Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
| Company name | Viện Thủy công |
|
| International name | Hydraulic Construction Institute | |
| Views | 2345 | |
| Business Tax ID | 0102963320 | |
| Tax ID issue date | 20/09/2010 | |
| Tax ID issue country | Việt Nam | |
| Business Registration ID | vn0102963320 | |
| Head office address after merger | Số 3, Ngõ 95, Phố Chùa Bộc, Phường Kim Liên, Hà Nội | |
| Company Website | http://www.thuycong.ac.vn | |
| Form of Business | Administrative units, non-business units | |
| Company Establishment Date | 21/09/2010 | |
| The number of workers | 130 | |
| Date of registration on the Public procurement system | 10/06/2015 | |
| Payment Status |
Paid
According to Circular 06/2021, from March 3, 2022, investors and contractors will be stopped from trading if they do not pay fees for posting information, selecting contractors, investors on the national bidding network system. |
|
| Legal representative | Nguyễn Chí Thanh | |
| Position | Vice President in charge | |
| Attached files |
Adjust business operations Organizational chart Business registration certificate
|
|
History of active status changes
Data analysis results of DauThau.info software for contractors Hydraulic Construction Institute are as follows:
You need to Login or Sign up to view all informations.
- Participated in 268 bidding packages, of which 245 were won, 18 were lost, 4 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 34.85% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.02% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Phú Thọ (24), Hà Nội (17), Điện Biên (17), Ninh Bình (11), Lạng Sơn (10), Thái Nguyên (9), Quảng Ninh (9), Quảng Trị (9), Bắc Ninh (7), Gia Lai (6), Lâm Đồng (6), Hưng Yên (5), Đà Nẵng (5), Thanh Hoá (5), Cà Mau (4), Lào Cai (4), Hải Phòng (4), Sơn La (3), Tây Ninh (3), Hà Tĩnh (3), Cần Thơ (2), Huế (2), Cao Bằng (2), An Giang (2), Đồng Nai (1), TP.Hồ Chí Minh (1), Đắk Lắk (1), Quảng Ngãi (1), Khánh Hòa (1), Nghệ An (1), Undefined (111)
- Provinces before the merger where the contractor has participated in bidding : Hòa Bình (18), Hà Nội (17), Điện Biên (17), Lạng Sơn (10), Quảng Ninh (9), Quảng Bình (7), Bắc Kạn (6), Bắc Giang (6), Hà Nam (6), Quảng Nam (5), Thanh Hoá (5), Gia Lai (4), Nam Định (3), Sơn La (3), Tây Ninh (3), Phú Thọ (3), Hà Tĩnh (3), Bình Thuận (3), Hải Phòng (3), Thái Bình (3), Ninh Bình (3), Bình Định (2), Hưng Yên (2), Bạc Liêu (2), Cần Thơ (2), Yên Bái (2), Cà Mau (2), Vĩnh Phúc (2), Lào Cai (2), Thái Nguyên (2), Hải Dương (2), Huế (2), Cao Bằng (2), Kiên Giang (2), Lâm Đồng (2), Bắc Ninh (1), Đồng Nai (1), Bình Dương (1), Đắk Lắk (1), Quảng Ngãi (1), Khánh Hòa (1), Quảng Trị (1), Nghệ An (1), Undefined (120)
- Has relationships with 131 Bid Solicitors
- Has competed against 98 contractors in 88 bidding packages, won 67 packages, lost 18 packages, 2 are pending results, and 1 were canceled.
- Has collaborated with 85 contractors in 89 bidding packages, won 78 packages, lost 9 packages, 2 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 113 bidding packages with 18 roles.
- Published contractor selection plan of 21 project with a total of 31 of bidding packages.
- Invitation to bid 13 package (with 18 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 27 packages announced, canceled bids 0 packages (among the packages above).
- There are 20 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors Hydraulic Construction Institute are as follows:
- As the investor of 3 investment and development projects.
- As the investor of 6 Contractor Selection Plan, including 5 self-published Contractor Selection Plan, 1 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 18 bidding package in which the package is self-inviting 15, with 3 the package is owned by the unit. other bidding.
- Building organization name: VIỆN THỦY CÔNG
- Construction capacity certificate code: 00002249
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hà Nội
- Field:
⚬ Khảo sát xây dựng:
⚬ Khảo sát xây dựng: Địa hình, Địa chất công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Nông nghiệp và Phát triển nông thôn
⚬ Giám sát công tác xây dựng công trình: Nông nghiệp và Phát triển nông thôn
⚬ Thi công xây dựng công trình: Nông nghiệp và Phát triển nông thôn
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông (cảng đường thủy)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật (cấp thoát nước)
⚬ Giám sát công tác xây dựng công trình: Nông nghiệp và PTNT (Thủy lợi)
⚬ Khảo sát xây dựng:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công trình phục vụ Nông nghiệp và phát triển nông thôn
- Lab name: Materials Research Department
- Laboratory code: LAS-XD 175
- Certifications:
⚬ Certificate 144/GCN-BXD
⚬ Certificate 930/GCN-BXD.
- Lab name: Materials Research Department.
- Laboratory code: LAS-XD 24.080
- Certifications:
⚬ Certificate 63/GCN-SXD Hà Nội
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 24 | 9.8% |
| Lower by 10% to 20% | 24 | 9.8% |
| Lower by 5% to 10% | 38 | 15.5% |
| Lower by 1% to 5% | 68 | 27.8% |
| Lower by 0% to 1% | 40 | 16.3% |
| 0% | 39 | 15.9% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 1 | 0.4% |
| Higher by 5% to 10% | 1 | 0.4% |
| Higher by 10% or more | 10 | 4.1% |
| Unknown | 0 | 0% |
| Total | 245 | 100% |
Hydraulic Construction Institute Won the bidding for the Thẩm tra báo cáo
nghiên cứu khả thi công trình package, which was invited for bidding by the Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 1 through an assign shorthand as an independent entity.
- Result: Won
14/01/2026 13:26
Hydraulic Construction Institute Won the bidding for the Verify the project feasibility study report package, which was invited for bidding by the Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 1 through an assign shorthand as an independent entity.
- Result: Won
14/01/2026 11:13
Hydraulic Construction Institute Won the bidding for the Package No. 2: Consulting on making economic and technical reports package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ - HẠ TẦNG XÃ ĐA PHÚC through an assign shorthand as an independent entity.
- Result: Won
14/01/2026 10:44
Hydraulic Construction Institute Won the bidding for the Verify the project feasibility study report package, which was invited for bidding by the Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 1 through an assign shorthand as an independent entity.
- Result: Won
14/01/2026 09:32
Hydraulic Construction Institute Won the bidding for the Consultancy and verification of construction investment feasibility study report package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng công trình Giao thông và Nông nghiệp tỉnh Thái Nguyên through an assign shorthand as master consortium of Liên danh Viện Thủy công - Công ty TNHH Tư vấn Đại học Xây dựng.
- Result: Won
07/01/2026 15:08
Hydraulic Construction Institute Won the bidding for the Package No. 01: Consulting, surveying, making economic and technical reports package, which was invited for bidding by the Ban quản lý Dự án đầu tư - hạ tầng xã Quảng Bị through an assign shorthand as an independent entity.
- Result: Won
25/12/2025 18:27
Hydraulic Construction Institute Won the bidding for the Bidding package No. 19: Consulting on survey, design of financial protection - additional estimates for Cam Son lake package, which was invited for bidding by the CÔNG TY TNHH MỘT THÀNH VIÊN KHAI THÁC CÔNG TRÌNH THỦY LỢI BẮC SÔNG THƯƠNG through an assign shorthand as an independent entity.
- Result: Won
22/12/2025 14:32
Hydraulic Construction Institute Won the bidding for the Bidding package No. 04: Consulting on verifying the F/S report package, which was invited for bidding by the CÔNG TY TNHH MỘT THÀNH VIÊN KHAI THÁC CÔNG TRÌNH THỦY LỢI BẮC SÔNG THƯƠNG through an assign shorthand as an independent entity.
- Result: Won
19/12/2025 16:13
Hydraulic Construction Institute Won the bidding for the Package 8: Consulting on supervision of construction of items: 09 Dai Tu Do notes and installation of 06 new manufacturing valve doors, European doors, hydraulic cylinder systems; Electrical control system, supervision for management and operation of works package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH NÔNG NGHIỆP VÀ PHÁT TRIỂN NÔNG THÔN THÀNH PHỐ HUẾ through an assign shorthand as an independent entity.
- Result: Won
19/12/2025 10:41
Hydraulic Construction Institute Won the bidding for the No. 03: Consulting in verification of feasibility research reports package, which was invited for bidding by the Ban Quản lý dự án Nhà máy Alumina Nhân Cơ Vinacomin through an assign shorthand as an independent entity.
- Result: Won
17/12/2025 08:28
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder Hydraulic Construction Institute participated in 268 package, of which 245 package was won, failed 18 packages, 4 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Hydraulic Construction Institute is related to 131 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Hydraulic Construction Institute competed with 98 contractors in 88 package, won 67 package, lost 18 package, 2 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor Hydraulic Construction Institute once entered into a partnership with 85 contractors in 89 package, won bid 78 package, lost 9 package, 2 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor Hydraulic Construction Institute participated in bidding in 30 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Hydraulic Construction Institute participated in bidding in 43 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor