Data analysis results of DauThau.info software for contractors TRUONG SON CONSTRUCTION CORPORATION are as follows:
You need to Login or Sign up to view all informations.
- Participated in 599 bidding packages, of which 570 were won, 23 were lost, 6 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 58.9% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 90.34% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (14), Đồng Nai (11), Hà Tĩnh (9), Thanh Hoá (9), Quảng Bình (8), Kiên Giang (7), Vĩnh Long (6), Hà Nam (6), Quảng Trị (5), Nghệ An (5), TP.Hồ Chí Minh (4), Điện Biên (3), Thái Nguyên (3), Khánh Hòa (3), Bà Rịa - Vũng Tàu (3), Long An (2), Yên Bái (2), Trà Vinh (2), Đồng Tháp (2), Quảng Nam (2), Bình Định (2), Đà Nẵng (2), Tuyên Quang (2), Hòa Bình (2), Bắc Cạn (2), Kon Tum (1), Ninh Thuận (1), Lạng Sơn (1), Tây Ninh (1), Hải Dương (1), Hà Giang (1), Sơn La (1), Quảng Ninh (1), Thừa Thiên - Huế (1), Hưng Yên (1), Bình Dương (1), Hải Phòng (1), Nam Định (1), Cao Bằng (1), Bắc Ninh (1), An Giang (1), Đắk Lắk (1), Bạc Liêu (1), Thái Bình (1), Tiền Giang (1), Phú Yên (1), Lâm Đồng (1), Undefined (466)
- Has relationships with 246 Bid Solicitors
- Has competed against 139 contractors in 53 bidding packages, won 21 packages, lost 18 packages, 14 are pending results, and 0 were canceled.
- Has collaborated with 143 contractors in 137 bidding packages, won 132 packages, lost 4 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Published contractor selection plan of 22 project with a total of 91 of bidding packages.
- Invitation to bid 44 package (with 48 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 50 packages announced, canceled bids 0 packages (among the packages above).
- There are 8 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors TSC are as follows:
- As the investor of 0 investment and development projects.
- As the investor of 3 Contractor Selection Plan, including 3 self-published Contractor Selection Plan, 0 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 1 bidding package in which the package is self-inviting 1, with 0 the package is owned by the unit. other bidding.
- Building organization name: TỔNG CÔNG TY XÂY DỰNG TRƯỜNG SƠN
- Construction capacity certificate code: 00001065
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hà Nội
- Field:
⚬ Thi công xây dựng công trình: Dân dụng
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 102 | 17.9% |
Lower by 10% to 20% | 67 | 11.8% |
Lower by 5% to 10% | 66 | 11.6% |
Lower by 1% to 5% | 87 | 15.3% |
Lower by 0% to 1% | 95 | 16.7% |
0% | 119 | 20.9% |
Higher by 0% to 1% | 2 | 0.4% |
Higher by 1% to 5% | 8 | 1.4% |
Higher by 5% to 10% | 2 | 0.4% |
Higher by 10% or more | 22 | 3.9% |
Unknown | 0 | 0% |
Total | 570 | 100% |
TRUONG SON CONSTRUCTION CORPORATION Won the bidding for the Package No. 4.8: Construction, equipment installation, design and construction drawings of intra-port traffic works and airport technical infrastructure package, which was invited for bidding by the AIRPORTS CORPORATION OF VIET NAM through an Open bidding as master consortium of TỔNG CÔNG TY XÂY DỰNG TRƯỜNG SƠN. Sixteen other contractors also participated.
- Result: Won
25/10/2024 18:21
TRUONG SON CONSTRUCTION CORPORATION Won the bidding for the Construction package No. 03: Construction of 02 Km30 bridges and Cua Dong bridge package, which was invited for bidding by the Ban Quản lý Dự án đầu tư xây dựng các công trình Giao thông tỉnh Khánh Hòa through an Open bidding as an independent entity. Six other contractors also participated.
- Result: Won
25/10/2024 16:06
TRUONG SON CONSTRUCTION CORPORATION join for the Package XL-NG51: Construction of National Highway 51 intersection (including construction insurance during construction period) package, which was invited for bidding by the Vietnam Expressway Corporation through an Open bidding as master consortium of TỔNG CÔNG TY XÂY DỰNG TRƯỜNG SƠN. Sixteen other contractors also participated.
23/10/2024 14:07
TRUONG SON CONSTRUCTION CORPORATION lost the bidding for the Tender package for construction and equipment supply and installation package, which was invited for bidding by the Vietnam women Academy through an Open bidding as master consortium of TỔNG CÔNG TY XÂY DỰNG TRƯỜNG SƠN. Twelve other contractors also participated.
- Result: Lost
22/10/2024 16:59
TRUONG SON CONSTRUCTION CORPORATION Won the bidding for the Package No. 05: Clearing mines and explosives package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng thành phố Đà Lạt through an assign bid as an independent entity.
- Result: Won
22/10/2024 16:31
TRUONG SON CONSTRUCTION CORPORATION Won the bidding for the Package 09B: Construction of clearing mines and explosives package, which was invited for bidding by the PMU2 through an assign bid as master consortium of TỔNG CÔNG TY XÂY DỰNG TRƯỜNG SƠN.
- Result: Won
21/10/2024 16:46
TRUONG SON CONSTRUCTION CORPORATION Won the bidding for the Demolition of construction mines package, which was invited for bidding by the Ban QLDA các công trình thành phố Điện Biên Phủ through an assign shorthand as an independent entity.
- Result: Won
19/10/2024 08:55
TRUONG SON CONSTRUCTION CORPORATION Won the bidding for the Package No. 6: Costs for clearance of bombs, mines and explosives package, which was invited for bidding by the Ban quản lý dự án ĐTXD Khu Vực huyện An Biên through an assign shorthand as an independent entity.
- Result: Won
16/10/2024 09:46
TRUONG SON CONSTRUCTION CORPORATION Won the bidding for the Clearing mines package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng và phát triển quỹ đất huyện Quảng Ninh. through an assign bid as an independent entity.
- Result: Won
16/10/2024 09:41
TRUONG SON CONSTRUCTION CORPORATION Won the bidding for the 07.RPBM: Clearing bombs, mines and explosives package, which was invited for bidding by the Ủy ban nhân dân huyện Hương Khê through an assign bid as an independent entity.
- Result: Won
15/10/2024 09:38
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder TRUONG SON CONSTRUCTION CORPORATION participated in 599 package, of which 570 package was won, failed 23 packages, 6 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRUONG SON CONSTRUCTION CORPORATION is related to 246 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRUONG SON CONSTRUCTION CORPORATION competed with 139 contractors in 53 package, won 21 package, lost 18 package, 14 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor TRUONG SON CONSTRUCTION CORPORATION once entered into a partnership with 143 contractors in 137 package, won bid 132 package, lost 4 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor TRUONG SON CONSTRUCTION CORPORATION participated in bidding in 47 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,712 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code