Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 43 bidding packages, of which 35 were won, 7 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 51.5% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.8% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Khánh Hòa (28), Lâm Đồng (5), Đà Nẵng (1), Đắk Lắk (1), Undefined (8)
- Provinces before the merger where the contractor has participated in bidding : Khánh Hòa (26), Bình Thuận (3), Đà Nẵng (1), Đắk Lắk (1), Undefined (12)
- Has relationships with 17 Bid Solicitors
- Has competed against 52 contractors in 9 bidding packages, won 2 packages, lost 7 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 12 contractors in 8 bidding packages, won 4 packages, lost 4 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 31 bidding packages with 15 roles.
- Building organization name: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG TRẦN PHÚC NGUYÊN
- Construction capacity certificate code: 00044969
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Khánh Hòa
- Field:
⚬ Giám sát thi công xây dựng công trình: Công nghiệp
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: Công nghiệp
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp Đường dây và Trạm Biến áp
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật Hệ thống điện chiếu sáng và cấp thoát nước
⚬ Giám sát thi công xây dựng công trình: Công nghiệp Đường dây và Trạm Biến áp
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật Hệ thống điện chiếu sáng và cấp thoát nước
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 2 | 5.7% |
| Lower by 10% to 20% | 3 | 8.6% |
| Lower by 5% to 10% | 2 | 5.7% |
| Lower by 1% to 5% | 9 | 25.7% |
| Lower by 0% to 1% | 1 | 2.9% |
| 0% | 18 | 51.4% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 35 | 100% |
TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY Won the bidding for the Package No. 87: Supervision of installation of 04 construction investment projects of Vinh Tan 4 Thermal Power Plant in 2025 package, which was invited for bidding by the VINH TAN 4 THERMAL POWER PLANT through an assign shorthand as an independent entity.
- Result: Won
17/11/2025 09:44
TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY Won the bidding for the Bidding package 85: Supervision of installation of online battery surveillance system for the UPS system and for the 500kV DC Battery system package, which was invited for bidding by the VINH TAN 4 THERMAL POWER PLANT through an Open bidding as an independent entity.
- Result: Won
28/10/2025 08:17
TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY Won the bidding for the Prepare economic and technical reports package, which was invited for bidding by the Trường Cao Đẳng Du Lịch Nha Trang through an assign shorthand as an independent entity.
- Result: Won
25/10/2025 08:09
TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY lost the bidding for the Package No. 82: Supervision of installation of infrastructure to establish Phuoc Thai Power Plant Control Center package, which was invited for bidding by the VINH TAN 4 THERMAL POWER PLANT through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
23/10/2025 15:30
TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY join for the Bidding package 85: Supervision of installation of online battery surveillance system for the UPS system and for the 500kV DC Battery system package, which was invited for bidding by the VINH TAN 4 THERMAL POWER PLANT through an Open bidding as an independent entity.
- Result: Tender opening completed
23/09/2025 09:03
TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY join for the Package No. 82: Supervision of installation of infrastructure to establish Phuoc Thai Power Plant Control Center package, which was invited for bidding by the VINH TAN 4 THERMAL POWER PLANT through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
17/09/2025 09:26
TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY Won the bidding for the Package No. 68.2025 - Consulting to verify the Steering Committee, BCNCKT, TKBVTC - Estimation package, which was invited for bidding by the KHANH HOA POWER JOINT STOCK COMPANY through an assign shorthand as an independent entity.
- Result: Won
08/09/2025 17:03
TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY Won the bidding for the Consulting on supervision of moving medium, low voltage lines package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình Nông nghiệp và Giao thông tỉnh Khánh Hòa through an assign shorthand as an independent entity.
- Result: Won
29/07/2025 14:42
TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY Won the bidding for the Supervision of construction and relocation of medium, low voltage and lighting systems (section passing Khanh Son district) package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình Nông nghiệp và Giao thông tỉnh Khánh Hòa through an assign shorthand as an independent entity.
- Result: Won
15/07/2025 20:00
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY participated in 43 package, of which 35 package was won, failed 7 packages, 0 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY is related to 17 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY competed with 52 contractors in 9 package, won 2 package, lost 7 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY once entered into a partnership with 12 contractors in 8 package, won bid 4 package, lost 4 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY participated in bidding in 4 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRAN PHUC NGUYEN CONSTRUCTION INVESTMENT LIMITED COMPANY participated in bidding in 4 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor