Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 71 bidding packages, of which 54 were won, 16 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 80% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.55% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (21), Quảng Trị (8), Cần Thơ (6), Hải Phòng (5), Lâm Đồng (4), Hà Nội (4), Đà Nẵng (4), Vĩnh Long (3), Thái Nguyên (2), Quảng Ninh (1), Đồng Tháp (1), Phú Thọ (1), Undefined (11)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (21), Quảng Bình (8), Cần Thơ (5), Hà Nội (4), Hải Phòng (4), Đắk Nông (3), Đà Nẵng (3), Bến Tre (3), Thái Nguyên (2), Quảng Ninh (1), Bình Thuận (1), Hải Dương (1), Đồng Tháp (1), Hậu Giang (1), Phú Thọ (1), Undefined (12)
- Has relationships with 33 Bid Solicitors
- Has competed against 23 contractors in 25 bidding packages, won 8 packages, lost 16 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | 0% |
| Lower by 10% to 20% | 2 | 3.7% |
| Lower by 5% to 10% | 4 | 7.4% |
| Lower by 1% to 5% | 9 | 16.7% |
| Lower by 0% to 1% | 25 | 46.3% |
| 0% | 14 | 25.9% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 54 | 100% |
TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY Won the bidding for the Buy paddles package, which was invited for bidding by the Trung tâm Huấn luyện vận động viên trẻ quốc gia through an assign shorthand as an independent entity.
- Result: Won
13/08/2025 11:00
TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY Won the bidding for the Shopping for boats and paddle for training and competition in 2025 package, which was invited for bidding by the Trung tâm Huấn luyện vận động viên trẻ quốc gia through an Open bidding as an independent entity.
- Result: Won
08/07/2025 14:52
TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY join for the Shopping for boats and paddle for training and competition in 2025 package, which was invited for bidding by the Trung tâm Huấn luyện vận động viên trẻ quốc gia through an Open bidding as an independent entity.
- Result: Tender opening completed
30/06/2025 09:15
TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY Won the bidding for the Hiring boats to organize the traditional boat racing for excellent cheoers in 2025, the unit of training and sports competition in Thai Nguyen province package, which was invited for bidding by the TRUNG TÂM HUẤN LUYỆN VÀ THI ĐẤU THỂ DỤC THỂ THAO TỈNH THÁI NGUYÊN through an assign shorthand as an independent entity.
- Result: Won
04/06/2025 09:52
TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY Won the bidding for the Non -advice - maintenance, repair and replacement of the damaged parts of the Billiards table in 2025 package, which was invited for bidding by the TRUNG TÂM THỂ DỤC THỂ THAO PHAN ĐÌNH PHÙNG through an assign shorthand as an independent entity.
- Result: Won
25/03/2025 14:00
TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY Won the bidding for the Package No. 01: Procurement of buoys and cables for dragon boat competitions (Chai swimming) package, which was invited for bidding by the PHÒNG VĂN HOÁ VÀ THÔNG TIN through an Competitive Offer as an independent entity.
- Result: Won
12/02/2025 17:25
TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY join for the Package No. 01: Procurement of buoys and cables for dragon boat competitions (Chai swimming) package, which was invited for bidding by the PHÒNG VĂN HOÁ VÀ THÔNG TIN through an Competitive Offer as an independent entity.
- Result: Tender opening completed
30/12/2024 10:45
TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY Won the bidding for the Goods - Procurement of specialized machinery and equipment in 2024 (Boat racing) package, which was invited for bidding by the CÂU LẠC BỘ THỂ DỤC THỂ THAO THANH ĐA through an Competitive Offer as an independent entity.
- Result: Won
18/12/2024 14:48
TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY join for the Goods - Procurement of specialized machinery and equipment in 2024 (Boat racing) package, which was invited for bidding by the CÂU LẠC BỘ THỂ DỤC THỂ THAO THANH ĐA through an Competitive Offer as an independent entity.
- Result: Tender opening completed
06/12/2024 15:05
TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY Won the bidding for the Purchasing equipment, practicing and competing in Canoeing sports in 2024 package, which was invited for bidding by the Trường Năng khiếu Thể dục thể thao tỉnh Bến Tre through an Competitive Offer as an independent entity.
- Result: Won
28/10/2024 16:03
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY participated in 71 package, of which 54 package was won, failed 16 packages, 0 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY is related to 33 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY competed with 23 contractors in 25 package, won 8 package, lost 16 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY participated in bidding in 12 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRONG HUNG RUBBER - PLASTIC - COMPOSITE JOINT STOCK COMPANY participated in bidding in 15 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor