Data analysis results of DauThau.info software for contractors VICINCO VIETNAM JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 6 bidding packages, of which 3 were won, 2 were lost, 1 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 70.89% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.51% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Lâm Đồng (2), Lai Châu (1), Undefined (3)
- Has relationships with 5 Bid Solicitors
- Has competed against 13 contractors in 3 bidding packages, won 0 packages, lost 2 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 3 contractors in 2 bidding packages, won 1 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: CÔNG TY CỔ PHẦN VICINCO VIỆT NAM
- Construction capacity certificate code: 00019258
- Issuing Authority: Sở kế hoạch đầu tư Thành Phố Hà Nội
- Field:
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: NN&PTNT
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: NN&PTNT
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 0 | 0% |
Lower by 1% to 5% | 1 | 33.3% |
Lower by 0% to 1% | 1 | 33.3% |
0% | 0 | 0% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 1 | 33.3% |
Unknown | 0 | 0% |
Total | 3 | 100% |
VICINCO VIETNAM JOINT STOCK COMPANY join for the GT.M.SN-PK2: Construction of roads and rainwater drainage on routes 2, 16, 17, 18, 21; part of route No. 15; The remaining part is route 10 and leveling lots 22 and 23 package, which was invited for bidding by the LAM DONG CONSTRUCTION CONSULTING JOINT STOCK COMPANY through an Open bidding as master consortium of CÔNG TY CỔ PHẦN VICINCO VIỆT NAM. One other contractors also participated.
05/10/2024 09:44
VICINCO VIETNAM JOINT STOCK COMPANY lost the bidding for the E-SCL08-2024: Major repair in 2024 - Category: Internal roads - Lai Chau Hydropower Plant. Category: Road NT1.2. Section: Reinforcing positive slope of NT1.2 road from km0+700m to km0+908 package, which was invited for bidding by the CÔNG TY THỦY ĐIỆN SƠN LA - CHI NHÁNH TẬP ĐOÀN ĐIỆN LỰC VIỆT NAM through an Open bidding as master consortium of CÔNG TY CỔ PHẦN VICINCO VIỆT NAM. Two other contractors also participated.
- Result: Lost
10/05/2024 09:20
VICINCO VIETNAM JOINT STOCK COMPANY Won the bidding for the HTKT-D9: Construction of roads, rainwater drainage, wastewater drainage, water supply route No. 9 (the rest) package, which was invited for bidding by the LAM DONG CONSTRUCTION CONSULTING JOINT STOCK COMPANY through an Competitive Offer as an independent entity.
- Result: Won
27/10/2023 17:15
VICINCO VIETNAM JOINT STOCK COMPANY lost the bidding for the XL-09 [Building the section Km0+000 - Km20+000 (Km0+000 - Km20+667 DT175) of the route connecting Nghia Lo] package, which was invited for bidding by the Ban Quản lý dự án 2 through an Đấu thầu rộng rãi as sub-joint of Công ty Cổ phần Vicinco Việt Nam. Eleven other contractors also participated.
- Result: Lost
17/05/2022 10:33
VICINCO VIETNAM JOINT STOCK COMPANY Won the bidding for the Construction and installation of construction equipment package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng quận Hoàng Mai through an Đấu thầu rộng rãi trong nước as sub-joint of 0103039522 - Công ty Cổ phần xây lắp và thiết kế Thăng Long 8,0104021212 - Công ty CP Thiết Bị Kỹ Thuật Và Phòng Cháy Chữa Cháy Hoàng Long,0106196659 - Công ty Cổ phần Vicinco Việt Nam.
- Result: Won
18/12/2019 17:33
VICINCO VIETNAM JOINT STOCK COMPANY Won the bidding for the Package 6: Construction (Demolition, waste transportation) package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng quận Cầu Giấy through an Đấu thầu rộng rãi trong nước as an independent entity.
- Result: Won
25/10/2019 11:35
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder VICINCO VIETNAM JOINT STOCK COMPANY participated in 6 package, of which 3 package was won, failed 2 packages, 1 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VICINCO VIETNAM JOINT STOCK COMPANY is related to 5 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VICINCO VIETNAM JOINT STOCK COMPANY competed with 13 contractors in 3 package, won 0 package, lost 2 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor VICINCO VIETNAM JOINT STOCK COMPANY once entered into a partnership with 3 contractors in 2 package, won bid 1 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor VICINCO VIETNAM JOINT STOCK COMPANY participated in bidding in 2 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,681 contractor who have not participated in any bidding packages