Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:05 AM 11/04/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:47 AM 11/04/2024 |
Active |
At the request of QTHT |
|
12:05 AM 01/31/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
10:52 AM 02/03/2025 |
Active |
At the request of QTHT |
|
12:05 AM 03/13/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
2:43 PM 03/18/2025 |
Active |
At the request of QTHT |
|
1:06 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
10:06 AM 04/03/2025 |
Active |
At the request of QTHT |
|
12:05 AM 05/14/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:51 AM 05/16/2025 |
Active |
At the request of QTHT |
|
12:05 AM 06/17/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
11:12 AM 06/25/2025 |
Active |
At the request of QTHT |
|
12:05 AM 07/20/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
3:17 PM 08/08/2025 |
Active |
At the request of QTHT |
|
12:05 AM 09/08/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:05 AM 09/17/2025 |
Active |
At the request of QTHT |
|
12:05 AM 10/05/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:47 AM 10/09/2025 |
Active |
At the request of QTHT |
|
12:05 AM 11/20/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
4:38 PM 11/26/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 139 bidding packages, of which 116 were won, 20 were lost, 2 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 20.67% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 88.28% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Vĩnh Long (20), TP.Hồ Chí Minh (15), Cần Thơ (14), An Giang (12), Cà Mau (9), Đồng Tháp (8), Đồng Nai (5), Hà Nội (4), Tây Ninh (4), Lâm Đồng (4), Đắk Lắk (3), Đà Nẵng (2), Phú Thọ (1), Điện Biên (1), Lào Cai (1), Hưng Yên (1), Hải Phòng (1), Undefined (36)
- Provinces before the merger where the contractor has participated in bidding : Trà Vinh (13), TP.Hồ Chí Minh (9), Kiên Giang (8), Hậu Giang (7), Cần Thơ (5), Tiền Giang (5), Hà Nội (4), An Giang (4), Bình Thuận (4), Bình Dương (3), Đắk Lắk (3), Vĩnh Long (3), Cà Mau (3), Bình Phước (3), Bạc Liêu (3), Sóc Trăng (2), Đồng Nai (2), Đồng Tháp (2), Long An (2), Đà Nẵng (2), Bến Tre (1), Phú Thọ (1), Điện Biên (1), Yên Bái (1), Hưng Yên (1), Tây Ninh (1), Undefined (48)
- Has relationships with 78 Bid Solicitors
- Has competed against 89 contractors in 51 bidding packages, won 30 packages, lost 20 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 30 contractors in 36 bidding packages, won 29 packages, lost 7 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 39 bidding packages with 12 roles.
- Building organization name: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG THÀNH CÔNG
- Construction capacity certificate code: 00004166
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hồ Chí Minh
- Field:
⚬ Khảo sát xây dựng: Địa hình, địa chất công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật (trừ công trình xử lý chất thải rắn)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thủy lợi
⚬ Giám sát thi công xây dựng công trình: Giao thông (cầu, đường bộ)
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật, Thủy lợi
⚬ Khảo sát xây dựng: Địa hình, Địa chất công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông (cầu, đường bộ)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật (trừ công trình xử lý chất thải rắn)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thủy lợi
⚬ Giám sát thi công xây dựng công trình: Giao thông (cầu, đường bộ), trình Hạ tầng kỹ thuật, Thủy lợi
- Lab name: Construction specialized laboratory.
- Laboratory code: LAS-XD 459
- Certifications:
⚬ Certificate 531/GCN-BXD.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 29 | 25% |
| Lower by 10% to 20% | 2 | 1.7% |
| Lower by 5% to 10% | 20 | 17.2% |
| Lower by 1% to 5% | 29 | 25% |
| Lower by 0% to 1% | 25 | 21.6% |
| 0% | 3 | 2.6% |
| Higher by 0% to 1% | 4 | 3.4% |
| Higher by 1% to 5% | 2 | 1.7% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 2 | 1.7% |
| Unknown | 0 | 0% |
| Total | 116 | 100% |
THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY Won the bidding for the Prepare construction drawing records and construction cost estimates package, which was invited for bidding by the TRUNG TÂM PHÁT TRIỂN QUỸ ĐẤT through an Open bidding as sub-joint of LIÊN DANH CÔNG TY ĐẠI QUANG HPC VÀ CÔNG TY THÀNH CÔNG.
- Result: Won
31/12/2025 17:27
THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY Won the bidding for the Bidding package TV02: Survey consultancy, feasibility study report, land clearance pile and project information model (BIM) package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình giao thông tỉnh Bạc Liêu through an Open bidding as an independent entity.
- Result: Won
29/11/2025 16:24
THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY Won the bidding for the Consultancy on verification of Feasibility Study Report package, which was invited for bidding by the TienGiang PPMU through an assign shorthand as an independent entity.
- Result: Won
19/11/2025 09:24
THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY join for the Bidding package TV02: Survey consultancy, feasibility study report, site deposit package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình giao thông tỉnh Bạc Liêu through an Open bidding as an independent entity. One other contractors also participated.
- Result: Bid canceled
05/11/2025 09:54
THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY join for the Bidding package TV02: Survey consultancy, feasibility study report, land clearance pile and project information model (BIM) package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình giao thông tỉnh Bạc Liêu through an Open bidding as an independent entity.
- Result: Tender opening completed
05/11/2025 09:53
THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY lost the bidding for the Package No. 5: Consulting in verification of feasibility study reports package, which was invited for bidding by the Hai Phong Bridge Projects Management Department through an Open bidding as an independent entity. Five other contractors also participated.
- Result: Lost
28/10/2025 17:41
THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY Won the bidding for the Package No. 01 (TV01): Making survey tasks and estimates for making pre -feasibility study reports package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình giao thông tỉnh Bạc Liêu through an assign shorthand as an independent entity.
- Result: Won
13/10/2025 15:22
THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY Won the bidding for the Package No. 01: Making a proposal report on investment policy package, which was invited for bidding by the Ban Quản lý dự án giao thông tỉnh Vĩnh Long through an assign shorthand as an independent entity.
- Result: Won
09/10/2025 21:44
THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY Won the bidding for the Package No. 04: Survey consultancy, scientific research plan package, which was invited for bidding by the Ban Quản lý dự án giao thông tỉnh Vĩnh Long through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
25/09/2025 20:05
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY participated in 139 package, of which 116 package was won, failed 20 packages, 2 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY is related to 78 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY competed with 89 contractors in 51 package, won 30 package, lost 20 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY once entered into a partnership with 30 contractors in 36 package, won bid 29 package, lost 7 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY participated in bidding in 17 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor THANH CONG CONSTRUCTION CONSULTANT JOINT STOCK COMPANY participated in bidding in 26 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor