Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 270 bidding packages, of which 84 were won, 164 were lost, 7 are pending results, and 15 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 9.12% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 89.31% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (157), Bắc Ninh (23), Hải Phòng (19), Hưng Yên (12), Phú Thọ (11), Ninh Bình (10), Thái Nguyên (8), Thanh Hoá (7), Lào Cai (3), Tuyên Quang (3), Lạng Sơn (2), Quảng Ninh (2), (2), Cà Mau (1), Nationwide (1), Đà Nẵng (1), TP.Hồ Chí Minh (1), Undefined (7)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (157), Bắc Ninh (16), Hải Dương (11), Hưng Yên (11), Hải Phòng (8), Thái Nguyên (8), Thanh Hoá (7), Bắc Giang (6), Vĩnh Phúc (5), Nam Định (5), Phú Thọ (4), Ninh Bình (4), Lào Cai (3), Tuyên Quang (3), Lạng Sơn (2), Quảng Ninh (2), Cà Mau (1), Hà Nam (1), Nationwide (1), Đà Nẵng (1), Hòa Bình (1), TP.Hồ Chí Minh (1), Thái Bình (1), Undefined (22)
- Has relationships with 194 Bid Solicitors
- Has competed against 333 contractors in 238 bidding packages, won 52 packages, lost 162 packages, 9 are pending results, and 15 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 9 | 10.7% |
| Lower by 10% to 20% | 19 | 22.6% |
| Lower by 5% to 10% | 18 | 21.4% |
| Lower by 1% to 5% | 10 | 11.9% |
| Lower by 0% to 1% | 10 | 11.9% |
| 0% | 18 | 21.4% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 84 | 100% |
TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY Won the bidding for the Air-conditioning shopping in 2025-2027 package, which was invited for bidding by the Bệnh viện Nội tiết Trung ương through an Open bidding as an independent entity. Five other contractors also participated.
- Result: Won
09/01/2026 07:57
TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY lost the bidding for the Package No. 02: Procurement and installation of air conditioners package, which was invited for bidding by the through an Competitive Offer as an independent entity. Four other contractors also participated.
- Result: Lost
08/01/2026 11:14
TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY join for the Procurement of air conditioners for Hanoi Heart Hospital in 2025 package, which was invited for bidding by the through an Open bidding as an independent entity. Five other contractors also participated.
02/01/2026 08:44
TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY Won the bidding for the Procurement and installation of air conditioners for Office PA03 headquarters for business purposes package, which was invited for bidding by the Công an Thành phố Hà Nội through an assign shorthand as an independent entity.
- Result: Won
31/12/2025 17:31
TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY lost the bidding for the Local air conditioning shopping in 2025 package, which was invited for bidding by the Bệnh viện Đa khoa Bắc Ninh số 2 through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
30/12/2025 15:49
TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY join for the “Supply and installation of air conditioning equipment” package, which was invited for bidding by the through an Competitive Offer as an independent entity. Four other contractors also participated.
26/12/2025 09:01
TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY join for the Package No. 02: Procurement and installation of air conditioners package, which was invited for bidding by the through an Competitive Offer as an independent entity. Four other contractors also participated.
- Result: Tender opening completed
19/12/2025 08:36
TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY join for the Central air conditioning system at 108 Tran Hung Dao - 7th floor package, which was invited for bidding by the through an Competitive Offer as an independent entity. Three other contractors also participated.
10/12/2025 10:04
TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY Won the bidding for the Supply and installation of refrigerators at Dormitory Building D6 - Hanoi University package, which was invited for bidding by the Trường Đại học Hà Nội through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Won
03/12/2025 14:58
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY participated in 270 package, of which 84 package was won, failed 164 packages, 7 packages with no results, 15 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY is related to 194 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY competed with 333 contractors in 238 package, won 52 package, lost 162 package, 9 bidding package has no results, 15 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY participated in bidding in 16 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRUNG CHINH REFRIGERATION ENGINEERING JOINT STOCK COMPANY participated in bidding in 22 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor