Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors Viet Nam infrastructure development and construction consulting jsc are as follows:
You need to Login or Sign up to view all informations.
- Participated in 30 bidding packages, of which 25 were won, 4 were lost, 0 are pending results, and 1 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 98.46% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.74% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (3), Sơn La (2), Cần Thơ (1), Quảng Ninh (1), Thái Nguyên (1), Undefined (22)
- Has relationships with 18 Bid Solicitors
- Has competed against 29 contractors in 7 bidding packages, won 2 packages, lost 4 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 5 contractors in 6 bidding packages, won 2 packages, lost 4 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Published contractor selection plan of 3 project with a total of 8 of bidding packages.
- Invitation to bid 3 package (with 4 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 3 packages announced, canceled bids 0 packages (among the packages above).
- There are 0 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors Viet Nam infrastructure development and construction consulting jsc are as follows:
- As the investor of 0 investment and development projects.
- As the investor of 2 Contractor Selection Plan, including 2 self-published Contractor Selection Plan, 0 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 3 bidding package in which the package is self-inviting 3, with 0 the package is owned by the unit. other bidding.
- Building organization name: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ PHÁT TRIỂN HẠ TẦNG VIỆT NAM
- Construction capacity certificate code: 00004133
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hà Nội
- Field:
⚬ Lập quy hoạch xây dựng:
⚬ Giám sát thi công xây dựng công trình: Đường bộ
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Công nghiệp nhẹ
⚬ Giám sát thi công xây dựng công trình: NN&PTNT
⚬ Thi công xây dựng công trình: Đường bộ
⚬ Thi công xây dựng công trình: NN&PTNT
⚬ Khảo sát xây dựng: Khảo sát địa hình, địa chất công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông (đường bộ)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng, Hạ tầng kỹ thuật
⚬ Quản lý dự án đầu tư xây dựng: Dân dụng, Giao thông (đường bộ)
⚬ Quản lý dự án đầu tư xây dựng: Hạ tầng kỹ thuật
⚬ Giám sát công tác xây dựng công trình: Dân dụng
⚬ Giám sát công tác xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Công nghiệp, Hạ tầng kỹ thuật
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình: nhà công nghiệp; thủy lợi.
⚬ Quản lý dự án đầu tư xây dựng: Tư vấn quản lý dự án đầu tư xây dựng công trình: công nghiệp; thủy lợi.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 1 | 4% |
Lower by 10% to 20% | 3 | 12% |
Lower by 5% to 10% | 0 | 0% |
Lower by 1% to 5% | 3 | 12% |
Lower by 0% to 1% | 8 | 32% |
0% | 8 | 32% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 2 | 8% |
Unknown | 0 | 0% |
Total | 25 | 100% |
Viet Nam infrastructure development and construction consulting jsc Won the bidding for the Project management consultancy package, which was invited for bidding by the Viện kiểm sát nhân dân thành phố Hải Phòng through an assign shorthand as an independent entity.
- Result: Won
07/10/2022 17:13
Viet Nam infrastructure development and construction consulting jsc Won the bidding for the Consulting on making plans for local adjustment of construction planning package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng thành phố Ninh Bình through an assign shorthand as an independent entity.
- Result: Won
28/09/2022 11:20
Viet Nam infrastructure development and construction consulting jsc Won the bidding for the Consulting on making plans for local adjustment of construction planning package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng thành phố Ninh Bình through an assign shorthand as an independent entity.
- Result: Won
27/09/2022 15:09
Viet Nam infrastructure development and construction consulting jsc Won the bidding for the Consulting, surveying, making plans for local adjustment of construction planning package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng thành phố Ninh Bình through an assign shorthand as an independent entity.
- Result: Won
27/09/2022 15:04
Viet Nam infrastructure development and construction consulting jsc Won the bidding for the Consulting on surveying, making construction planning projects, setting planning tasks package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng thành phố Ninh Bình through an assign shorthand as an independent entity.
- Result: Won
09/06/2022 07:37
Viet Nam infrastructure development and construction consulting jsc Won the bidding for the Hire consultants, survey, prepare economic and technical reports for renovation and repair of lecture halls package, which was invited for bidding by the Hanoi Procuratorate University through an assign shorthand as an independent entity.
- Result: Won
24/04/2022 08:09
Viet Nam infrastructure development and construction consulting jsc lost the bidding for the Package 03: Consulting survey, making construction drawing design and construction cost estimate package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng thành phố Thái Nguyên through an Đấu thầu rộng rãi trong nước as master consortium of Công ty Cổ phần Tư vấn xây dựng và phát triển hạ tầng Việt Nam. Two other contractors also participated.
- Result: Lost
08/09/2021 14:24
Viet Nam infrastructure development and construction consulting jsc Won the bidding for the Tender package No 01: Project management consulting package, which was invited for bidding by the Maritime administration of Quang Ninh through an Đấu thầu rộng rãi trong nước as an independent entity.
- Result: Won
26/02/2021 11:03
Viet Nam infrastructure development and construction consulting jsc Won the bidding for the Package No. 1: Consulting for setting up tasks, cost estimates and preparing bidding documents for consulting bidding packages in the project preparation phase package, which was invited for bidding by the Hai Phong Bridge Projects Management Department through an assign shorthand as an independent entity.
- Result: Won
24/02/2021 17:02
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder Viet Nam infrastructure development and construction consulting jsc participated in 30 package, of which 25 package was won, failed 4 packages, 0 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Viet Nam infrastructure development and construction consulting jsc is related to 18 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Viet Nam infrastructure development and construction consulting jsc competed with 29 contractors in 7 package, won 2 package, lost 4 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor Viet Nam infrastructure development and construction consulting jsc once entered into a partnership with 5 contractors in 6 package, won bid 2 package, lost 4 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor Viet Nam infrastructure development and construction consulting jsc participated in bidding in 5 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,710 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code