Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
10:33 PM 10/15/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
8:41 AM 06/07/2023 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION are as follows:
You need to Login or Sign up to view all informations.
- Participated in 198 bidding packages, of which 187 were won, 10 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 9.7% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.82% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (66), Lâm Đồng (1), An Giang (1), Undefined (130)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (65), Bình Thuận (1), Bà Rịa - Vũng Tàu (1), Undefined (131)
- Has relationships with 24 Bid Solicitors
- Has competed against 26 contractors in 23 bidding packages, won 12 packages, lost 10 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 9 contractors in 11 bidding packages, won 10 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 1 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 71 bidding packages with 17 roles.
- Building organization name: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ CƠ ĐIỆN TRUNG NAM
- Construction capacity certificate code: 00003095
- Issuing Authority: Sở Kế hoạch và Đầu tư Thành phố Hồ Chí Minh
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông cầu, đường bộ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Nông nghiệp và phát triển nông thôn
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Cơ – điện công trình
⚬ Giám sát công tác xây dựng công trình: Giao thông cầu, đường bộ
⚬ Giám sát công tác xây dựng công trình: Hạ tầng kỹ thuật cấp thoát nước, công viên cây xanh, hệ thống chiếu sáng
⚬ Giám sát công tác xây dựng công trình: Nông nghiệp và phát triển nông thôn
⚬ Giám sát công tác xây dựng công trình: Cơ – điện công trình
⚬ Giám sát công tác xây dựng công trình: Nông nghiệp và phát triển nông thôn Thủy lợi: tưới tiêu
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 10 | 5.3% |
| Lower by 10% to 20% | 6 | 3.2% |
| Lower by 5% to 10% | 8 | 4.3% |
| Lower by 1% to 5% | 107 | 57.2% |
| Lower by 0% to 1% | 4 | 2.1% |
| 0% | 46 | 24.6% |
| Higher by 0% to 1% | 1 | 0.5% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 1 | 0.5% |
| Higher by 10% or more | 4 | 2.1% |
| Unknown | 0 | 0% |
| Total | 187 | 100% |
TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION Won the bidding for the Package 02: Consultancy and verification of economic and technical reports package, which was invited for bidding by the CÔNG TY TNHH MỘT THÀNH VIÊN KHAI THÁC THUỶ LỢI MIỀN NAM through an assign shorthand as an independent entity.
- Result: Won
11/12/2025 16:57
TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION Won the bidding for the Consultancy and verification of construction drawing design and cost estimate package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG KHU VỰC BÀ RỊA through an assign shorthand as an independent entity.
- Result: Won
09/12/2025 16:45
TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION lost the bidding for the Package 7b: Construction supervision consultancy package, which was invited for bidding by the CÔNG TY TNHH SAM BT through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
25/09/2025 10:04
TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION Won the bidding for the TV-20 bidding package: Supervision consultancy on construction of XL-2 bidding package package, which was invited for bidding by the NHAT MINH TIEN CONSTRUCTION CONSULTANCY COMPANY LIMITED through an Open bidding as sub-joint of Liên danh Tư vấn giám sát thi công xây dựng gói thầu XL-2.
- Result: Won
11/09/2025 14:59
TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION Won the bidding for the Consulting on construction and construction supervision, ensuring water traffic package, which was invited for bidding by the CAT AN BIDDING CONSULTING COMPANY LIMITTED through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
25/08/2025 16:06
TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION lost the bidding for the Consulting services 8 - Construction supervision package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng khu vực Quận 12 through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
04/08/2025 11:48
TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION Won the bidding for the Construction supervision consultancy for construction and installation packages package, which was invited for bidding by the Ban Quản lý dự án Đầu tư xây dựng khu vực huyện Cần Giờ through an assign shorthand as an independent entity.
- Result: Won
01/08/2025 08:34
TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION join for the Consulting on construction and construction supervision, ensuring water traffic package, which was invited for bidding by the CAT AN BIDDING CONSULTING COMPANY LIMITTED through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
15/07/2025 15:10
TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION join for the Package 7b: Construction supervision consultancy package, which was invited for bidding by the CÔNG TY TNHH SAM BT through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
04/07/2025 08:33
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION participated in 198 package, of which 187 package was won, failed 10 packages, 0 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION is related to 24 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION competed with 26 contractors in 23 package, won 12 package, lost 10 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION once entered into a partnership with 9 contractors in 11 package, won bid 10 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TRUNG NAM CONSTRUCTION AND MECHANICAL ELECTRICAL CORPORATION participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor