Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
1:49 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
11:51 AM 07/11/2024 |
Active |
At the request of QTHT |
|
12:05 AM 06/18/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
5:13 PM 06/18/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors VKC CORPORATION are as follows:
You need to Login or Sign up to view all informations.
- Participated in 23 bidding packages, of which 12 were won, 9 were lost, 2 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 47.19% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 4.67% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (18), Nationwide (2), Hà Nội (1), Đồng Tháp (1), Khánh Hòa (1)
- Provinces before the merger where the contractor has participated in bidding : Bà Rịa - Vũng Tàu (7), TP.Hồ Chí Minh (6), Hà Nội (1), Đồng Tháp (1), Ninh Thuận (1), Undefined (7)
- Has relationships with 12 Bid Solicitors
- Has competed against 356 contractors in 23 bidding packages, won 12 packages, lost 8 packages, 3 are pending results, and 0 were canceled.
- Has collaborated with 6 contractors in 3 bidding packages, won 2 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 5 | 41.7% |
| Lower by 10% to 20% | 2 | 16.7% |
| Lower by 5% to 10% | 1 | 8.3% |
| Lower by 1% to 5% | 3 | 25% |
| Lower by 0% to 1% | 0 | 0% |
| 0% | 1 | 8.3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 12 | 100% |
VKC CORPORATION lost the bidding for the "Office equipment and wooden furniture for IT&LL Center" (according to order VT-3778/25-IT-TTH. Contact email: hoabt.ts@vietsov.com.vn) package, which was invited for bidding by the Vietsovpetro Joint Venture through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Lost
04/12/2025 15:24
VKC CORPORATION Won the bidding for the Package No. 06: Construction and renovation, upgrading air conditioning system, light electricity, solar power package, which was invited for bidding by the Ban Quản lý Dự án Xây dựng Đại học Quốc gia TP. Hồ Chí Minh through an Open bidding as sub-joint of Liên danh VMRC - VKC – LMG. Two other contractors also participated.
- Result: Won
13/11/2025 08:30
VKC CORPORATION join for the "Office equipment and wooden furniture for IT&LL Center" (according to order VT-3778/25-IT-TTH. Contact email: hoabt.ts@vietsov.com.vn) package, which was invited for bidding by the Vietsovpetro Joint Venture through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
05/11/2025 14:30
VKC CORPORATION join for the Package No. 06: Construction and renovation, upgrading air conditioning system, light electricity, solar power package, which was invited for bidding by the Ban Quản lý Dự án Xây dựng Đại học Quốc gia TP. Hồ Chí Minh through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN VKC. Two other contractors also participated.
- Result: Tender opening completed
01/11/2025 08:03
VKC CORPORATION lost the bidding for the Micro-equipment for marine works (VT-3132/25-TNTT (LTN)) package, which was invited for bidding by the Vietsovpetro Joint Venture through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
23/10/2025 16:40
VKC CORPORATION lost the bidding for the Shopping supplies instead package, which was invited for bidding by the DONG THAP HOSPITAL through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN VKC. Five other contractors also participated.
- Result: Lost
10/10/2025 16:10
VKC CORPORATION Won the bidding for the "Information technology equipment serves the Board of Directors" on orders VT-3234/25-TNTT-TTH (Contact Email: hoabt.ts@vietsov.com.vn) package, which was invited for bidding by the Vietsovpetro Joint Venture through an Competitive Offer as an independent entity. Four other contractors also participated.
- Result: Won
06/10/2025 15:11
VKC CORPORATION join for the Shopping for medical supplies, disinfectant chemicals, medical gas in 2025-2026 package, which was invited for bidding by the Bệnh viện đa khoa khu vực Thủ Đức through an Open bidding as an independent entity. One hundred sixty nine other contractors also participated.
29/09/2025 10:10
VKC CORPORATION Won the bidding for the Shopping accessories used with medical equipment package, which was invited for bidding by the Bệnh viện đa khoa Ninh Thuận through an Open bidding as sub-joint of Liên danh Nhà thầu VG-VKC. Two other contractors also participated.
- Result: Won
26/09/2025 08:27
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder VKC CORPORATION participated in 23 package, of which 12 package was won, failed 9 packages, 2 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VKC CORPORATION is related to 12 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VKC CORPORATION competed with 356 contractors in 23 package, won 12 package, lost 8 package, 3 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor VKC CORPORATION once entered into a partnership with 6 contractors in 3 package, won bid 2 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor VKC CORPORATION participated in bidding in 4 provinces/cities, 2 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VKC CORPORATION participated in bidding in 5 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor