Data analysis results of DauThau.info software for contractors SAI GON BAN MAI COMMERCIAL COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 220 bidding packages, of which 145 were won, 62 were lost, 8 are pending results, and 5 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 74.43% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.95% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Gia Lai (21), Bình Định (14), Bình Thuận (14), Lâm Đồng (13), Tuyên Quang (7), Quảng Nam (7), Bà Rịa - Vũng Tàu (6), Hải Dương (6), Hải Phòng (6), Kon Tum (6), Ninh Bình (5), Yên Bái (5), Trà Vinh (5), Quảng Ninh (5), Lai Châu (4), Thái Bình (4), Bình Phước (3), Thanh Hoá (3), Hà Nội (3), Phú Yên (3), Đồng Nai (3), Sơn La (2), Ninh Thuận (2), Đà Nẵng (2), Đắk Nông (2), Đắk Lắk (2), Cần Thơ (1), Undefined (66)
- Has relationships with 64 Bid Solicitors
- Has competed against 94 contractors in 132 bidding packages, won 60 packages, lost 61 packages, 7 are pending results, and 4 were canceled.
- Has collaborated with 5 contractors in 12 bidding packages, won 7 packages, lost 4 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 4 | 2.8% |
Lower by 10% to 20% | 9 | 6.2% |
Lower by 5% to 10% | 32 | 22.1% |
Lower by 1% to 5% | 52 | 35.9% |
Lower by 0% to 1% | 45 | 31% |
0% | 0 | 0% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 1 | 0.7% |
Higher by 10% or more | 2 | 1.4% |
Unknown | 0 | 0% |
Total | 145 | 100% |
SAI GON BAN MAI COMMERCIAL COMPANY LIMITED Won the bidding for the Equipped with a temperature monitoring system for excitation transformers at Se San 3 and Pleikrong power plant units package, which was invited for bidding by the CÔNG TY THUỶ ĐIỆN IA LY (CHI NHÁNH THUỘC TẬP ĐOÀN ĐIỆN LỰC VIỆT NAM) through an Open bidding as an independent entity.
- Result: Won
19/09/2024 13:14
SAI GON BAN MAI COMMERCIAL COMPANY LIMITED Won the bidding for the Package No. 10: Providing technical services for testing the excitation system and speed regulation system for the overhaul of unit S1 of Mong Duong 1 Thermal Power Plant package, which was invited for bidding by the EVNGENCO 3 POWER SERVICE COMPANY through an Competitive Offer as an independent entity.
- Result: Won
30/07/2024 09:47
SAI GON BAN MAI COMMERCIAL COMPANY LIMITED Won the bidding for the TKT-DTPT-01-2024 Supply, install, test, calibrate the excitation system of Unit H1 - Thuong Kon Tum Hydropower Plant package, which was invited for bidding by the THUONG KON TUM HYDRO POWER COMPANY - VINH SON - SONG HINH HYDRO POWER JOINT STOCK COMPANY BRANCH through an Open bidding as an independent entity.
- Result: Won
25/07/2024 16:31
SAI GON BAN MAI COMMERCIAL COMPANY LIMITED lost the bidding for the Supplying materials and equipment for Vinh Son - Song Hinh Factory package, which was invited for bidding by the VINH SON SONG HINH HYDRO POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. Nine other contractors also participated.
- Result: Lost
24/07/2024 13:59
SAI GON BAN MAI COMMERCIAL COMPANY LIMITED lost the bidding for the Outsourced major repair of the Excitation System of Ban Chat Hydropower Plant in 2024 package, which was invited for bidding by the EVN HPC HQBC through an Open bidding as an independent entity. Five other contractors also participated.
- Result: Lost
04/07/2024 08:59
SAI GON BAN MAI COMMERCIAL COMPANY LIMITED Won the bidding for the Calibration experiment after SCL in 2024 (including speed regulation and excitation experiment of unit 2) package, which was invited for bidding by the HAI PHONG THERMAL POWER JOINT STOCK COMPANY through an Open bidding as master consortium of CÔNG TY TNHH THƯƠNG MẠI SÀI GÒN BAN MAI.
- Result: Won
21/06/2024 08:05
SAI GON BAN MAI COMMERCIAL COMPANY LIMITED Won the bidding for the Package No. 15MSHH-SXKD-2024: Supply of position controller for speed governor system package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY PHÁT ĐIỆN 1 - CÔNG TY THỦY ĐIỆN ĐẠI NINH through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Won
10/05/2024 23:42
SAI GON BAN MAI COMMERCIAL COMPANY LIMITED join for the Supply of materials, equipment and services to replace the speed control system of unit H2 of Sesan 3A hydropower plant package, which was invited for bidding by the SE SAN 3A POWER INVESTMENT AND DEVELOPMENT JOINT - STOCK COMPANY through an Open bidding as an independent entity. Three other contractors also participated.
22/04/2024 09:05
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder SAI GON BAN MAI COMMERCIAL COMPANY LIMITED participated in 220 package, of which 145 package was won, failed 62 packages, 8 packages with no results, 5 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SAI GON BAN MAI COMMERCIAL COMPANY LIMITED is related to 64 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SAI GON BAN MAI COMMERCIAL COMPANY LIMITED competed with 94 contractors in 132 package, won 60 package, lost 61 package, 7 bidding package has no results, 4 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor SAI GON BAN MAI COMMERCIAL COMPANY LIMITED once entered into a partnership with 5 contractors in 12 package, won bid 7 package, lost 4 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor SAI GON BAN MAI COMMERCIAL COMPANY LIMITED participated in bidding in 27 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,710 contractor who have not participated in any bidding packages