DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: NATIONAL POWER TRANSMISSION CORPORATION
⚬ Old system: EVNNPT
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor NATIONAL POWER TRANSMISSION CORPORATION:
⚬ Contractor selection plan Phase 3 Project: Installing the second transformer at 220kV Phuoc An substation
- The following contractor selection plans have the investor National Power Transmission Corporation:
⚬ Approving the plan to select the 3rd phase contractor: Install the second transformer of 220kV Phuoc An transformer station
- The following bidding packages have the investor NATIONAL POWER TRANSMISSION CORPORATION:
⚬ Package 12: Construction supervision consultancy
⚬ Package No. 11: Construction insurance
⚬ Package No. 5: Supply and transport transformer 220kV-250MVA
⚬ Package 9: Construction and installation of stations (including supply and installation of fire protection systems)
⚬ Package 6: Supply and transport the first VTTB
⚬ Package No. 7: Supply, transport and install the second VTTB and TTLLSCADA
⚬ Package No. 8: Configuration service to expand computer control system
⚬ Package 13: Audit and report on finalization of completed projects
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Contractor selection plans for this project
| NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
|---|---|---|---|
|
1
|
71.330.909.000 VND |
||
|
2
|
216.028.000 VND |
||
Total amount |
71.546.937.000 VND |
||
Statistical table of bidding packages under the project
| Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
|---|---|---|---|---|---|---|---|---|
| Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
| 3 | 1 | 3 | 0 | 2 | 9 | 0 | 71.55 | 8 |