% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Ninh (37), Hà Nội (1), Undefined (29)
- Provinces before the merger where the contractor has participated in bidding : Quảng Ninh (37), Hà Nội (1), Undefined (33)
- Has relationships with 20 Bid Solicitors
- Has competed against 22 contractors in 19 bidding packages, won 9 packages, lost 8 packages, 2 are pending results, and 0 were canceled.
- Has collaborated with 23 contractors in 24 bidding packages, won 21 packages, lost 2 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: Công ty cổ phần Cây xanh công viên Quảng Ninh
- Construction capacity certificate code: 00011558
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Quảng Ninh
- Field:
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Nhà công nghiệp
⚬ Thi công xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Thi công xây dựng công trình: Nông nghiệp và phát triển nông thôn
⚬ Thi công lắp đặt thiết bị vào công trình:
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 6 | 10.7% |
| Lower by 10% to 20% | 7 | 12.5% |
| Lower by 5% to 10% | 4 | 7.1% |
| Lower by 1% to 5% | 21 | 37.5% |
| Lower by 0% to 1% | 11 | 19.6% |
| 0% | 3 | 5.4% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 3 | 5.4% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 1 | 1.8% |
| Unknown | 0 | 0% |
| Total | 56 | 100% |
QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY join for the Tender package No 03- Maintaining and caring for urban trees and cutting weeds package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN CÂY XANH CÔNG VIÊN QUẢNG NINH. Two other contractors also participated.
10/01/2026 09:05
QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY Won the bidding for the Package No. 01: Planting replacement trees at sidewalk flower beds, Party Committee headquarters and in front of cultural houses in area 3, Bai Chay ward package, which was invited for bidding by the Trung tâm cung ứng dịch vụ phường Bãi Cháy through an assign shorthand as an independent entity.
- Result: Won
06/01/2026 10:28
QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY Won the bidding for the Package No. 01: Planting replacement and additional flower trees on Marine Avenue garden and planting seasonal flowers on 18 date palm trees on Ha Long road package, which was invited for bidding by the Trung tâm cung ứng dịch vụ phường Bãi Cháy through an assign shorthand as an independent entity.
- Result: Won
06/01/2026 10:26
QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY Won the bidding for the Package No. 02: Renovating tree beds, planting additional seasonal flower beds package, which was invited for bidding by the Trung tâm cung ứng dịch vụ phường Hạ Long through an assign shorthand as an independent entity.
- Result: Won
27/12/2025 22:00
QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY Won the bidding for the Contract package: Pruning, height control, cutting down pestilent trees and unsafe trees before the rainy and stormy season in Hong Gai ward in 2025 package, which was invited for bidding by the Trung tâm cung ứng dịch vụ phường Hồng Gai through an assign shorthand as an independent entity.
- Result: Won
26/12/2025 14:33
QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY lost the bidding for the Package No. 7: Planting green plants on the face 56 package, which was invited for bidding by the VINACOMIN - MAO KHE COAL COMPANY through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
18/12/2025 12:02
QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY Won the bidding for the Package No. 2: Providing decorative plants and flowers outside the lobby of Quang Ninh Provincial Conference Center to serve the 13th Vietnam Fatherland Front Congress of Quang Ninh province, term 2025-2030. package, which was invited for bidding by the ỦY BAN MẶT TRẬN TỔ QUỐC TỈNH QUẢNG NINH through an assign shorthand as an independent entity.
- Result: Won
23/11/2025 14:01
QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY Won the bidding for the Package No. 01 package, which was invited for bidding by the Trung tâm cung ứng dịch vụ phường Hà Lầm through an assign shorthand as an independent entity.
- Result: Won
06/11/2025 10:30
QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY join for the Package No. 7: Planting green plants on the face 56 package, which was invited for bidding by the VINACOMIN - MAO KHE COAL COMPANY through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Tender opening completed
16/10/2025 09:16
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY participated in 67 package, of which 56 package was won, failed 9 packages, 2 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY is related to 20 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY competed with 22 contractors in 19 package, won 9 package, lost 8 package, 2 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY once entered into a partnership with 23 contractors in 24 package, won bid 21 package, lost 2 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor QUANG NINH PARK CONSTRUCTION JOIT STOCKCOMPANY participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor