Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors TESLA are as follows:
You need to Login or Sign up to view all informations.
- Participated in 169 bidding packages, of which 133 were won, 30 were lost, 6 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 9.8% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.34% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (144), Đồng Nai (3), Undefined (22)
- Provinces before the merger where the contractor has participated in bidding : Bình Dương (118), Đồng Nai (3), TP.Hồ Chí Minh (3), Undefined (45)
- Has relationships with 33 Bid Solicitors
- Has competed against 43 contractors in 49 bidding packages, won 13 packages, lost 19 packages, 17 are pending results, and 0 were canceled.
- Has collaborated with 18 contractors in 61 bidding packages, won 59 packages, lost 0 packages, 2 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 106 bidding packages with 40 roles.
- Building organization name: Công ty TNHH Tư vấn Xây dựng Tesla
- Construction capacity certificate code: 00014030
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Bình Dương
- Field:
⚬ Khảo sát xây dựng: Khảo sát địa hình
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật (Hệ thống chiếu sáng)
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 3 | 2.3% |
| Lower by 10% to 20% | 9 | 6.8% |
| Lower by 5% to 10% | 64 | 48.1% |
| Lower by 1% to 5% | 21 | 15.8% |
| Lower by 0% to 1% | 12 | 9% |
| 0% | 24 | 18% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 133 | 100% |
TESLA lost the bidding for the Construction supervision and equipment installation package, which was invited for bidding by the through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
14/01/2026 13:48
TESLA lost the bidding for the Construction supervision and equipment installation package, which was invited for bidding by the through an Open bidding as an independent entity. Five other contractors also participated.
- Result: Lost
13/01/2026 16:40
TESLA lost the bidding for the Package 1: Consulting on surveying, preparing F/S report and BVTC-DT for the project "Completing and developing the power grid in Di An ward area in 2026" package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
10/01/2026 14:42
TESLA lost the bidding for the Package 1: Consulting on surveying, preparing F/S and TKBVTC-DT for the project "Completing and developing the power grid in Binh Hoa, Thuan Giao, An Phu wards in 2026" package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
10/01/2026 10:47
TESLA lost the bidding for the Package TK.2026.14: Consulting on surveying, preparing technical feasibility report for the project: New construction of 22kV line to enhance grid connection of line 475 Tam Lap Phu Giao 110kV station to Tan Hiep 110kV station package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
06/01/2026 18:54
TESLA lost the bidding for the Construction supervision and equipment installation package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
29/12/2025 10:34
TESLA Won the bidding for the Construction supervision and equipment installation package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - CÔNG TY ĐIỆN LỰC BÌNH DƯƠNG through an Open bidding as an independent entity.
- Result: Won
26/12/2025 17:15
TESLA lost the bidding for the Bid package TK.2026.07: Consulting on survey and preparation of technical feasibility study report for the project: Construction of a new medium voltage grid to supply electricity to the Hung Hoa area in 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
23/12/2025 22:11
TESLA Won the bidding for the Consulting on surveys and preparing feasibility study reports with costs applying Building Information Modeling (BIM) package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng khu vực Thủ Dầu Một through an Open bidding as sub-joint of LIÊN DANH THIẾT KẾ ĐƯỜNG VEN SÔNG SÀI GÒN.
- Result: Won
22/12/2025 14:46
TESLA lost the bidding for the Construction supervision consultancy and equipment attached to construction package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY TNHH TƯ VẤN - XÂY DỰNG TESLA. Four other contractors also participated.
- Result: Lost
17/12/2025 11:41
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder TESLA participated in 169 package, of which 133 package was won, failed 30 packages, 6 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TESLA is related to 33 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TESLA competed with 43 contractors in 49 package, won 13 package, lost 19 package, 17 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor TESLA once entered into a partnership with 18 contractors in 61 package, won bid 59 package, lost 0 package, 2 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor TESLA participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TESLA participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor