Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
7:52 AM 09/16/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
9:44 AM 09/16/2022 |
Active |
At the request of QTHT |
|
1:08 AM 11/25/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
9:29 AM 11/25/2022 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 319 bidding packages, of which 152 were won, 154 were lost, 9 are pending results, and 4 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 38.97% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 89.3% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (148), Đồng Nai (43), Lâm Đồng (27), Đắk Lắk (8), Tây Ninh (7), Khánh Hòa (5), Hà Nội (4), Đồng Tháp (1), Cần Thơ (1), Gia Lai (1), Huế (1), An Giang (1), Undefined (72)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (109), Đồng Nai (38), Bình Thuận (25), Bà Rịa - Vũng Tàu (18), Long An (7), Phú Yên (7), Ninh Thuận (5), Hà Nội (4), Bình Phước (2), Tiền Giang (1), Sóc Trăng (1), Bình Định (1), Huế (1), Undefined (100)
- Has relationships with 66 Bid Solicitors
- Has competed against 157 contractors in 217 bidding packages, won 49 packages, lost 146 packages, 19 are pending results, and 3 were canceled.
- Has collaborated with 20 contractors in 52 bidding packages, won 16 packages, lost 33 packages, 1 are pending results, and 2 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 210 bidding packages with 21 roles.
- Building organization name: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG ĐIỆN THÀNH ĐẠT
- Construction capacity certificate code: 00004451
- Issuing Authority: Sở Kế hoạch và Đầu tư Thành phố Hồ Chí Minh
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp (năng lượng: điện gió, điện mặt trời)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình công nghiệp (nhà máy nhiệt điện).
⚬ Thi công xây dựng công trình: Thi công xây dựng công trình công nghiệp (nhà máy điện mặt trời).
⚬ Khảo sát xây dựng: Khảo sát địa hình, địa chất công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp (đường dây và trạm biến áp)
⚬ Thi công xây dựng công trình: Công nghiệp (đường dây và trạm biến áp)
⚬ Giám sát thi công xây dựng công trình: Công nghiệp (đường dây và trạm biến áp)
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 30 | 19.7% |
| Lower by 10% to 20% | 49 | 32.2% |
| Lower by 5% to 10% | 39 | 25.7% |
| Lower by 1% to 5% | 23 | 15.1% |
| Lower by 0% to 1% | 6 | 3.9% |
| 0% | 5 | 3.3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 152 | 100% |
THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED lost the bidding for the Consulting TKBVTC-DT package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
13/01/2026 16:27
THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED join for the Consulting on setting up VTC-DT. package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
06/01/2026 11:04
THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED Won the bidding for the Package 02TV package, which was invited for bidding by the Sở Công Thương tỉnh Đắk Lắk through an assign shorthand as an independent entity.
- Result: Won
30/12/2025 15:52
THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED join for the Consulting on setting up VTC-DT. package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
30/12/2025 11:04
THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED join for the Consulting on surveying and preparing F/S reports and TKBVTC-DT package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
29/12/2025 11:08
THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED join for the Consulting on surveying and preparing F/S reports and TKBVTC-DT package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
29/12/2025 09:09
THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED lost the bidding for the Bid package TK.2026.07: Consulting on survey and preparation of technical feasibility study report for the project: Construction of a new medium voltage grid to supply electricity to the Hung Hoa area in 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
23/12/2025 22:11
THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED lost the bidding for the Bid package TK.2026.06: Consulting on survey and preparation of technical feasibility study report for the project: Construction of a new medium voltage grid supplying electricity to Tan Hung area in 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
23/12/2025 22:10
THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED Won the bidding for the Consulting on surveying, preparing F/S report and TKBVTC-DT for the project "Upgrading, renovating, preventing overload, developing medium voltage power grid and power supply substation in area 04 of Binh Duong Electricity Company in 2026" package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - BAN QUẢN LÝ DỰ ÁN LƯỚI ĐIỆN PHÂN PHỐI THÀNH PHỐ HỒ CHÍ MINH through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
23/12/2025 17:20
THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED lost the bidding for the Consulting on surveying, preparing F/S report and TKBVTC-DT for the project "Renovating and upgrading the medium voltage grid and connecting the loop of the exposed area of Tan Dong Hiep and Song Than intermediate stations in 2026" package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
23/12/2025 16:03
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED participated in 319 package, of which 152 package was won, failed 154 packages, 9 packages with no results, 4 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED is related to 66 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED competed with 157 contractors in 217 package, won 49 package, lost 146 package, 19 bidding package has no results, 3 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED once entered into a partnership with 20 contractors in 52 package, won bid 16 package, lost 33 package, 1 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED participated in bidding in 12 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor THANH DAT POWER CONSTRUCTION DESIGNING CONSULTING COMPANY LIMITED participated in bidding in 13 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor