Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 141 bidding packages, of which 100 were won, 39 were lost, 1 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 43.91% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 91.25% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đồng Tháp (93), Tây Ninh (11), TP.Hồ Chí Minh (7), Vĩnh Long (7), Đồng Nai (5), Huế (2), Hà Tĩnh (2), Thanh Hoá (1), Nghệ An (1), Quảng Trị (1), An Giang (1), Cần Thơ (1), Undefined (9)
- Provinces before the merger where the contractor has participated in bidding : Tiền Giang (70), Long An (7), Đồng Tháp (6), Bà Rịa - Vũng Tàu (6), Bến Tre (5), Đồng Nai (3), Huế (2), Tây Ninh (2), Hà Tĩnh (2), Thanh Hoá (1), Nghệ An (1), Quảng Bình (1), Kiên Giang (1), Bình Phước (1), Cần Thơ (1), Undefined (32)
- Has relationships with 48 Bid Solicitors
- Has competed against 139 contractors in 86 bidding packages, won 42 packages, lost 37 packages, 6 are pending results, and 1 were canceled.
- Has collaborated with 14 contractors in 21 bidding packages, won 16 packages, lost 4 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: CÔNG TY TNHH GIẢI PHÁP CÔNG NGHỆ VÀ ĐẦU TƯ XÂY DỰNG SDKD
- Construction capacity certificate code: 00059899
- Issuing Authority: Sở Kế hoạch và Đầu tư Thành phố Hồ Chí Minh
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Quản lý dự án đầu tư xây dựng: Tư vấn quản lý dự án đầu tư xây dựng công trình dân dụng
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình dân dụng
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình công nghiệp năng lượng đường dây và trạm biến áp
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình giao thông đường bộ
⚬ Thi công lắp đặt thiết bị vào công trình: Dân dụng
⚬ Giám sát công tác xây dựng công trình: Tư vấn giám sát công tác xây dựng công trình hạ tầng kỹ thuật
⚬ Giám sát công tác xây dựng công trình: Tư vấn giám sát công tác xây dựng công trình giao thông đường bộ
⚬ Giám sát lắp đặt thiết bị công trình: Tư vấn giám sát lắp đặt thiết bị vào công trình dân dụng
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 7 | 7% |
| Lower by 10% to 20% | 14 | 14% |
| Lower by 5% to 10% | 16 | 16% |
| Lower by 1% to 5% | 43 | 43% |
| Lower by 0% to 1% | 19 | 19% |
| 0% | 1 | 1% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 100 | 100% |
SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED Won the bidding for the Construction package, which was invited for bidding by the Văn phòng Hội đồng nhân dân và Ủy ban nhân dân xã Kim Sơn through an assign shorthand as an independent entity.
- Result: Won
31/12/2025 17:53
SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED Won the bidding for the Construction of lighting system in Vinh Kim commune: Section from Kenh Moi bridge to Long Hoa A cultural hamlet welcome sign; Section from District Road 35 to Vinh Kim Kindergarten package, which was invited for bidding by the Văn phòng HĐND và UBND xã Vĩnh Kim through an assign shorthand as an independent entity.
- Result: Won
31/12/2025 17:22
SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED Won the bidding for the Construction package, which was invited for bidding by the Phòng Kinh tế xã Thanh Hưng through an assign shorthand as an independent entity.
- Result: Won
31/12/2025 10:57
SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED Won the bidding for the Construction of lighting system on Provincial Road 863 from National Highway 1 to district road 71 intersection package, which was invited for bidding by the Văn Phòng HĐND và UBND XÃ HỘI CƯ through an assign shorthand as an independent entity.
- Result: Won
27/12/2025 16:28
SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED Won the bidding for the Construction of lighting system for District Road 80, from Provincial Road 861 to My Tan residential area package, which was invited for bidding by the VĂN PHÒNG HỘI ĐỒNG NHÂN DÂN VÀ ỦY BAN NHÂN DÂN XÃ MỸ THIỆN through an assign shorthand as an independent entity.
- Result: Won
27/12/2025 15:41
SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED Won the bidding for the Construction of District Road 73 lighting system package, which was invited for bidding by the Văn phòng HĐND - UBND xã Hậu Mỹ through an assign shorthand as an independent entity.
- Result: Won
27/12/2025 12:10
SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED lost the bidding for the Construction cost package, which was invited for bidding by the through an Open bidding as an independent entity. Twelve other contractors also participated.
- Result: Lost
25/12/2025 14:12
SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED Won the bidding for the Construction: Installation of lighting system on District Road 22 (Section from Binh Phan bridge to South street of Cho Gao canal) package, which was invited for bidding by the Văn phòng Hội đồng nhân dân và Ủy ban nhân dân xã An Thạnh Thủy through an assign shorthand as an independent entity.
- Result: Won
23/12/2025 09:22
SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED Won the bidding for the Construction of lighting system in some sections on District Road 79 package, which was invited for bidding by the Văn phòng Hội đồng nhân dân và Ủy ban nhân dân xã Mỹ Lợi through an assign shorthand as an independent entity.
- Result: Won
20/12/2025 23:10
SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED Won the bidding for the Package No. 02: Construction and Investment of lighting system on Highway 30 passing through My Hiep commune, Binh Hang Trung commune and My Tho commune package, which was invited for bidding by the SỞ XÂY DỰNG TỈNH ĐỒNG THÁP through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
15/12/2025 10:36
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED participated in 141 package, of which 100 package was won, failed 39 packages, 1 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED is related to 48 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED competed with 139 contractors in 86 package, won 42 package, lost 37 package, 6 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED once entered into a partnership with 14 contractors in 21 package, won bid 16 package, lost 4 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED participated in bidding in 12 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SDKD CONSTRUCTION INVESTMENT AND TECHNOLOGY SOLUTIONS COMPANY LIMITED participated in bidding in 15 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor